• Composite Geomembrane,One Geoxtetile One Film System 1
  • Composite Geomembrane,One Geoxtetile One Film System 2
Composite Geomembrane,One Geoxtetile One Film

Composite Geomembrane,One Geoxtetile One Film

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
10000 m²
Supply Capability:
300000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Structure of Composite Geomembrane Description:

Composite geomembrane (composite anti-seepage film) is divided into a cloth a membrane and two cloth film, 4-6 m wide, weighs 200-1500 g/m2, tensile and tearing resistance, bursting physical mechanics performance index is high, the product has high strength, good extension performance, large deformation modulus, acid and alkali, corrosion resistance, ageing resistance, good anti-seepage performance. Can satisfy the water conservancy, municipal, construction, subway, tunnel, the seepage control engineering construction crack, isolation, reinforcement, reinforcement and other civil engineering needs. Commonly used in dam seepage prevention and drainage ditches, and anti-fouling processing of scrap yard. 

2.Main Features of Composite Geomembrane:

High strength, good extension performance, large deformation modulus.

Acid and alkali resistance, corrosion resistance, ageing resistance. 

Good seepage control performance.

3.Specification of Composite Geomembrane:

Item
20-15
30-22
40-2850-35
Breaking strength at warp direction (kN/m) ≥20
304050

Breaking strength at 

weft direction  (kN/m) ≥
15
222835
Elongation at break (%) ≤28
282828
Bursting strength (kN) ≥1.6
2.4
3.24.0

4.Images of Composite Geomembrane:

Composite Geomembrane,One Geoxtetile One Film

Q:What material is used for waterproofing of tarpaulin
Polypropylene Coil is only suitable for use in the top, waterproofing membrane is mainly used for building walls, roof, and tunnels, highways, landfills, etc., to resist the external rain, if it is home improvement Waterproof with this is not good, with tar ingredients, pollution of the environment.
Q:How can the toilet waterproof works fail?
Use 755 new waterproof material can be painted three times. There is also a new type of waterproof material is water-like brush is also three times, you can go to the building materials market to see, you know.
Q:Can Henkel have water against him?
Add a small amount of water is possible because the premise of waterproofing should also be wet before the grassroots
Q:Roof for the insulation, Master roof, using two waterproof construction program
Third, security measures 1, firmly establish the "safety first, prevention first" safety production policy. Before the operation, the site management personnel must be to the operation team to carry out security technology to the end, and actively carry out pre-class security activities, security personnel check, supervise. 2, the roof around the poles outside the scaffolding (protective railings), roof construction is strictly prohibited removal. 3, roof construction, debris and other materials is strictly prohibited from the roof directly down throwing. 4, storage of coils and adhesives warehouse or site to prohibit the fireworks, for the use of fire, there must be fire prevention measures, and should set a certain number of fire extinguishers and sand bags. 5, oil drums should be flat, not two carrying, in the transport process, pay attention to balance, the spirit to focus, to prevent accidental fall caused harm. 6, transported to the roof of the material, should be scattered on average, with the use of transport, not concentrated stacking. 7, the use of torch, you should clear the surrounding flammable items, must be away from the base of oil, is strictly prohibited in the brush base oil area using the torch. Torch petrol should not be over full, cheer should not be too much, in the fire site must be equipped with fire equipment.
Q:Do you use the waterproof material on the building to be harmful to the human body?
If you are out of the finished line, the best anti-static that can! I plant is the production of waterproof material, in addition to the internship when I went to the workshop, and now I do not go!
Q:Cabinet is to buy finished products, or directly to the decoration company to do?
Do the cabinet can be in accordance with your size, finished cabinet moldy, which is not necessarily. You have to buy some of the Well
Q:I would like to ask how to do in the warm water above,
I do not do 80% of the warm water, of course, the use of good quality water pipes, waterproof water is generally done in the following to do, if done in the warm tube above will affect the heat of the floating, to warm the following covered with a Layer insulation layer and then covered with warm tube to, and then beat the water to ensure that no leakage. And finally in the above covered with wooden floor or floor tiles.
Q:What decoration materials, light and water, and the wall, the perfect combination of glass
Third, the mouth of the mouth, put pressure glue gun Cut the hose tube, fitted with a pointed nozzle, and then according to the size of the gap will be cut by 45 degrees angle. Install the glue gun.
Q:How does the waterproofing membrane work?
4, rolling the membrane: the first turn up the end of 1m long, with a long torch melting the bottom of the hot melt adhesive, the rapid paste fixed on the grassroots, and then re-harvest the rest of the volume. The gunmen stood on the paved webs, aligned with the corners of the rolls and the surface of the base layer with the flame of the long gun, and slowly rolled the edges by melting the hot melt. The web is pasted on the base;
Q:Js waterproof coating without powder can brushing
5. Coating maintenance: JS cement-based waterproof emulsion coating construction after 24 hours after the end with a damp cloth to cover the coating or spray water to maintain the coating, usually 2-3 days; air humidity, poor ventilation of the local dry The time period may be longer, and vice versa; 6. Check the construction of JS waterproof coating (closed water test): bathroom, pool and other parts in the JS cement-based waterproof emulsion waterproof layer after dry (at least 24 hours in summer, at least 48 hours in winter) stored water for 48 hours to see the water Construction is not qualified. Light wall must do the water test. JS waterproof coating See the amount of: under normal circumstances, the amount of about 0.6-1kg / ㎡, the actual amount from the use, the use of parts, rough surface roughness, environmental factors such as the decision.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords