Cable Tie with High Quality and Releasable Price
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1000 Pieces m
- Supply Capability:
- 100000 Bags per Week m/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Material;Nylon 66, 94V-2 certificated by UL.Heat-resisting,Acid & erosion control, insulate well and not apt to age.
Operating temperature;-35 Degree to 85 Degree.
Color;Natural(or white, standard color),UV black and other colors are available as requested.
Size as Following:
ITEM.NO. | L | W(mm) | MAX.BUNDLE DIA.(mm) | TENSILE STRENGTH | ||
INCH | MM | LBS | KGS | |||
S-200RT | 8″ | 200 | 7.5 | 45 | 50 | 20 |
S-250RT | 10″ | 250 | 7.5 | 45 | 50 | 20 |
S-300RT | 12″ | 300 | 7.5 | 45 | 50 | 20 |
S-350RT-2 | 135/8″ | 350 | 8 | 45 | 50 | 22 |
S-400RT-2 | 15 3/4" | 400 | 8 | 105 | 50 | 22 |
S-450RT-2 | 17 3/4″ | 450 | 8 | 130 | 50 | 22 |
S-500RT-2 | 1911/16″ | 500 | 9 | 150 | 65 | 30 |
S-550RT-2 | 2111/16″ | 550 | 9 | 160 | 65 | 30 |
S-100RT-3 | 4″ | 100 | 2.5 | 22 | 18 | 8 |
S-145RT-3 | 6″ | 150 | 2.5 | 35 | 18 | 8 |
S-150RT-3 | 6″ | 150 | 3.5 | 35 | 40 | 18 |
S-300RT-4 | 11 5/8″ | 300 | 12.7 | 82 | 250 | 114 |
S-400RT-4 | 15 3/4" | 400 | 12.7 | 105 | 250 | 114 |
S-450RT-4 | 17 3/4" | 450 | 9 | 118 | 175 | 80 |
S-550RT-4 | 21 3/4″ | 550 | 9 | 160 | 175 | 80 |
S-780RT-4 | 3011/16″ | 780 | 12.7 | 230 | 250 | 114 |
- Q: Air source heat pump water heater how to install
- Open the TV above shows no signal, there is no correct election to the TV signal source
- Q: How to properly remove air conditioning in the absence of electricity
- 1. Fluoride: then the external machine of the high-pressure valve (thin tube) with a hexagonal wrench, closed, about 1-2 minutes after the closure of low-pressure pipe (thick tube). 2. Remove the pipe: with a movable wrench to high and low pressure pipe copper screw unscrewed. 3. Remove the internal and external cables. Open a plastic cover outside the machine, cable terminal can be seen, with a screwdriver screw off, remove the cable. (Do the mark, so as to avoid the next installation to line) 4. The machine (hang up) off, attached to the pipeline out. (Note: If you do not install a long time, also need to transport, it is best to tie in the pipeline on the cable removed, find the pipe and the machine's connecting nut, with two wrenches, And then the pipe plate is good) 5. Remove the wall of the machine hanging plate. (Hang up) 6. Remove the external machine, with two wrenches, the external machine 4 feet screw off, if the rust die also use the grinding machine to wear off the foot screw
- Q: The role of cable connector box classification installation requirements
- Although electricity and power generation are all power lines, they can be seen as two different systems. Therefore, when laying the cable, if the laying of the cable from the same bridge, the partition will be separated from the cable for future maintenance and maintenance. The The requirements of the partition depends on the depth of your bridge, the partition placed in the bridge, the bridge as high or slightly lower, if higher than the frame of the frame, affecting the beautiful, detailed provisions There is no ready-made plaintext.
- Q: Wire diameter of 15MM current transformer model for the BH-0.66- / 5LMK-0.66SDH-0.66 wear the core is very urgent online Thank you more
- Speed does not come to generally start the capacitor (capacity reduction) and centrifugal switch (open circuit) problem, of course, mechanical problems can also lead to can not start If you start again or the same as the first case, or stop a few minutes later is the same situation, you must focus on checking the mechanical failure (bearing) running capacitor burned should be a problem with the quality of the capacitor (pressure is not enough)
- Q: I would like to ask you friends, merchandise residential house inside the cable how to arrange, I saw in the weak box has a fiber optic cable home, that is, I do not know how to lay, I do not understand, I think you look, if the light cat and router can Placed in the weak box, the router from the router to the network assigned to each room, if the routing into the weak box will not be wireless signal attenuation, the younger brother is a novice, do not understand, please heroes branch try to jealousy Spring but Shanghai move, very grateful, no wealth value, I am sorry. More
- The top of the evil is seen in front of the poles, lampposts, trees and signs and so on. Who is the top of the evil, most of the adverse health. Modern buildings built very high, the top evil only five floors below the role. Resolving methods: in the door hanging convex lens, gossip or five emperor money. Convex mirror like a turtle shell in general, with a reflective effect, when there are pieces of evil objects rushed, the lens can be these evil spirits go. Bagua mirror, as the name suggests, for the eight kinds of hexagram corresponding to the eight field state. Which Taiji map concentrated the information of the universe balance, can play to resolve the evil spirits gas field to remove the negative terrain on their own impact. And the five emperor ancient money can increase the effectiveness of the lens. Really five emperors have effect, imitation of the ancient money is no effect.
- Q: Computer behind the wire is messy, what way to change the neat little Such as
- The wire stroked, stroked neatly tied with a few rope tied.
- Q: What is the name of this plastic buckle? Since the US military used to replace handcuffs, it must be very strong, what is the plastic? More
- Because the single-core tube, if there is a current flow from the wire. The metal sleeve will produce electromagnetic, and will heat, serious fire, so single-core cable shall not be alone in the steel pipe
- Q: Five ridge hoarding locusts on the high-chu chu chu chu floor layer. Two elevators tied side by side, to cloth video cable, how cloth ah? The The Online to say with the network cable, there is a direct use of coaxial video! I would like to ask how to use coaxial video cable cloth? The Will there be a reserved interface on the car? Or need to take electric drill to play the outer hole, the video line into the box to go inside? The High phone, detailed words ah! The The Thank you! The More
- The problem is very simple, the above two basic are explained clearly, I am not much here to say. It is important to note that non-professional personnel entering the elevator shaft construction must obtain the consent and coordination of the elevator maintenance personnel. Otherwise unauthorized access to the elevator shaft construction is not in line with the relevant state laws and regulations, but also very dangerous.
- Q: What are the precautions for using the cable mesh and how to use it?
- No instructions are clearly stated or allowed. In the "Code for Design of Electric Power Cables" (GB-2007), the provisions of 5.1.3 stipulate that if the number of cables in the same channel is large, if the laying of the multi-layer bracket on the same side, the following provisions shall be met: High to low power cables, strong to weak control and signal cables, communication cables "top to bottom" in the order. When the horizontal channel contains more than 35kV high-voltage cable, or to meet the introduction of the cabinet tray to meet the requirements of the bend radius requirements, should be "bottom-up" in order. In the same project or the cable channel extends to different projects, should be arranged in the same order. 2 bracket space by the channel space constraints, 35kV and below the adjacent voltage level power cables can be arranged in the same layer of support, 1kV and below the power cable can also be with the strong control and signal cable configuration in the same layer of the bracket. 3 The work of the same important circuit and the backup cable should be arranged on the different layers of the brackets. It is possible to note that it is restricted by passage space from section 2. If you really want to lay together, it should be noted that 10kV cable can not use single-core cable, you need to use three-core cable.
- Q: Fiber optic cable line card number of stars
- Colorful, dazzling, contests all kinds of colorful and eclectic variety of thousands of different kinds of description of different, different
1. Manufacturer Overview
Location | Zhejiang, China |
Year Established | 2009 |
Annual Output Value | Below US$1 Million |
Main Markets | North America South America Eastern Europe Oceania Mid East Eastern Asia Western Europe |
Company Certifications | ISO 9001:2000 |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | ningbo,shanghai |
Export Percentage | 81% - 90% |
No.of Employees in Trade Department | 3-5 People |
Language Spoken: | English, Chinese |
b) Factory Information | |
Factory Size: | 3,000-5,000 square meters |
No. of Production Lines | 5 |
Contract Manufacturing | OEM Service Offered Buyer Label Offered |
Product Price Range | High and/or Average |
Send your message to us
Cable Tie with High Quality and Releasable Price
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1000 Pieces m
- Supply Capability:
- 100000 Bags per Week m/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches