Building Hoist 3000kg Single Cage New Design

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

Structure of Building Hoist Description

 

The general building hoist manufactured by our company have the features as good quality, long life, wide application range and convenient for maintenance. The gearing adopted bearing,enameled cable, and oil seal. The racks and pinion adopts specal material and heat-treatment technique, which prolong the life of these parts. The steel structure uses quality steel from famous domestic manufacturers. The surface of the structure can apply paint-spray, parkerizing baking finish or hot galvanizing processing according to users requirments. The cage can be produced and decorated by aluminum molded board, punched-plate or figured aluminum board.

 

Main Features of Building Hoist

 

1. The recomended cage dimension(L*W*H)(m): 2.0*1.0*2.5, 2.5*1.0*2.5, 2.5*1.3*2.5, 3.0*1.5*2,5, 3.2*1.5*2.5, 3.8*1.5*2.5, 4.0*1.5*2.5, 4.2*1.5*2.5 etc. We can also manufacture cages of other size according to the user.
2. The cage and the door material can be aluminum molded board, punched-plate, figured aluminum board or other type according to yout requirements.
3. The mast section and the tie-in surface can adopt paint-spray, or hot galvanizing processing.. 

Building Hoist Specifiction 

SC series product also has special design, such as reinforced guide rail with cross-section of 800mm, inclined type, special for cooling tower, etc. All the double cage building hoist can be changed into single cage type,

 

  TypePayload(kg)Lifting Speed         (m/min)Motor Power(kw)Safety Device
Single Cage HoistNo CounterweightSC1001000332*11SAJ30-1.2
SC1201200332*11SAJ30-1.2
SC1601600332*11SAJ30-1.2
SC2002000333*11SAJ40-1.2
SC2502500333*11SAJ50-1.2
SC2702700333*15SAJ50-1.2
SC3003000333*15SAJ50-1.2
SC3203200333*15SAJ50-1.2
With CounterweightSCD2002000332*11SAJ40-1.2
SCD2502500332*11SAJ50-1.2
SCD2702700332*15SAJ50-1.2
SCD3003000332*15SAJ50-1.2
SCD3203200332*15SAJ50-1.2

 

Images of Building Hoist

 

 

Building Hoist 3000kg Single Cage New Design

Building Hoist 3000kg Single Cage New Design

Building Hoist 3000kg Single Cage New Design

Building Hoist 3000kg Single Cage New Design

Building Hoist 3000kg Single Cage New Design

 

FAQ of Building Hoist

 

Q: What is the building hoist main purpose? 

A: Building hoist equipped with double or single cabin to transport the materials and labors up and down. It's the ideal 

construction equipment for vertical transportation in the field of construction.

Q: What is the main structure of building hoist? 

A: The P/M construction hoist mainly contains metal structure, driving system, electrical control system, cable guide & protection system, electrical top crane and safety device.  

Q: What is the meaning of the building hoist’s code?

 A: Take SC200/200 for example: “SC” stands for rack and pinion hoist, “200/200” stands for double cage and capacity is 2 tons per cage. “SC200” stands for single cage and capacity is 2 tons. 

Q: What is the dimension of the cage? 

A: Normally the cage dimension is 3X1.5X2.5M (L/W/H) for 2t type hoist. Details should be checked according to our quotation sheet. Also, the size can be customized according to the factual site condition.  There are two doors (entrance& exit doors) for each cage, It can be produced as up & down sliding or ramping model for safety and convenience.

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:The calculation of the use of electricity in the construction elevator
Use electricity in the field (1) lifting equipment class: tower crane 2, construction elevator 3; According to the table, K = 0.3 cos phi = 0.7 tg phi = 1.02 JC = 40% (temporary load) Pe = 2 times 63 + 3 times 11 = 159 (kW) And then power: PS = 2 times Pe = 2 times 159 = 201 (kW) Pjs1 = K * PS = 0.3 * 201 = 60.3 (kW) Qjs1 = tg phi by Pjs1 = 1.02 times 60.3 = 61.5 (kVA)
Q:How many kw is the sc construction elevator
The construction elevator sc200/200 is rated at 63 kw power, and the power consumption is greater.
Q:How many meters must be installed in the construction elevator search?
There is no hard and fast rules, but the construction unit according to the time limit for a project, the delivery of materials, construction personnel and management personnel, including supervision, need to install the vertical transportation machinery (including goods dual-purpose ladder).
Q:Are there any good signs in the construction elevator door
Above is construction, safety, please stay away from the ground.
Q:The elevator is banned from using elevators for more than a class of high winds
More than 6 levels of wind are forbidden to be removed and used. More than 4 levels of wind are not allowed to rise, and more than 6 winds are prohibited.
Q:How is the construction elevator installed
Construction elevator installation 1) the location of the elevator depends on the condition of the site and the equipment, so as far as possible, stay away from the overhead line and keep the safe distance specified. When the elevator is running, there is a lot of danger and should be avoided. 2) the order of installation is: 3) place the chassis on the base and the base pre-buried bolt, and the platform is placed on the chassis, and the basket is placed in the middle of the chassis. 4) to install the standard section, each installation of two standard sections (usually less than 8m) to be temporarily fixed. The wire rope shall be used for the use of the temporary cable, and the joints and supporting points shall be bolted and not tied with the lead wire. 5) the installation should alternate between the two columns. Node bolt specification must according to the aperture matching, not packing, found that the aperture position at the time, can not arbitrarily expanding, more can't to lead wire bundle, instead to avoid loose node deformation. 6) when installing the standard section, pay attention to the vertical degree of the guide, and the line of the guide line should not appear in the line of folding and too big clearance to prevent the collision from running. 7) when construction site conditions permit, it can be assembled on the ground and then hoisted on the whole to reduce the height of the work. Due to the design of the frame, the stress condition of the construction is only considered, so before the whole moving up, the counter can be temporarily strengthened to enhance the bending capacity of the nodes.
Q:Is the elevator detail a construction plan? Do you have a detailed picture of the elevator?
The construction diagram of the elevator appears to be a qualified elevator construction unit
Q:Where is the location of the elevator in the project
The position of construction elevator is usually set in the project to facilitate access to material, material handling and personnel up and down, not affecting the construction process.
Q:How to adjust the weight limit of the construction elevator
You're not going to be without a master You still look at the instructions
Q:The tower crane is on a surface with the construction elevator, and only 2 or 3 meters away. Is that allowed
Congratulations, it's a tragedy when you want to start the tower

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range