mobile Tower Scaffolding construction

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Place of Origin:
Guangdong China (Mainland)


Model Number:
MSS-II
excellent quality:
competitive prices

Packaging & Delivery

Packaging Detail:in carton
Delivery Detail:22 days

Specifications

scaffolding mobile tower with different height

DescriptionFinishmentQuantityWeight(kg)
3'x6'8" Snap-on Lock Ladder Frame(Single Box)Powder Coat417.48
Guard Rail Post 3 Rivets Snap-onElectric Galv.43.35
7'x4' Cross Brace Snap-onElectric Galv.45.9
7' Guard Rail Snap-onElectric Galv.43.61
3' Guard Rail Snap-onElectric Galv.41.8
7'x19" Alumunium Plywood DeckNature Colour113.24
OutriggerPowder Coat49.3
8" Eagle Caster with BrakesElectric Galv.85.35
Couping Pin 1/8" CollarElectric Galv.80.3
Spring RetainerElectric Galv.80.03
Snap PinElectric Galv.160.06




Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the special types of jobs that need to be certified?
As the external scaffolding (including the bridge scaffolding and the basket) to withstand the limited load capacity is limited, so generally do not use the tower directly to the outer scaffolding supply; when the use of its supply, the need to take specific conditions, respectively, the following measures: (2 to 3 layers, with tower crane installation); 2) the use of small groups of small containers, the overall lifting of the lifting of the body , Respectively, to the operating site; 3) in the scaffold set on the small hopper (need to add appropriate support), the mortar were unloaded in a small hopper When using other vertical transport facilities, trolleys (tricycles, two-wheelers and all kinds of special trolleys) are generally used for horizontal transport Its carrying capacity depends on the number of cars can be loaded at the same time as a unit of time to enhance the number of times Installation conditions The location of the vertical installation shall be fitted with suitable installation conditions, such as a reliable foundation, structural ties and horizontal transport conditions equipment performance must be considered to meet the construction needs and give full play to the effectiveness of equipment When the vertical phase of the construction phase of the phase difference between the poor, should be set up and adjust the vertical transport equipment in phases, the timely removal of equipment has been unnecessary the full use of equipment to make full use of existing equipment, if necessary, the acquisition or processing of new equipment The prospects for future use should be taken into account when acquiring or processing new equipment The use of equipment should be considered in the use of Bi after the change can be used
Q:What are the main points in the inspection of building safety data?
Better with styrofoam, that is, can be insulated and heat.
Q:Discussion on the Selection of Tower Crane in High - rise Building
Now the construction of the scaffolding of the steel pipe specifications are two: diameter of 48mm wall thickness 3 bones of the fence section of the lettles of the wind. 5mm; diameter 51mm wall thickness 3.0mm
Q:Seeking architectural internship diary, at least sixty, can be a different project, a project five or six of the do not made
Seeking "industrial furnace masonry construction and acceptance of norms" GB-2004 electronic version, urgent use! If appropriate to add bonus points more
Q:How to review the special construction of steel structure
Carbon rods because of the weight of light elasticity is good, is the first choice for the selection of hand Brand do not know how much your budget is The following description is the price of each: If the recommended purchase of 300 yuan Guangwei, the advantages of reliable quality, work more fine, the disadvantage is heavier weight, tone too hard, feel the wood 300-600 yuan recommended to buy Di Jia, the advantages of Guangwei, the shortcomings of the tone is soft, especially the long point of the fishing rod, holding in the hands of a flash, feeling like a root noodles like 600-900 yuan recommended the purchase of the Pacific, the Pacific low-grade bar quality is not very good, in the high-end above the fishing rod can, whether it is feel or workmanship is more like the kind of feeling More than 800 yuan on the price are belong to the high-end fishing rod, and the more famous is the Dawa and Simano's fishing rod, and the price of 600 - between, there are a variety of fishing rods can choose, Good, feel good, the quality is also good, but the high-end lever gives the feeling of lower prices Such as Dawa's 50th anniversary commemorative section of the wave, the price in the vicinity of thirty thousand, the actual look and ordinary models, as more than a 50 anniversary of the label, the actual purchase of ordinary models (big red) 36-45-54 a total cost Less than fifteen thousand dollars The price of the fishing rod to recommend you several: Dawa wave pattern, corrugated dragon, Arashiyama, shortage of Master, West Mano's spring breeze, arc hidden, day wind, cool wind (personal feeling cool, although the price is higher, The actual use of less than the wind)
Q:How far should the tower crane be from the outer wall?
" If you want to 2011 or the model, you can choose to update the specifications of the recent update
Q:Construction of the project more than the number of layers must be used construction elevator
The outer scaffolding is a scaffolding that is erected outside the façade
Q:Construction safety management system should be clearly defined what the content
According to the material can be divided into organic insulation materials, inorganic insulation materials and metal insulation materials three categories
Q:How to enter the tower on the operating room
Single layer of color steel plate: length * width * thickness * 7.85 * ton price + profit double color steel plate: length * width * thickness * 7.85 * ton price * 2 + sandwich material price + profit specific look material, you can Specifically to consult
Q:What are the basic processes of civil engineering need to prepare the construction program
The general needs of the minimum . namely: construction crane equipment (tower crane), construction crane machinery (material hoist), construction crane machinery (construction lifts), building shelves (ordinary scaffolding), construction Construction workers, construction electrical welding (cutting) workers, high operating basket installation demolition workers and other special operations personnel with or without provincial management issued by the "construction of special operations personnel operating qualification certificate", " And the card is consistent.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range