Construction Scaffolding Tower System

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Place of Origin:
Beijing China (Mainland)


Model Number:
GTJ-R071
name:
Construction Tower Ringlock Scaffolding System
material:
Q235
thickness:
1.6mm to3mm or as your requirements
surface Treament:
as your requirements
standard:
use your standard or international standard

Packaging & Delivery

Packaging Detail:CARTONS THEN ON PALLET,OR AS YOUR REQUEST.
Delivery Detail:WITH IN 25 DAYS

Specifications

1. Reliable performance
2. Corrosion resistance
3. Durable finish standards

     Construction Tower Ringlock Scaffolding System      

1. Product Information

Name

Size

Material

Tube size

Surface

Theoretic weight

Vertical Standard

1000mm

Q345 Steel or Q235 Steel

Φ48.3*3.2mm

Galvanized

4.97kg

1500mm

7.46kg

2000mm

9.94kg

2500mm

12.43kg

3000mm

14.91kg

Ledger

600mm

Q345 Steel or Q235 Steel

Φ48.3*3.0mm

Galvanized

2.34kg

900mm

3.35kg

1000mm

3.67kg

1200mm

4.40kg

1500mm

5.33kg

1800mm

6.32kg

2000mm

6.90kg

Base Jack

600mm

Q345 Steel or Q235 Steel

Φ38*4.0mm

Electro galvanized

4.60kg



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the special types of jobs that need to be certified?
1. Civilized construction program 2. Safe construction program 3. Template construction program 4. Scaffolding construction program 5. Sambo four construction program 6. Temporary electricity construction program 7. High operating construction program 8. Tower crane construction plan 9. Multi-tower operation anti-collision construction program 10. Emergency emergency plans 11. Winter rainy season construction program 12. Significant hazard assessment measures 13. Construction organization design 14. Building energy conservation program 15. Basket construction program 16. Tower crane hoisting program
Q:I am in urgent need of emergency contingency plans
You can refer to the "town gas design specifications" above should be a detailed description
Q:Discussion on the Selection of Tower Crane in High - rise Building
project overview (project location, building height, ) the scaffolding erection form (floor type, steel cantilever) and erection parameters (erection height, vertical pole distance, distance, step, even the wall spacing, steel spacing, steel length, etc) construction and deployment (quality Safety management system; materials, equipment and labor organization; construction schedule, etc) scaffolding construction requirements and technical measures scaffolding construction and quality and safety management contingency plans scaffolding calculation book related accessories and charts Flat layout map, scissors supporting the elevation map, even the wall pieces of Fu Fung Phoenix Yu Hao Feng pupil tripod map, pole base node map, etc)
Q:What are the special construction plans for the rainwater tank culvert project?
Machine tools: responsible for the engine, gearbox, brake system, steering system, cooling system (not air conditioning), chassis and so on
Q:The basic form of the outer scaffolding is filled in
Hello's ① China Knowledge Network Ye Hao, Wanfang data Ye Hao have examples
Q:What is the maximum lifting capacity of the tower crane
The position of the two adjacent rods should be staggered, should not be set in the synchronization, the synchronization of a vertical separation of the two joints in the height of the side of the length of the function of the population can not be less than 0
Q:1 cubic tap water there is no way to reduce the water temperature to 15-18 degrees
Not very clear, continue to learn it hope my answer can help you, do not reward, as long as you top me.
Q:March 20 Beijing-Zhuhai high-speed explosion, occupying the emergency lane of the car all the firefighters with forklift shovel high-speed, insurance does not lose money.
Ice in the water like the food market has seen a lot of frozen fish should not be expensive
Q:Summary of the construction safety check score after the summary score how to count
In each new site to use the scaffolding, before erection, each batch, whether new or old, or rent, buy their own, have to bring the inspection and testing of qualified testing organizations testing.
Q:Brief description of what is the danger source of the squad leader
Scaffolding in the structure, vertical and horizontal vertical scissors, even wall pieces, horizontal scissors support, vertical pole, horizontal spacing, horizontal bar step, steel pipe connection, fasteners, pole base, vertical, sweeping the ground, etc , JGJ130-2011 "construction of fasteners steel scaffold safety technical specifications" on the complete provisions In addition to meet the structural requirements, the calculation of the body of the frame must meet the requirements

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range