• Aluminum Alloy Formwork For Walls System 1
  • Aluminum Alloy Formwork For Walls System 2
  • Aluminum Alloy Formwork For Walls System 3
  • Aluminum Alloy Formwork For Walls System 4
  • Aluminum Alloy Formwork For Walls System 5
  • Aluminum Alloy Formwork For Walls System 6
Aluminum Alloy Formwork For Walls

Aluminum Alloy Formwork For Walls

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
200 m²
Supply Capability:
50000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

concrete pouring aluminum formwork system


1. Light weight, high strength
concrete pouring aluminum formwork system Advantage

 

The data has proved that the flexural strength of aluminum is triple higher than ordinary steel.With weight of 20-25KG/M2. Aluminum formwork is the lightest formwork for construction,which makes for easy handling.

 

2. Various sizes, high accuracy

 

The construction drawing is designed with strict structure, with little measurement error and high accuracy,which is very suitable for high rise buildings.

 

3. Safe and convenient construction

 

High loading capacity requires less use of props, reducing lost in material and labor. Workers can independently operate after simple training. 

 

4. Long time used

 

With the lowest average lost, aluminum formworks can be used up to 300 times.

 

5. Wide range used

 

The precise-designed formwork system applies to all kinds of building elements, such as the main wall, column, beams, stairs and balconies.

 

6. Excellent quality


The concrete surface is very smooth, so it can saved the swing cost and shorten the construction period.

 

7. High efficiency

 

According to different climatic conditions, the formworks can be removed in 18-36 hours.

 

8. Recyclable value

 

The used aluminum material is of greater recyclable value,several times higher than steel.

 

9. Independent support system

 

The gap between the formwork support is totally enough for passing, moving and pulling.

 

10. Dependable safety, environmental

 

The construction process is totally safe. Full aluminum structure leads to no galvanization and thus minimizes the pollution to our earth

concrete pouring aluminum formwork system picture

Aluminum Alloy Formwork For Walls

Aluminum Alloy Formwork For Walls

Aluminum Alloy Formwork For Walls

Aluminum Alloy Formwork For Walls

 FAQ

1) What is the payment terms in our Company ?

Generally TT, LC At Sight, West Union , Moneygram . Besides , we can accept LC After Sight , DP etc.

2) Packing For Aluminum Formwork.

Nude or Pallet for Big Formwork and the Accessaries in PP bags.

3) Quality Guarantee

We have Strictly Quality-Inspection Department and we also can apply SGS and other Third-Party Agency to check the Products to make sure superior quality .

4) After Sales Service

We can send our engineer and sales manager to your job site for work and installation direction and make training for your workers .

5) Time of Delivery

We can overdo work for the customer to make sure the fast shipment


Q:What is the change in the aluminum template?
Aluminum template system components need to be designed according to the characteristics of the floor, the design of technical staff capacity requirements are higher. Approximately 80% of the modules in the aluminum template system can be recycled in multiple projects, while the remaining 20% can only be recycled in a class of standard floors, so the aluminum template system is suitable for high-level buildings with high levels of standardization. And villa group.
Q:Now the domestic use of aluminum template project more?
Construction of aluminum alloy template construction advantages are: 1, the construction period is short, four to five days can be a layer; 2, re-use more than 200 times, effectively reduce costs; 3, artificial reduction of 30%, construction convenience, high efficiency; The template 2 times the bearing capacity, good stability, high bearing capacity;
Q:In the Sheng-aluminum template installation workers, how to develop prospects
Can go to feel, the elimination rate is very high, most of them are left, remember: have the strength to be able to endure hardship, to listen to Sheng Sheng, if you do not need special money, and physical fitness is not good, labor intensity More than your imagination
Q:What is the development prospect of aluminum template design?
High quality and stable performance: aluminum alloy template level and vertical degree can be a good guarantee, and the template itself does not absorb water, concrete molding quality is high, so no need for expensive and long plaster work, tiles can also be directly pasted in Inside and outside the wall. In addition, the aluminum alloy template system is based on architectural drawings and then accurate use of computer software and machinery made, so the construction of high precision, especially doors and windows, hydropower equipment with the location and size are accurate and effective Reduce the amount of construction materials used in the latter part of the construction, cost savings.
Q:Whether a shear wall aluminum template and wood template can be mixed
Mixed with the two kinds of templates will be fixed in different ways, the construction of the security caused a certain impact; intersecting joints prone to the wrong layer and honeycomb; two templates expansion coefficient, strength, water retention will not cause the same shear Wall as a whole;
Q:Aluminum template of the aluminum template advantage characteristics
Aluminum template system components need to be designed according to the characteristics of the floor, the design of technical staff capacity requirements are higher. Approximately 80% of the modules in the aluminum template system can be recycled in multiple projects, while the remaining 20% can only be recycled in a class of standard floors, so the aluminum template system is suitable for high-level buildings with high levels of standardization. And villa group.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords