Auto Lifting Equipment

Hot Products

FAQ

Mechanical bearings, all types? Roughly
The separable bearing is composed of a raceway and a needle roller and cage assembly that can be arbitrarily assembled with a punched thin raceway (W) or a machined thick raceway (WS). A non separable bearing is an integral bearing consisting of a precision machined raceway and a needle and cage assembly. This type of bearing can bear one-way axial load. With small space, it is beneficial to the compact design of machinery. Most of them only use needle roller and cage assembly, and the installation surface of shaft and shell is used as raceway surface.
What are the mixing arms of the concrete mixer?
Mixing arm concrete mixer is a component of the mixing arm itself and divided into lateral mixing arm (positive and negative points), stirring arm (also have positive and negative points), stirring arm below is the bearing seat connected, connected with 4 sets of high strength bolts with stirring arm. The top is equipped with wear-resistant mixing blades, connecting with mixing blades, high-strength bolts 2 sets. In addition, some manufacturers have designed mixing side bonded shaft swivel, is installed in the interval between the stirring arm fixed and rotated in two ways.
Where are the hanging baskets for the building?
It is strictly prohibited to use hanging baskets as vertical transport facilities for personnel and materials; no staff member is allowed to climb from a basket to a B basket
What is a door rack for a construction site? How high is it generally?
This depends on the erection of the height of the general 3 steps and within 5-6 yuan a meter, assuming the erection of 4.5 meters high, 22.5-27 yuan a square. This is calculated in accordance with single-layer, the higher the more expensive, 9 meters in 65 yuan or so square. In accordance with the establishment of meters, in accordance with the erection of the volume of the calculation.
What are the principles, performances and uses of the commonly used construction machinery equipment?
1.: concrete pump principle: concrete pump driven by motor pump system, the conveying capacity of constant power control of hydraulic system of concrete pump automatic control, manual control can also be used to select the concrete delivery volume. Performance: 1. using the hydraulic system of double pump double open circuit, the main pump valve swing circuit and S circuit are separate for fault diagnosis and removal; 2. pumping hydraulic circuit adopts the main valve pilot pressure control; 3. hydraulic system has safe relief protection, while the main pumping system overpressure, oil pump automatic pressure cutting off; 4. switching circuit with constant voltage supply with the energy storage device, so as to guarantee reliable swayingforce large and have the advantages of energy saving effect; 5. pumps and valves are used continuously, the world famous brand is more reasonable and more reliable and easily realized commodity concrete transport quantity adjustment; 6. hydraulic pipeline with cone seal pipe joint sealing material; 7. pumping circuit adopts a valve block mode of high and low voltage switch, convenient, no leakage; 8. with oil and oil filter technology, foreign body into the hydraulic system. Further improve the hydraulic system reliability and component life; 9. hydraulic hose hose. Use: widely used in commercial concrete demand for large, high grade and strict quality requirements, long conveying distance of high-rise buildings, municipal construction, electric power, energy, transportation and other civil and industrial buildings, especially the construction of the narrow space more show its true colour of a hero.
What kind of electrical equipment do you have? What are the main components of each device?
Electrical equipment mainly refers to the transformer, reactor, capacitor, combination electric appliance, circuit breaker, transformer, lightning arrester, coupling capacitor, transmission line, power cable, grounding device, generator, condenser, motor, closed busbar, thyristor.
What measures can effectively reduce the construction accident rate?
Hefei construction workers training _ limited energy or hazardous substances: conditions of actual technical and economic constraints, some risk sources can not be eradicated, then they should try to limit with energy or hazardous substances, reduce the risk of. Reduce the amount of energy or dangerous substance.
How are the machine parts stacked?
Classification ah! Put small pieces of different sizes and functions into boxes and attach labels; larger items can be placed outside in a certain order (for example, function, length, value, etc.)