• Condensing Unit for Cold Room System 1
Condensing Unit for Cold Room

Condensing Unit for Cold Room

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
1 Set set
Supply Capability:
100 Sets per Month set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

condensing unit

fan installed upward,without air recirculation. heat exchange ratio accelerating. 

Copeland/Tecunseh compressor

  • condensing unit

  • Copeland/Tecunseh compressor

  • Danfoss accessories

  • copper tube aluminum fin

  • integral installation,anticollision,rainproof structure feature.

  • efficient heat transfer surface,strong cold wind force,Superior reliability,long service life.

  • customized service available

  • fan installed upward,without air recirculation. heat exchange ratio accelerating.

 condensing unit refrigerating capacity ranks from 200W to 29000W.evaporating    temprature:-45°C—+15°C,running steady under  the ambient temperature +43°C.

 

                             model

 

feature

BFT30C

BFT40C

BFT50C

BFT60C

BFT70C

BFT80C

BFT100C

BFT120C

 

Refrigeration capacity(kw)

 

Medium temp.

6200

7700

9950

12400

14350

16100

21700

23100

Low temp.

3370

4250

6050

------

------

8250

12020

-----

Motor (w)

190

250

450

600

400

500

560

800

Fan diameter(mm)

400

450

500

550

400x2

450 x2

500 x2

500 x2

Air volume(m³/h)

4200

53800

7100

8400

8400

10760

12480

12480

caliber(mm)

In

16

16

19

19

25

25

28

35

Out

10

10

12

12

16

16

19

19

Demension(LxWxH)

738x445x1162

738x445x1162

940x465x1445

940x465x1445

1340x467x1410

1340x467x1410

1340x465x1410

1340x465x1410

Install demension(LxW)

668x500

668x500

870x520

870x520

1270x520

Q: How to decorate the mass concrete cooling water pipe
Cooling water pipes are not generally advocated! (because partial cooling is not enough after hydration), a temperature hole is set for observation: as long as the temperature difference between the inside and outside of concrete is not more than 25 degrees, no measures should be taken! If the temperature difference is too large, you can take insulation measures (also ensure that the temperature difference is not greater than 25 degrees)This should be the construction team to consider the matter, the design institute will not consider this, are generally handed over to the construction unitThe purpose is to take away the temperature rise of cement hydration in time, and there is no need to do any calculation. According to the water temperature changes during construction, it is good to arrange the water flow
Q: Is the cooling tube facing the light pressed E or E continuously?
Light up, press E, press E if you press it all the time, it doesn't respond
Q: What is the cause of the resonance in the cooling pipe of the central air conditioner?
Condensate pipe is said, the cause of this situation is mainly air conditioning pipe design is not good, exhaust pipe caused by internal condensation, water flow is not clear
Q: The engine cooling pipe is stiff and can not pinch
It shows that there is air and no circulation. It is recommended to clean up the air
Q: CSOL how do you use the cooling pipe?
E appears on the pipe and goes quickly. It's tragic when it's slow.
Q: In what circumstances should mass concrete be buried with cooling pipes?
Hydration heat is too large, external facilities can not guarantee the temperature difference between the internal and external, must be set.
Q: I now work in the design of power plant condenser - 60 Wanshui condenser. Now there are doubts on the condenser cooling pipe problem (water from the Yangtze River water, sediment, seawater intrusion, but there are problems) hope to teach master (the hope can make the economic efficiency and the performance of the condenser to achieve comprehensive optimization)
I suggest you use Navy brass tubes.
Q: Work on the coolant at work today the cooling pipe slid open spray clothes in some parts of the water, I just put clothes in front of the apple 5S mobile phone bag. The uncertain parts into the mobile phone bag clothes there is no spray to worry. Pocket inside the mobile phone will be sprayed into the water, how to identify, does it matter?
Can open to see the battery, there is a red place, then the water.
Q: What is the biggest difference between a plastic cooling pipe and a serpentine pipe, like a serpentine one? Are they all used on machine tools?
The 1. steps are: 1. General introduction. The necessary tools / raw materials, methods / procedures, points for attention2. common sense: answer the questions directly. Give specific reasons / reasons / introductions in detail3. reasons: 1. Explain the cause / reason in detail. Provide effective solutions (structure, see procedure class)4. other types see high quality standards
Q: My car is a 125CC assembly off-road vehicle. The engine is Tanaka's. Can this engine load the oil cooler?By the way, what is the lubrication of this engine?
I used to buy an oil cooler, but it doesn't work at all. Now I'm busy at home. I'll give it to you;Can only be installed in the oil port, due to the limitations of the design can only play the role of reducing pressure, the engine was actually with a waste pipe (exhaust gas purging and pressure), so this thing just decoration only, unless you love, if you consider the performance I suggest you modify the real oil cooler
We pursue the management tenet of "Quality is superior, Service is supreme, Reputation is first". We will sincerely create and share success with all clients. warmly welcome customers from all over the world to visit our factory and establish long-term business relationships with us for a bright future.

1. Manufacturer Overview

Location Shandong,China
Year Established 2002
Annual Output Value US$1 Million - US$2.5 Million
Main Markets 8.33% North America
8.33% South America
8.33% Eastern Europe
8.33% Southeast Asia
8.33% Africa
8.33% Oceania
8.33% Mid East
8.33% Eastern Asia
8.33% Western Europe
8.33% Central America
8.33% Northern Europe
8.33% Southern Europe
Company Certifications ISO 9001:2000;RoHS;CE

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a) Trade Capacity
Nearest Port Qingdao,shanghai,Ningbo
Export Percentage 41% - 50%
No.of Employees in Trade Department 3-5 People
Language Spoken: English
b) Factory Information
Factory Size: 5,000-10,000 square meters
No. of Production Lines 6
Contract Manufacturing OEM Service Offered Design Service Offered Buyer Label Offered
Product Price Range High and/or Average

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords