Ringlock Scaffolding Vertical Support System

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m²
Supply Capability:
1000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1. Structure of Ringlock Scaffolding Vertical Support System

Ring-lock Scaffolding consists of cup-lock connector, post, cross bar, diagonal brace, base and top brace. Safe and convenient to operation, fast to assemble and dismantle, widely used in scaffolding construction, such as formwork scaffold and fitment construction.

 

It can be widely used for industrial and civil construction and maintenance, such as workshop, large gymnasium, conference& exhibition center conversation, billboard, market, dock, tunnel, subways, etc. used for mobile working platform installation of electrical & mechanical engineering, ship repair and other decoration engineering, for building temporary stand ,with simple roof frame, frame-connected Scaffolding can from temporary dormitory, depot and work shed.

 

2. Main Features of Ringlock Scaffolding Vertical Support System

.Each Ring-lock is welded on post every 0.6m. Choose step pitch based on mechanical requirements

.When installing the scaffolding, insert ledger connector into the pole of the cup-lock, then hammer ledger connector to finish fastening

.The more load, the more reliable fasten

.Ring-lock Scaffolding has no special retaining member and no active parts. It’s easy and convenient to operation with integral low costs

 

3. Ringlock Scaffolding Vertical Support System Images

Ringlock Scaffolding Vertical Support System

 

Ringlock Scaffolding Vertical Support System

 

4. Ringlock Scaffolding Vertical Support System Specification

    .Buckling resistance: 2KN.M when concentrate load on cantilever and 6-9KN.m when evenly distributed load.Design load of cross bar. Design Lord of base:Pmax=60KN

 

5.   FAQ of Ringlock Scaffolding Vertical Support System

     1) What can we do for you? 

      \We can ensure the quality of the Ringlock Scaffolding Vertical Support System and avoid extra expenses for customers.    

    .We can provide you the professional design team.    

    .We can provide fashionable and newest styles for you.    

    .We can design the artwork for you.    

    . Please feel free to customize.  

 

   2) What promises can be done by us?

   . If interested in Ringlock Scaffolding Vertical Support System, please feel free to write us for any QUOTE.

   . If printing required, please advise asap because the whole set need much more time to complete.

   . Please DO check goods when courier knocks your door and contact us asap if any issue.

 

  3) What about of our after-sale service?

   . Response will be carried out in 24hours  after receiving any complain or request.

   . Frame-Connected Scaffolding cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

  4) What about the package and shipping time?

   .Packing:  As Customer's Requirements

   .Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.  

  .Shipping time:

    Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. 

    Other mass qty of Ringlock Scaffolding Vertical Support System we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.  

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the special types of jobs that need to be certified?
1. Civilized construction program 2. Safe construction program 3. Template construction program 4. Scaffolding construction program 5. Sambo four construction program 6. Temporary electricity construction program 7. High operating construction program 8. Tower crane construction plan 9. Multi-tower operation anti-collision construction program 10. Emergency emergency plans 11. Winter rainy season construction program 12. Significant hazard assessment measures 13. Construction organization design 14. Building energy conservation program 15. Basket construction program 16. Tower crane hoisting program
Q:Construction site steel pipe fastener loss generally how much?
Pay attention to check, remember to take a ,,,
Q:What are the main points in the inspection of building safety data?
Structural adhesive, or weathering glue, similar to the kind of silicone, but the packaging is different, silicone is plastic loaded, weathering glue and structural glue is ham sausage packaging, the price of 15-45 or so, you have seen the building glass curtain wall Glass bar, that is, with glue and adhesive structure, good can be anti-aging for decades
Q:Discussion on the Selection of Tower Crane in High - rise Building
Now the construction of the scaffolding of the steel pipe specifications are two: diameter of 48mm wall thickness 3 bones of the fence section of the lettles of the wind. 5mm; diameter 51mm wall thickness 3.0mm
Q:Construction safety inspection standards (JGJ59-2011) a total of several inspection items, respectively, what
Foundation and underground space engineering technology 11.1 Post-grouting post grouting technology ........... 11.2 long auger drilling pressure pile technology 21.3 Cement fly ash Gravel Pile (CFG Pile) Composite Foundation Technology 21.4 Vacuum Preloading Reinforcement of Soft Soil Foundation Technology 31.5 geosynthetics application technology ............
Q:Will the door scaffolding norms who knows ah? Can you teach me?
559 Lightning protection In order to avoid the lightning protection, the main structure of the tower crane, the motor base and the metal shell of all electrical equipment, the metal protection tube of the wire should be reliably grounded and its grounding The resistance should not be greater than 4Ω
Q:How many special types of personnel are required for the construction industry?
You said all wrong, all wrong, all wrong! . the central fresh air system (not the new air unit) can only let the room in the closed doors and windows (or closed room) in the case of ventilation effect, can not be made Hot refrigeration; air conditioning have the effect of heating and cooling, can be carried out humidity control. . you said the heat recovery is a hot exchange of fresh air system, more energy-efficient products, divided into hot and humid exchange of new fans and hot new air units two. But the heat recovery efficiency is generally 65% to 80%, it does not have the effect of heating and cooling, in other words: when the air conditioning to adjust the indoor environment to a certain temperature, stop using, the use of hot exchange fresh air and ordinary fresh wind Than the former indoor temperature change is relatively slow!
Q:Construction safety management system should be clearly defined what the content
We first come to understand what is the scaffolding is what
Q:Summary of the construction safety check score after the summary score how to count
Wall panels and steel structure quota may also have to wait a few years after the quota can be developed, so you still ask the wall manufacturers, I give you recommend: double wall, directly on the Google search can be found.
Q:Code for construction and acceptance of industrial furnace masonry
First, the steel scaffold fastener has three 1) right angle fastener (cross buckle) for the connection of two vertical cross steel pipe; such as pole and large bar, large crossbar and small bar connection; 2) (Rotary buckle) for two angles into any angle cross steel pipe connection; 3) butt fasteners (buckle or a word buckle) for the two steel pipe with. Second, the specifications of fasteners 1) Right angle fasteners (cross buckle) 2) Rotary fasteners (rotary buckle) 3) Butt fasteners (buckle or a word buckle)

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range