Fixing Ties with Fir-tree and Disc

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
1000 Pieces watt
Supply Capability:
50000 Pieces per Day watt/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Detailed Product Description

 

1.One-piece fir-tree design with disc is similar to push mount cable ties but the disc can enhance the stability of fixing and avoid dust and water invasion.

2.Additional cured tab below the buckle will fasten and maintain bundles on the axial.

3.Fir-tree push mount design applied to various thickness of board or one-side thread hole.

4.Applied to different industries such as automotive, aviation, white goods manufacture, and panel building.

5.Special specifications supplied by customers' order.

6.Material: Polyamide 6,6, UL94 V2

7.Color: Black

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the difference between cable wdz and cable wdzc?
WDZ-Low Smoke Halogen-free Flame Retardant Cable WDZN-Low Smoke Halogen Free Flame Retardant Cables,
Q:Into the line, wiring closet, weak wells What is the difference between what can be common. Patch panels and switches, routers, what is the difference. Thank you
My professional is to do this, but depends on your TV there is no audio output, it is very simple to use two sets of lines, do not control what is HDMI or color or video, respectively, connected to the TV. And then use the TV AV / TV to choose just like the protection of the pole pole pepper locust Ge Wei Gonglian, if the TV sound to the sound, first look at the TV output. If there is connected to the amplifier. Not on the set-top box assigned to the amplifier "answer is completed
Q:What is the difference between a hot melt connection and a hot melt connection?
No instructions are clearly stated or allowed. In the "Code for Design of Electric Power Cables" (GB-2007), the provisions of 5.1.3 stipulate that if the number of cables in the same channel is large, if the laying of the multi-layer bracket on the same side, the following provisions shall be met: High to low power cables, strong to weak control and signal cables, communication cables "top to bottom" in the order. When the horizontal channel contains more than 35kV high-voltage cable, or to meet the introduction of the cabinet tray to meet the requirements of the bend radius requirements, should be "bottom-up" in order. In the same project or the cable channel extends to different projects, should be arranged in the same order. 2 bracket space by the channel space constraints, 35kV and below the adjacent voltage level power cables can be arranged in the same layer of support, 1kV and below the power cable can also be with the strong control and signal cable configuration in the same layer of the bracket. 3 The work of the same important circuit and the backup cable should be arranged on the different layers of the brackets. It is possible to note that it is restricted by passage space from section 2. If you really want to lay together, it should be noted that 10kV cable can not use single-core cable, you need to use three-core cable.
Q:Is the cable clamp also divided into high voltage cable clamp and low voltage cable clamp?
Single-core cable line grounding line commonly used grounding 1. shield one end directly grounded, the other end through the protective layer to protect the ground: When the line length of 500 --- 700m and below, the shield can be used directly to one end of the ground (cable terminal Position ground), the other end through the protective cover to ground. 2. shield the midpoint of the ground: When the line length of 1000 ---- 1400m, the use of midpoint grounding. in the middle of the line position, the shield directly grounded, the cable ends of the shield through the protective cover to ground. The middle ground is usually required to install a straight connector. Install an insulated connector at the midpoint of the line. The insulated connector disconnects the cable shield, and the shield is grounded through the protective cover, and the two cables are shielded and grounded directly. 3. Shielded cross-connect cable lines are very long (1000 --- 1400m above), you can use shield cross-connect. This method is divided into three equal parts of the length of the three or three times the number of segments, each section between the installation of insulation joints, insulation joints between the three-phase shield with a coaxial cable, cross-linked box for transposition, cross The interconnection box is provided with a set of protective protector, and the two sets of insulated connectors are arranged on the line.
Q:How to train the dog to the designated place of urine
1. Fluoride: then the external machine of the high-pressure valve (thin tube) with a hexagonal wrench, closed, about 1-2 minutes after the closure of low-pressure pipe (thick tube). 2. Remove the pipe: with a movable wrench to high and low pressure pipe copper screw unscrewed. 3. Remove the internal and external cables. Open a plastic cover outside the machine, cable terminal can be seen, with a screwdriver screw off, remove the cable. (Do the mark, so as to avoid the next installation to line) 4. The machine (hang up) off, attached to the pipeline out. (Note: If you do not install a long time, also need to transport, it is best to tie in the pipeline on the cable removed, find the pipe and the machine's connecting nut, with two wrenches, And then the pipe plate is good) 5. Remove the wall of the machine hanging plate. (Hang up) 6. Remove the external machine, with two wrenches, the external machine 4 feet screw off, if the rust die also use the grinding machine to wear off the foot screw
Q:Will load 473KW current 560A need much cable, how big the casing
If the cable, the current should be appropriate to reduce, take 6-7A more appropriate. Total power 1300-1500W.
Q:How do I monitor the elevator? The The The
The problem is very simple, the above two basic are explained clearly, I am not much here to say. It is important to note that non-professional personnel entering the elevator shaft construction must obtain the consent and coordination of the elevator maintenance personnel. Otherwise unauthorized access to the elevator shaft construction is not in line with the relevant state laws and regulations, but also very dangerous.
Q:How do I train a dog for 4 months? The The The
Under normal circumstances it is better to do jumper. That is, all the switches of the telecommunications signal to do a patch panel and then your own line to do another patch panel above, when the signal when the jumper from the telecommunications patch panel to your users wiring Shelves on it, do not have to just remove the line on it.
Q:How to connect the high voltage distribution cabinet twice
. because the PVC trunking itself is very light, and easy to cut, so in addition to bulk cutting generally do not need mechanical cutting. . no pvc trunking 45 degrees angle of special tools, only do it yourself.
Q:How is the line of the patch panel in the LAN?
Can be removed after the general two sets of lines, a group of power lines, but the notebook screen power cord and desktop is not the same, usually 12v high pressure package, so you have to prepare 12v transformer power supply to it, the other line is the signal Line, and see a few cores, y should be able to add a conversion port into hdml line. But now based on the display price is not expensive, there is a risk of modification, personally feel that little, if the host is broken, the display intact, it is better to put Taobao, sell, sell money to buy a new desktop!
Our facilities are equipped with over 150 injection molding machines to produce full line of cable ties, stainless steel ties, wiring terminals, wiring ducts, flexible conduits, adaptors, and so on. The number of employees worldwide is around 1,500. We welcome customers from the entire world to cooperate with us.

1. Manufacturer Overview

Location Taiwan
Year Established 1976
Annual Output Value
Main Markets North America
South America
Eastern Europe
Southeast Asia
Africa
Oceania
Mid East
Eastern Asia
Western Europe
Central America
Northern Europe
Southern Europe
South Asia
Domestic Market
Company Certifications ISO 9001:2008;ISO 14001:2004;ISO/TS 16949

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port Laem Chebang/Thailand,Bangkok/Thailand,Donnguan/China
Export Percentage 91% - 100%
No.of Employees in Trade Department 21-50 People
Language Spoken: English, Chinese, Spanish, Japanese
b)Factory Information  
Factory Size:
No. of Production Lines Above 10
Contract Manufacturing OEM Service Offered Design Service Offered Buyer Label Offered
Product Price Range High and/or Average