• Tower Scaffolding Vertical Support System System 1
  • Tower Scaffolding Vertical Support System System 2
Tower Scaffolding Vertical Support System

Tower Scaffolding Vertical Support System

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m²
Supply Capability:
1000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1. Structure of Tower Scaffolding Vertical Support System

Shoring tower is an effective supporting system. It is easy to assemble and dismantlement, and has excellent stability and bearing capacity. It has been widely used in the construction of industry & residential buildings , bridges, tunnels and dam project, etc.

 

2. Main Features of Tower Scaffolding Vertical Support System

1. Spatial tower assembly guarantees high load-bearing capacity.

Like RL-scaffolding, tower scaffolding also forms spatial tower structure, which guarantees excellent load-bearing capacity and its assemble is faster by means of standard frame.

 

2. Product standardization, produce cost is lowered.

We design kinds of specific specification of frame with different sizes; the introduction of Robot Weld technology improves production efficiency and production capacity.

 

 

3. Tower Scaffolding Vertical Support System Images

Tower Scaffolding Vertical Support System

 

Tower Scaffolding Vertical Support System

 

4. Tower Scaffolding Vertical Support System Specification

Tower Scaffolding Vertical Support System

 

5. FAQ of Tower Scaffolding

1) What can we do for you? 

We can ensure the quality of the Tower Scaffolding Vertical Support System and avoid extra expenses for customers.    

We can provide you the professional design team.    

We can provide fashionable and newest styles for you.    

We can design the artwork for you.    

Please feel free to customize.  

2) What promises can be done by us?

If interested in Tower Scaffolding, please feel free to write us for any QUOTE.

If printing required, please advise asap because the whole set need much more time to complete.

Please DO check goods when courier knocks your door and contact us asap if any issue.

3) What about of our after-sale service?

Response will be carried out in 24hours  after receiving any complain or request.

If the products are not based on the requirements, there will be the relevant compensations made for you.  

4) What about the package and shipping time?

Packing:  As Customer's Requirements

Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.  

Shipping time:Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. Other mass qty of Tower Scaffolding Vertical Support System, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days. 

Q:Construction safety inspection standards (JGJ59-2011) a total of several inspection items, respectively, what
The actual score of each item in the checklist should be calculated as follows: A1 = B * C / 100 where: A1 - the summary table is the actual score of the sub-item; B- Full score; C-check the score score.
Q:Brief description of what is the danger source of the squad leader
(EPS) or extruded board (XPS), which is made of polymer mortar, fiberglass mesh, flame retardant molded polystyrene foam board (EPS) or extruded board (XPS), etc
Q:Rt, 3ks, as far as possible Please ask questions: is the construction site, there are other sites? More
As the external scaffolding (including the bridge scaffolding and the basket) to withstand the limited load capacity is limited, so generally do not use the tower directly to the outer scaffolding supply; when the use of its supply, the need to take specific conditions, respectively, the following measures: (2 to 3 layers, with tower crane installation); 2) the use of small groups of small containers, the overall lifting of the lifting of the body , Respectively, to the operating site; 3) in the scaffold set on the small hopper (need to add appropriate support), the mortar were unloaded in a small hopper When using other vertical transport facilities, trolleys (tricycles, two-wheelers and all kinds of special trolleys) are generally used for horizontal transport Its carrying capacity depends on the number of cars can be loaded at the same time as a unit of time to enhance the number of times Installation conditions The location of the vertical installation shall be fitted with suitable installation conditions, such as a reliable foundation, structural ties and horizontal transport conditions equipment performance must be considered to meet the construction needs and give full play to the effectiveness of equipment When the vertical phase of the construction phase of the phase difference between the poor, should be set up and adjust the vertical transport equipment in phases, the timely removal of equipment has been unnecessary the full use of equipment to make full use of existing equipment, if necessary, the acquisition or processing of new equipment The prospects for future use should be taken into account when acquiring or processing new equipment The use of equipment should be considered in the use of Bi after the change can be used
Q:Construction safety inspection score summary of the supervision unit, construction unit inspection opinions how to fill?
Safety crates, safety nets, protective gloves, protective masks, protective goggles; tower cranes, construction lifts, construction hoists, ,
Q:March 20 Beijing-Zhuhai high-speed explosion, occupying the emergency lane of the car all the firefighters with forklift shovel high-speed, insurance does not lose money.
Quantitative analysis of the problems in safety construction. In order to solve this problem, you must first understand the specification. However, the specification is not enough, not only to understand the safety load of scaffolding. Please forgive me, I am not here, in the past, it is too much trouble. In this process, the construction specification is calculated. Technical specification for safety of fastener type steel pipe scaffold (JGJ130-2001)
Q:What kind of special jobs are available at the construction site?
62-1 meet the requirements 2 trench may not be backfill with water, backfill should be dense Section 4
Q:What are the contents of the safety and civilized construction measures?
The loss rate of the working material, the project as a unit for assessment, assessment period for the project construction period. Loss rate with the company to improve the management level to adjust, according to the following objectives for assessment. Steel pipe: loss rate of 1.8% or less Fastener: loss rate of 3.5% or less steel mold: loss rate of 3.5% within the quick release combination template and support part: loss rate of 3.5% or less bowl button scaffolding: loss rate of 1.8% Inside the door scaffolding: loss rate of 1.8% or less
Q:Why is all the civil safety information, there is no special decoration safety information? More
Test thermal conductivity is generally chosen to test the heat flow meter
Q:What are the five accidents in the construction industry?
The top is definitely to hang, with the top of the space to stay between one meter is the best, in the ceiling of the time, such as with a buckle plate, in the buckle inside plus a layer of rock wool, 3-5 cm thick, Remember to install the time as far as possible not to flatten the cotton, will affect the effect. Brick wall outside or inside, do insulation layer, if the money, but also with rock wool or foam board and the like, if the foam board, the thickness of not less than 6 cm, 10 cm best. Glass surface, this does not spend money is to die, do not spend on the outside hanging sun curtain, cloth and the like, if you want to see, to brush transparent insulation coating, but the price is high.
Q:What is a new construction technology, new technical information
I think you can not send a copy of the top of the usurpation of a single person who would like to give you a water, to Google search, you can say that you can not think of, there is no there. If you do not understand Hi me.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products