Durable Manual Operation Concrete Placing Boom
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Engineering Construction Durable Concrete Placing Boom
PARAMETERS
Manual concrete placing boom parameters
| |||
Specifications | 12meters manual | 15meters manual | 18meters manual |
The big arm design | Dual channel | Dual channel | Dual channel |
Radius of gyration (m) | 12 | 15 | 18 |
The height of the placing boom | 5 | 5 | 5 |
Diameter of conveying pipe (mm) | 125 | 125 | 125 |
Leg span (m) | 3.2*3.2 | 4*4 | 4*4 |
Rotation Methods | Manual | Manual | Manual |
The whole weight (kg) | 1100 | 1200 | 1300 |
With weight (kg) | 600 | 800 | 1000 |
Slewing bearing type | 315 | 315 | 380 |
Material | Channel angle | Channel angle | Channel angle |
Slewing range | 360° | 360° | 360° |
CHARACTERISTICS
1. Frame arm structure, increasing the loadingcapacity and stability.
2. Highquality rotary bearing, flexible rotation
3. Doublesupporting leg, improve the stability and bearing capacity of double
4. Withexcellent steel GB, the Firmness is Enhanced several times compared to Angleiron
5. Minimal impact on the appearance of vibrationforce
6. Withfour rope, ensure that the safety of product using.
PIPE SPECIFICATIONS
12M Concrete Placing Boom | ||
Name | Specifications | Quantity |
Straight Pipe | 3.67M | 1 |
| 4.24M | 1 |
| 5.6M | 1 |
Delivery Bend | 148-148 R275 90° | 2 |
| 157-148 R275 90° | 1 |
| R500 * 90° | 1 |
15M Concrete Placing Boom | ||
Name | Specifications | Quantity |
Straight Pipe | 3.67M | 1 |
| 5.56M | 1 |
| 5.8M | 1 |
Delivery Bend | 275*90 add pipe | 1 |
| 148-148 R275 90° | 1 |
| 157-148 R275 90° | 1 |
| R500 * 90° | 1 |
18M Concrete Placing Boom | ||
Name | Specifications | Quantity |
Straight Pipe | 3.7M | 2 |
| 3M | 1 |
| 7M | 1 |
Delivery Bend | R500 90° | 1 |
| R275 90° | 1 |
| R275 90° +130 | 1 |
| 157-148 R275 900 | 1 |
Delivery& packing & payment
1. FOB Tianjin or others.
2. Delivery time: within 15 days.
3. Packing: Export standard packing , Seaworthy packing,or according to the customer demand
4. Payment term: T/T, L/C.
5. MOQ: 1 set or according the actual situation.
- Q:What do concrete pumps and fabrics mean?
- Cloth machine, cloth form and automobile pump is similar, it is to use conveyor belt in the state without pressure to transport concrete, cloth machine is relatively heavy, slow walking, and the delivery of concrete material falls easily aggregate segregation
- Q:What is a fixed concrete distributor?
- Concrete distributing machine: special concrete pouring equipment for construction, design and production of railway beam yard and nuclear power plant
- Q:what's the difference between the fabric pump and boom pump?
- The inner climbing type distributor is not limited by height
- Q:What are the specifications of concrete spreader?
- Rotary: rotary, rotary and double rotary bearings; is a kind of new construction machinery and supporting the use of concrete conveying pump tube
- Q:How to fit the cloth rod of the distributor?
- Build a frame with a cloth pole for bearing and inspect and check the bearing capacity of the stressed part, the reinforcement condition of the double fasteners and the stability of the foundation
- Q:What is the structure of a concrete distributor?
- The vertical pipe has a rotary joint Gu card. By pulling the manpower, the whole turning part can be turned 360 degrees
- Q:What's the design plan of the concrete spreader?
- Hinge structure on the tape machine design by two light truss, is hinged on the frame of the rotary hopper, through a hinged cylinder between two truss angle adjustment according to needs; in the lower part of the tape machine, design a universal wheel, can move along the axial cylinder in truss drive, adjustable belt tail height
- Q:What are the monthly inspection items of the movable concrete spreader?
- Check cable, if damaged or aging, should be repaired and replaced immediately
- Q:What are the acceptance items of concrete spreader?
- Have product quality certificate, construction site cloth machine is reinforced
- Q:How to install and use the distributor?
- Construction cable must be overhead or buried in the ground, not flat and put. Construction work should be overhead, not line and wire to be flooded or buried by earth and stone. No wires should be tied to steel cage or other iron support at will
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Durable Manual Operation Concrete Placing Boom
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords