Product Description:

Waterproof Recycling Low Labour Cost Climbing Formwork System CB210


Waterproof Recycling Low Labour Cost Climbing Formwork System CB210


CB210 has main platform with width 2100mm, compare with CB240, it will be cost effective in some condition.

CB210 climbing system is mainly used for concrete pouring in the wall and the core wall. They guarantee simple handling, fast concreting cycles and problem-free adjustment to different wall configurations.


Competitive Advantage:

1. High bearing capacity

The high loading capacity of the brackets allow very large scaffold units. This saves the number anchor points required as well as reducing climbing times.

2.Simple moving procedure by crane
Through the strong connection of formwork together with the climbing scaffold, both can be moved as a single climbing unit by crane. Thus valuable time-savings can be achieved.

3. Fast striking process without a crane
With the retrusive set, large formwork elements can also be retracted quickly and a minimum of effort.

4. Safe with work platform
The platforms have assembled firmly with bracket and will be climbing together, without scaffolding but can work safely in spite of your high location.

5. The inclination of formwork is adjustable by means of adjustable brace.

The brace is connected with formwork and bracket and the main function is guaranteeing the verticality of formwork by adjusting its length.

Applications:


Waterproof Recycling Low Labour Cost Climbing Formwork System CB210

Waterproof Recycling Low Labour Cost Climbing Formwork System CB210


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is a new construction technology, new technical information
I think you can not send a copy of the top of the usurpation of a single person who would like to give you a water, to Google search, you can say that you can not think of, there is no there. If you do not understand Hi me.
Q:1 cubic tap water there is no way to reduce the water temperature to 15-18 degrees
Desulfurization and denitrification equipment will be used in metal hose metal hose is an important engineering engineering connection components, by the corrugated flexible tube, mesh sets and joints combined
Q:Construction safety management system should be clearly defined what the content
I only know that the glass beads can be made tiles
Q:What is the maximum lifting capacity of the tower crane
The position of the two adjacent rods should be staggered, should not be set in the synchronization, the synchronization of a vertical separation of the two joints in the height of the side of the length of the function of the population can not be less than 0
Q:Construction site steel pipe fastener loss generally how much?
Pay attention to check, remember to take a ,,,
Q:What kind of special jobs are available at the construction site?
Xps full name extruded polystyrene foam board with polystyrene foam board (EPS) compared to the extruded board insulation effect is better. Compared with polyurethane, phenolic resin, extruded board insulation effect to be almost
Q:What are the five accidents in the construction industry?
The top is definitely to hang, with the top of the space to stay between one meter is the best, in the ceiling of the time, such as with a buckle plate, in the buckle inside plus a layer of rock wool, 3-5 cm thick, Remember to install the time as far as possible not to flatten the cotton, will affect the effect. Brick wall outside or inside, do insulation layer, if the money, but also with rock wool or foam board and the like, if the foam board, the thickness of not less than 6 cm, 10 cm best. Glass surface, this does not spend money is to die, do not spend on the outside hanging sun curtain, cloth and the like, if you want to see, to brush transparent insulation coating, but the price is high.
Q:How to enter the tower on the operating room
Single layer of color steel plate: length * width * thickness * 7.85 * ton price + profit double color steel plate: length * width * thickness * 7.85 * ton price * 2 + sandwich material price + profit specific look material, you can Specifically to consult
Q:The basic form of the outer scaffolding is filled in
Polyurethane roof with a small nail connection, board lap tight
Q:What are the basic processes of civil engineering need to prepare the construction program
The general needs of the minimum . namely: construction crane equipment (tower crane), construction crane machinery (material hoist), construction crane machinery (construction lifts), building shelves (ordinary scaffolding), construction Construction workers, construction electrical welding (cutting) workers, high operating basket installation demolition workers and other special operations personnel with or without provincial management issued by the "construction of special operations personnel operating qualification certificate", " And the card is consistent.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range