• concrete pole plant mould 10 meters System 1
  • concrete pole plant mould 10 meters System 2
  • concrete pole plant mould 10 meters System 3
  • concrete pole plant mould 10 meters System 4
  • concrete pole plant mould 10 meters System 5
concrete pole plant mould 10 meters

concrete pole plant mould 10 meters

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specifications

Concrete Pole Plant Mould 10 Meters

Length: 6m-18m
Top diameter: 150mm-230mm/required by buyer
Taper: 1:75/required by buyer
Advantage: high quality, easy operation

Concrete pole mould is used for electronic concrete pole making. Its mainly

manufacture technology is longitudinal tension by steel wires. Then it can

squeeze out the excess water in the concrete under the centrifugal force. Thus, it can greatly improve the concrete density and strength.

In order to form concrete more quickly to meet the design strength of more than 70%, steam curing can be carried out so as to shorten the mould-releasing cycle.

Features:

1. Welding technology, which enhances the smooth finish of the mould wall, and

eliminates the uneven traces of rivet holes. So the concrete poles appearance

will be improved significantly.

2. The cylinder is changed to Utype longitudinal stiffeners which can greatly

increase the stiffness and flexural strength of the steel mould,

3. Install the slot with rubber sealing strip, in order to prevent leakage to

ensure quality.

Technical Data:

Conical electric pole steel mould

Inner diameter of top end (mm)

Length (m)

Tread (m)

Running Wheel Diameter (mm)

Length (m)

Tread (m)

Running wheel diameter (mm)

100

67

2

/

600

/

/

/

130

68

150

611

170

712

190

713

15

2

650

230

69

12

270

6

9

270

6

9

283

6

600

/

/

310

69

650

/

/

350

6

9

700

390

6

700

9

750

430

6

750

/

/

470

6

780

/

/

510

6

800

9

850

550

6

850

/

/

Working Principle:

1. The steel mould should work together with pole spinning machine. The steel mould should be placed on the spinning machine smoothly.

2. Put the mixed slurry into the mould and rotate in different directions under the motor driven.

3. In this process, the redundant water in the concrete is released by the force of centrifugal, and the concrete is dense and high strength. And then, the pole forms around the inner wall of the pole mould.

Q:And all the major uses for them?Thanks :) 10 points to the best answer.
You see them on HVAC applications, like air handlers. Typical is an electric motor belt hooked up to a squirrel fan or maybe a conveyor belt. Rock quarries, huge exhaust fans, grain elevators, dryers. And of course back up generators like those with big diesel engines. And those old school saw mills you see at the State Fair that are hooked up to a coal fired steam engine. Good Luck!
Q:Of which do you partake most frequently? Killing, destroying, or wrecking machinery?
I swing a lot of baseball/softball bats....it just kinda depends on who or what gets in the way.
Q:Farm machinery operates under very difficult situation in the field. For example, paddy fields are muddy with pesticide, fertilizer and other chemicals in which tractors containing steel and aluminum components operate. This results in corrosion of metallic component. Propose methodology for preventing corrosion in farm machinery.
For those parts which do not get heated up,apply coal tar,(Damar in Hindi),so that water can't come in contact with them.It will not wear off that easily. With those parts that get heated up,apply coconut oil,once in two or four days, depending upon machinery's use.Again clean with fresh water apply oil.In this way,both the metals are easily saved.
Q:Trading of machinery, minerals, antiques
is worth two in the bush?
Q:Ready to study in Australia, intends to emigrate is learning mechanical engineering or electronic engineering is better?
In Australia, if you want to be an architect, an engineer, a voice, or a lawyer, you need to have a degree recognized by the association, after you check the location, pass the exam, and ask for some time
Q:What are the employment trends of mechanical majors?
There are a lot of work with mechanical design, process improvement, CAD drawing, NC too much, are you in the company, then the company according to your hobbies, combined with the company's need to arrange the specific work. That's basically the case.
Q:can we fly by using some anti-gravity shoes or opposite of gravity (negative gravity).
That is what they experience in space and moon. Although, they dont have anti gravity machine, its because of the existing environment. In order for you to fly, you have to escape the gravity of earth. Wind will assist you in achieving this by using aerodynamics principle.
Q:What methods and measures should be adopted for the maintenance of construction machinery?
The use of construction machinery for a long time, will produce Water Leakage and oil spills, leakage phenomenon, emergency plugging, more suitable for construction machinery in the tunnel for a long time, because of the limited working space, prone to hydraulic or diesel fuel tank due to collision caused leakage fault.
Q:whether machinery breakdown insurance excludes design defects defective workmanship?
I would think it would have an exclusion for that, so you would have to pursue the manufacturer.
Q:I want to sign up for a construction machinery rental company! What should I do? Steps? How much do you charge for a year?
Registered company each link required statutory time limit: check the normal circumstances within 2 working days to inform the result; account injection of bank procedures according to the provisions of the bank, usually in the 3 working days; verification under normal circumstances within 7 working days of the business license of the statutory time limit for 3 working days of audit group, tax registration certificate the statutory time limit for 30 working days to complete the registration fee: 1500 yuan single registration

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords