Tower Scaffolding Vertical Support System

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m²
Supply Capability:
1000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1. Structure of Tower Scaffolding Vertical Support System

Shoring tower is an effective supporting system. It is easy to assemble and dismantlement, and has excellent stability and bearing capacity. It has been widely used in the construction of industry & residential buildings , bridges, tunnels and dam project, etc.

 

2. Main Features of Tower Scaffolding Vertical Support System

1. Spatial tower assembly guarantees high load-bearing capacity.

Like RL-scaffolding, tower scaffolding also forms spatial tower structure, which guarantees excellent load-bearing capacity and its assemble is faster by means of standard frame.

 

2. Product standardization, produce cost is lowered.

We design kinds of specific specification of frame with different sizes; the introduction of Robot Weld technology improves production efficiency and production capacity.

 

 

3. Tower Scaffolding Vertical Support System Images

Tower Scaffolding Vertical Support System

 

Tower Scaffolding Vertical Support System

 

4. Tower Scaffolding Vertical Support System Specification

Tower Scaffolding Vertical Support System

 

5. FAQ of Tower Scaffolding

1) What can we do for you? 

We can ensure the quality of the Tower Scaffolding Vertical Support System and avoid extra expenses for customers.    

We can provide you the professional design team.    

We can provide fashionable and newest styles for you.    

We can design the artwork for you.    

Please feel free to customize.  

2) What promises can be done by us?

If interested in Tower Scaffolding, please feel free to write us for any QUOTE.

If printing required, please advise asap because the whole set need much more time to complete.

Please DO check goods when courier knocks your door and contact us asap if any issue.

3) What about of our after-sale service?

Response will be carried out in 24hours  after receiving any complain or request.

If the products are not based on the requirements, there will be the relevant compensations made for you.  

4) What about the package and shipping time?

Packing:  As Customer's Requirements

Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.  

Shipping time:Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. Other mass qty of Tower Scaffolding Vertical Support System, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days. 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Construction safety inspection standards (JGJ59-2011) a total of several inspection items, respectively, what
Thickness and material is not the same ah also heat resistance is also different ah.
Q:1 cubic tap water there is no way to reduce the water temperature to 15-18 degrees
Not very clear, continue to learn it hope my answer can help you, do not reward, as long as you top me.
Q:March 20 Beijing-Zhuhai high-speed explosion, occupying the emergency lane of the car all the firefighters with forklift shovel high-speed, insurance does not lose money.
Quantitative analysis of the problems in safety construction. In order to solve this problem, you must first understand the specification. However, the specification is not enough, not only to understand the safety load of scaffolding. Please forgive me, I am not here, in the past, it is too much trouble. In this process, the construction specification is calculated. Technical specification for safety of fastener type steel pipe scaffold (JGJ130-2001)
Q:Wanzhou District housing notarized brick structure is how much money per square meter
Is the set of quotas, there will be poor material adjustment. Now this process is generally not set quota. Both sides follow the market to discuss the price
Q:How many special types of personnel are required for the construction industry?
Perlite is a volcanic eruption of acid lava, the rapid cooling of the vitreous rocks, because of its pearl fracture structure named. Perlite deposits include perlite, obsidian and pine rock. The difference between the three is that the perlite has a circular arc-shaped crack formed by condensation, called perlite structure, water content of 2 to 6%; pine rock has a unique pine resin luster, water content of 6 to 10%; obsidian with glass Gloss and shell-like fracture, water content is generally less than 2%. You say the bubble, look at your description, is a chemical product, the main ingredient is benzene. Polystyrene foam board - also known as foam board, EPS board is made of volatile liquid blowing agent containing polystyrene beads, heated by the preheated in the mold after heating the formation of white objects, its fine The structure of the obturator is mainly used for building wall, roof insulation, composite board insulation, cold storage, air conditioning, vehicle, ship insulation, floor heating, decorative carving and other uses are very extensive. Perlite is generally flame retardant, foam board is a high price of flame retardant, one is not flame retardant cheap flame retardant meaning is not what we think, in fact, is not going to spread probably means that will be from Off, leave the open fire will automatically go out.
Q:There are several special construction projects in the construction project?
What is the exterior scaffolding erection specification? What do you need to pay attention to?
Q:What are the safety protection appliances, machinery and equipment, construction machinery and accessories for construction enterprises?
Construction of special types of work are: electrician, electric welder, shelf workers, tower crane driver, tower crane Division workers, tower crane signal workers, the documents required by the relevant departments for training.
Q:Hello, can you send me an electronic version of the current building code? Thank you, email lyslzsuiyandong@163.com
A project floor-style double row scaffolding more than 30 meters, does not meet the specifications,
Q:Summary of the construction safety check score after the summary score how to count
Wall panels and steel structure quota may also have to wait a few years after the quota can be developed, so you still ask the wall manufacturers, I give you recommend: double wall, directly on the Google search can be found.
Q:Brief description of what is the danger source of the squad leader
(EPS) or extruded board (XPS), which is made of polymer mortar, fiberglass mesh, flame retardant molded polystyrene foam board (EPS) or extruded board (XPS), etc

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range