Mobile scaffolding Tower system
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Quick Details
Place of Origin: | Model Number: | ||||
excellent quality: |
Packaging & Delivery
Packaging Detail: | in carton |
Delivery Detail: | 22 days |
Specifications
scaffolding mobile tower with different height
Description | Finishment | Quantity | Weight(kg) |
3'x6'8" Snap-on Lock Ladder Frame(Single Box) | Powder Coat | 4 | 17.48 |
Guard Rail Post 3 Rivets Snap-on | Electric Galv. | 4 | 3.35 |
7'x4' Cross Brace Snap-on | Electric Galv. | 4 | 5.9 |
7' Guard Rail Snap-on | Electric Galv. | 4 | 3.61 |
3' Guard Rail Snap-on | Electric Galv. | 4 | 1.8 |
7'x19" Alumunium Plywood Deck | Nature Colour | 1 | 13.24 |
Outrigger | Powder Coat | 4 | 9.3 |
8" Eagle Caster with Brakes | Electric Galv. | 8 | 5.35 |
Couping Pin 1/8" Collar | Electric Galv. | 8 | 0.3 |
Spring Retainer | Electric Galv. | 8 | 0.03 |
Snap Pin | Electric Galv. | 16 | 0.06 |
- Q:How far should the tower crane be from the outer wall?
- 1: it is best not to use this, this program in the construction, curing, use, life will bring a lot of problems. 2: hanging net and plaster is formalism, is not considered the consequences. 3: If you want to use tiles to decorate the wall, especially the sandwich panels, the size of the use of small. I have seen a tile wholesale owner home decoration, the 800X800 cut into 800X200 with, it seems good results.
- Q:Safety Management of Winter Construction Rules for Construction Engineering
- Generally take 30 to 35 on it, low hardness is not enough, the cost is too high
- Q:Rt, 3ks, as far as possible Please ask questions: is the construction site, there are other sites? More
- As the external scaffolding (including the bridge scaffolding and the basket) to withstand the limited load capacity is limited, so generally do not use the tower directly to the outer scaffolding supply; when the use of its supply, the need to take specific conditions, respectively, the following measures: (2 to 3 layers, with tower crane installation); 2) the use of small groups of small containers, the overall lifting of the lifting of the body , Respectively, to the operating site; 3) in the scaffold set on the small hopper (need to add appropriate support), the mortar were unloaded in a small hopper When using other vertical transport facilities, trolleys (tricycles, two-wheelers and all kinds of special trolleys) are generally used for horizontal transport Its carrying capacity depends on the number of cars can be loaded at the same time as a unit of time to enhance the number of times Installation conditions The location of the vertical installation shall be fitted with suitable installation conditions, such as a reliable foundation, structural ties and horizontal transport conditions equipment performance must be considered to meet the construction needs and give full play to the effectiveness of equipment When the vertical phase of the construction phase of the phase difference between the poor, should be set up and adjust the vertical transport equipment in phases, the timely removal of equipment has been unnecessary the full use of equipment to make full use of existing equipment, if necessary, the acquisition or processing of new equipment The prospects for future use should be taken into account when acquiring or processing new equipment The use of equipment should be considered in the use of Bi after the change can be used
- Q:Construction safety inspection score summary of the supervision unit, construction unit inspection opinions how to fill?
- Safety crates, safety nets, protective gloves, protective masks, protective goggles; tower cranes, construction lifts, construction hoists, ,
- Q:How to review the special construction of steel structure
- With gasoline cleaning, waterproof paint dissolved in gasoline and other organic solvents
- Q:The basic form of the outer scaffolding is filled in
- Polyurethane roof with a small nail connection, board lap tight
- Q:Seeking architectural internship diary, at least sixty, can be a different project, a project five or six of the do not made
- Seeking "industrial furnace masonry construction and acceptance of norms" GB-2004 electronic version, urgent use! If appropriate to add bonus points more
- Q:How to calculate the vertical shipping cost of decoration
- Mainly used in anti-corrosion, pressure vessel manufacturing, electric construction, petrochemical, pharmaceutical, light industry, automobile and other industries Composite material according to the appearance can be divided into composite panels, composite pipe, composite bar and so on
- Q:What kind of jobs are the construction workers in the labor service network of the China Construction Service Network?
- Construction engineering consumption in the fixed amount of corrosion, insulation, insulation works that chapter has polystyrene plastic plate insulation layer of this fixed child!
- Q:Discussion on the Selection of Tower Crane in High - rise Building
- project overview (project location, building height, ) the scaffolding erection form (floor type, steel cantilever) and erection parameters (erection height, vertical pole distance, distance, step, even the wall spacing, steel spacing, steel length, etc) construction and deployment (quality Safety management system; materials, equipment and labor organization; construction schedule, etc) scaffolding construction requirements and technical measures scaffolding construction and quality and safety management contingency plans scaffolding calculation book related accessories and charts Flat layout map, scissors supporting the elevation map, even the wall pieces of Fu Fung Phoenix Yu Hao Feng pupil tripod map, pole base node map, etc)
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Mobile scaffolding Tower system
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
New products
Hot products
Related keywords