RL-scaffolding

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Description:

1. Brief introduction

A convenient scaffolding system, especially for load-bearing support, its structure is simple and reasonable, its operation is easy and flexible, and the system is widely used in industrial buildings and civil buildings.


Convenient Ring - Lock Scaffolding System For Industrial, Civil Buildings


2. Competitive advantage
①. Product standardization, produce cost is lowered.

Convenient Ring - Lock Scaffolding System For Industrial, Civil Buildings

As the picture left shown, the standard is auto-welded; all the distance between cross plates of standards with different length is 500mm, which makes the auto-welded working method be easily achieved.

②. Spatial tower assembly guarantees high load-bearing capacity.

The main body of RL-scaffolding system is consisted of standard, ledger, diagonal ledger, and diagonal brace. The system forms a whole spatial frame structure that guarantees its high load-bearing capacity.

③.Smart joint design guarantees safe application and easy operation.

As the picture below shown, the “connect head” stuck in the position of cross plate with correct hole, then fix the pins tightly with a hammer, after that, you finish the whole connection work. The joint is safe and firmly.

Convenient Ring - Lock Scaffolding System For Industrial, Civil Buildings

3. Applications

Convenient Ring - Lock Scaffolding System For Industrial, Civil Buildings

Convenient Ring - Lock Scaffolding System For Industrial, Civil Buildings


Convenient Ring - Lock Scaffolding System For Industrial, Civil Buildings

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the special construction plans for the rainwater tank culvert project?
General factory roof do mineral wool, sandwich tile seems to be through the fire, the wall is generally used a single layer of tile
Q:How to review the special construction of steel structure
He found that the current flows from the positive pole of the filament to the metal sheet, rather than from the negative electrode
Q:The basic form of the outer scaffolding is filled in
Hello's ① China Knowledge Network Ye Hao, Wanfang data Ye Hao have examples
Q:What kind of scaffolding is the building divided into? Where to use it
better strength and stiffness, excellent hydraulic characteristics, the inner wall is smooth, the resistance is small, the damage to the cough and the cough and the seepage point of the same diameter and the design of the hole and the design of the pipe, corrosion resistance, anti-wear, anti-aging, anti-aging, anti-corrosion, anti-corrosion, anti-corrosion, anti-corrosion, anti-corrosion, anti-corrosion, anti-corrosion, anti- Cracking, long life, up to 50 years or more; light weight, no special hoisting facilities, handling and installation is very convenient; comprehensive economic better Hope you can be satisfied More hope to learn the knowledge of the plastic industry
Q:Construction of the project more than the number of layers must be used construction elevator
Bulk density of polystyrene foam board should be ≥ 18kg / m; Polyurethane double-sided steel plate metal surface sandwich panel
Q:How many special types of personnel are required for the construction industry?
You said all wrong, all wrong, all wrong! . the central fresh air system (not the new air unit) can only let the room in the closed doors and windows (or closed room) in the case of ventilation effect, can not be made Hot refrigeration; air conditioning have the effect of heating and cooling, can be carried out humidity control. . you said the heat recovery is a hot exchange of fresh air system, more energy-efficient products, divided into hot and humid exchange of new fans and hot new air units two. But the heat recovery efficiency is generally 65% to 80%, it does not have the effect of heating and cooling, in other words: when the air conditioning to adjust the indoor environment to a certain temperature, stop using, the use of hot exchange fresh air and ordinary fresh wind Than the former indoor temperature change is relatively slow!
Q:What are the safety protection appliances, machinery and equipment, construction machinery and accessories for construction enterprises?
For the insulation board before the process: brick wall base plaster, concrete and the base wall cleaning, concrete wall brushing interface agent, yin and yang angle hanging line and horizontal line (housing to be closed) external wall insulation construction materials to prepare polymer glue Pulp powder; alkali-resistant fiberglass mesh; anchor; expansion joints plastic, phenolic insulation board and other insulation materials, phenolic board special interface agent. 1. Construction-related personnel must be carefully read before the construction of construction drawings, and with the construction site for comparison, timely inspection of the scene and drawings change. 2. The implementation of construction materials and construction tools storage, construction staff accommodation arrangements and other related matters. 3. Check the basket or scaffolding, shall not have any security risks. 4. Check the construction of water, electricity situation.
Q:How to enter the tower on the operating room
Tower crane is the most significant tower crane center to the hook to reach the farthest distance, the specific is the car in the tower arm can run long distance. The working range of the tower crane is the radius of the tower crane, and the maximum distance from the crane to the center of rotation should meet the needs of the construction plane. The lifting height of the tower shall not be less than the total height of the building plus the height of the components, sling and safe operation (usually 2 to 3 m), and shall meet the scaffolding, derrick or other barrier material beyond the top of the building Generally not less than 1m) of the maximum beyond the height required. Tower crane in the minimum amplitude from the maximum weight, with the increase in the amplitude of the corresponding reduction in weight. Therefore, in a variety of amplitude are rated from the weight. Different amplitude and the corresponding weight together, can be drawn into a crane performance curve. Rated weight * distance from the center of the trolley = rated lifting moment. The balance of the general tower crane arm is greater than the maximum torque, the crane itself is a boom and balance arm unbalanced steel structure, this imbalance is based on the balance. Since the torque generated by the balance arm is large, that is, in the case of no hanging matter, plus the maximum wind load torque is the tower crane overturning moment. Rectangular basic check, the basic moment is the diagonal direction of the largest, in order to reinforcement. The maximum lifting torque is obtained without considering the wind load, theoretically, to achieve a very dangerous. The lifting weight of the tower crane should include the lifting material, spreader and rigging, etc. acting on the lifting crane hook crane all the weight. The lifting torque of the crane is generally controlled at 75% of its rated lifting torque to ensure safe operation and to extend its service life.
Q:Safety Management of Winter Construction Rules for Construction Engineering
Clamp type flexible telescopic connection: Clamp type flexible telescopic group: Outer card, seal ring, inner card connector, fastening bolt Clamp type flexible telescopic connection Features:
Q:Brief description of what is the danger source of the squad leader
(EPS) or extruded board (XPS), which is made of polymer mortar, fiberglass mesh, flame retardant molded polystyrene foam board (EPS) or extruded board (XPS), etc

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range