Ringlock Modular Tower Scaffolding

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

uick Details

Place of Origin:
Guangdong China (Mainland)


Model Number:
En12810 Construction Platform Steel Scaffolding System
Item:
Tower scaffolding
Business Type:
Manufacturer in Guangzhou China
Feature:
All automatic welding
Material:
Q235/Q345
Color:
Customised for dip paint and poder coated
Size:
The tube:48.3mm,diameter:2.75-3.50mm
Surface Finishing:
Dip paint,Powder coated,Galvanised,HDG
Certificate:
EN12810,SGS test for loading capacity
Promotion:
We have a special discount in the beginning of 2012
Function:
Construction project,working platform,shipyard,performance stage

Packaging & Delivery

Packaging Detail:In bulk and in bundle,In 20ft,the loading total weight would be about 26t.It depends on the standard of your custom.
Delivery Detail:20 to 30 days after order confirmation

Specifications

Tower scaffolding
1)Material: Q235/Q345
2)Certificate: SGS, EN12810
3)Automatic machine weild
4)customised color and finish


Name

Tower scaffolding
Place of OriginGuangdong China(Mainland)
Brand nameShuangma
SizeØ48.3*3.25*1000/2000/3000 or as your request
Main MaterialQ235/Q345
Surface TreatmentHigh Protected Painted, Powder Coating, Electric Galvanized, Hot Dip Galvanized.
ColorSilver, Orange,red,as your need
CertificateSGS, EN12810.
FeaturesAutomatic Welding
ServiceOEM Service available
MOQ500pcs
PaymentT/T,L/C,O/A
Delivery TimeAbout 20-30 days after confirmation
PackingIn bulk or steel pallet or as your request
Production capability100 tons per day


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the special types of jobs that need to be certified?
As the external scaffolding (including the bridge scaffolding and the basket) to withstand the limited load capacity is limited, so generally do not use the tower directly to the outer scaffolding supply; when the use of its supply, the need to take specific conditions, respectively, the following measures: (2 to 3 layers, with tower crane installation); 2) the use of small groups of small containers, the overall lifting of the lifting of the body , Respectively, to the operating site; 3) in the scaffold set on the small hopper (need to add appropriate support), the mortar were unloaded in a small hopper When using other vertical transport facilities, trolleys (tricycles, two-wheelers and all kinds of special trolleys) are generally used for horizontal transport Its carrying capacity depends on the number of cars can be loaded at the same time as a unit of time to enhance the number of times Installation conditions The location of the vertical installation shall be fitted with suitable installation conditions, such as a reliable foundation, structural ties and horizontal transport conditions equipment performance must be considered to meet the construction needs and give full play to the effectiveness of equipment When the vertical phase of the construction phase of the phase difference between the poor, should be set up and adjust the vertical transport equipment in phases, the timely removal of equipment has been unnecessary the full use of equipment to make full use of existing equipment, if necessary, the acquisition or processing of new equipment The prospects for future use should be taken into account when acquiring or processing new equipment The use of equipment should be considered in the use of Bi after the change can be used
Q:I am in urgent need of emergency contingency plans
What are the sub-items of the general project that should be prepared for the special safety program? What should be included in the special programming? The best risk of the preparation of the following: the following dangerous part of the sub-projects and temporary electricity equipment in 5 and above or the total capacity of equipment in the 50kW and above the construction site of temporary electricity construction, the construction unit should prepare a special program The Excavation works of earth and rock
Q:What kind of special jobs are available at the construction site?
Xps full name extruded polystyrene foam board with polystyrene foam board (EPS) compared to the extruded board insulation effect is better. Compared with polyurethane, phenolic resin, extruded board insulation effect to be almost
Q:Seeking architectural internship diary, at least sixty, can be a different project, a project five or six of the do not made
Seeking "industrial furnace masonry construction and acceptance of norms" GB-2004 electronic version, urgent use! If appropriate to add bonus points more
Q:High price seeking truth! ... capacitive BCD-232M refrigerator price ... who answered, I asked him to breathe oxygen ...!
rice husk: rice husk loose loose material, wide origin, easy to local materials, cheap, and has a good thermal insulation properties
Q:How many special types of personnel are required for the construction industry?
Upstairs to understand the wrong, he said the dense area refers to the water pipe that pipe out of the mouth of the piece, where are generally very intensive, plus the purpose of the casing is to prevent the local temperature is too high
Q:Hello, can you send me an electronic version of the current building code? Thank you, email lyslzsuiyandong@163.com
A project floor-style double row scaffolding more than 30 meters, does not meet the specifications,
Q:How is the tower crane on the site raised?
1. Difference is not the mainstream of the heat dissipation heat sink + cooling fan, just based on the vacuum heat plate cooling technology VaporChamber. 2. From the heat side is still based on the vacuum plate is better. But based on vacuum hot plate cooling technology VaporChamber if the design is not good, but play a counter-effect. 3. If the price gap is not large, buy 5770 based on VaporChamber. The performance of the heat should be better.
Q:Summary of the construction safety check score after the summary score how to count
Wall panels and steel structure quota may also have to wait a few years after the quota can be developed, so you still ask the wall manufacturers, I give you recommend: double wall, directly on the Google search can be found.
Q:Brief description of what is the danger source of the squad leader
(EPS) or extruded board (XPS), which is made of polymer mortar, fiberglass mesh, flame retardant molded polystyrene foam board (EPS) or extruded board (XPS), etc

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range