Durable Manual Concrete Placing Boom
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Engineering Construction Durable Concrete Placing Boom
PARAMETERS
Manual concrete placing boom parameters
| |||
Specifications | 12meters manual | 15meters manual | 18meters manual |
The big arm design | Dual channel | Dual channel | Dual channel |
Radius of gyration (m) | 12 | 15 | 18 |
The height of the placing boom | 5 | 5 | 5 |
Diameter of conveying pipe (mm) | 125 | 125 | 125 |
Leg span (m) | 3.2*3.2 | 4*4 | 4*4 |
Rotation Methods | Manual | Manual | Manual |
The whole weight (kg) | 1100 | 1200 | 1300 |
With weight (kg) | 600 | 800 | 1000 |
Slewing bearing type | 315 | 315 | 380 |
Material | Channel angle | Channel angle | Channel angle |
Slewing range | 360° | 360° | 360° |
CHARACTERISTICS
1. Frame arm structure, increasing the loadingcapacity and stability.
2. Highquality rotary bearing, flexible rotation
3. Doublesupporting leg, improve the stability and bearing capacity of double
4. Withexcellent steel GB, the Firmness is Enhanced several times compared to Angleiron
5. Minimal impact on the appearance of vibrationforce
6. Withfour rope, ensure that the safety of product using.
PIPE SPECIFICATIONS
12M Concrete Placing Boom | ||
Name | Specifications | Quantity |
Straight Pipe | 3.67M | 1 |
| 4.24M | 1 |
| 5.6M | 1 |
Delivery Bend | 148-148 R275 90° | 2 |
| 157-148 R275 90° | 1 |
| R500 * 90° | 1 |
15M Concrete Placing Boom | ||
Name | Specifications | Quantity |
Straight Pipe | 3.67M | 1 |
| 5.56M | 1 |
| 5.8M | 1 |
Delivery Bend | 275*90 add pipe | 1 |
| 148-148 R275 90° | 1 |
| 157-148 R275 90° | 1 |
| R500 * 90° | 1 |
18M Concrete Placing Boom | ||
Name | Specifications | Quantity |
Straight Pipe | 3.7M | 2 |
| 3M | 1 |
| 7M | 1 |
Delivery Bend | R500 90° | 1 |
| R275 90° | 1 |
| R275 90° +130 | 1 |
| 157-148 R275 900 | 1 |
Delivery& packing & payment
1. FOB Tianjin or others.
2. Delivery time: within 15 days.
3. Packing: Export standard packing , Seaworthy packing,or according to the customer demand
4. Payment term: T/T, L/C.
5. MOQ: 1 set or according the actual situation.
- Q:What is a fixed concrete distributor?
- Mobile concrete cloth machine "Z" shaped section three folding arm, 360 degree rotation, pitching and folding can achieve full amplitude, pouring in three-dimensional space within the length range of the arm, without pouring dead, can easily realize the concrete pouring construction, wall pipe, the column of various
- Q:How to maintain the concrete spreader?
- The lining of the silo is equipped with abrasion less material lining board to reduce material adhesion and reduce material arching
- Q:what's the difference between the fabric pump and boom pump?
- Boom pump itself has pumping function, cloth machine needs to buy drag pump matching use
- Q:What is the Hand operated concrete distributor?
- The distributor is reasonable in design, stable and reliable in structure, and adopts 360 degree full swing arm type fabric structure. The whole machine is easy to operate and flexible to rotate. It has the characteristics of high efficiency, energy saving, economy and practicality
- Q:What are the weekly inspection items for concrete spreader?
- Check the wear of the pipe, the arm thickness is less than 2mm, should be replaced in a timely manner
- Q:What are the benefits of concrete handling machines?
- The construction area of the crane pipe can not be reached, and the concrete distributor can be used instead
- Q:How to fit the cloth rod of the distributor?
- Place the distributing rod and its counterweight, and request that the center of the cloth pole must be 200~300mm overhead. The sleepers or wooden side will be set under the feet to see whether the cloth pole body is straight
- Q:What is the working principle of the distributor?
- When removing the cloth should be cleaned of residual concrete pump tube, then the weight of crane removed, then removed from the distributor to the specified location
- Q:What are the acceptance items of concrete spreader?
- The installation site should be carried out in advance according to the requirements of construction site should be collected, must be stable and firm installation, foot pad.
- Q:How to install and use the distributor?
- Construction cable must be overhead or buried in the ground, not flat and put. Construction work should be overhead, not line and wire to be flooded or buried by earth and stone. No wires should be tied to steel cage or other iron support at will
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Durable Manual Concrete Placing Boom
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords