• Tower Crane TC7050 Construction Equipment Building Machinery For Distributor Sales System 1
  • Tower Crane TC7050 Construction Equipment Building Machinery For Distributor Sales System 2
  • Tower Crane TC7050 Construction Equipment Building Machinery For Distributor Sales System 3
  • Tower Crane TC7050 Construction Equipment Building Machinery For Distributor Sales System 4
  • Tower Crane TC7050 Construction Equipment Building Machinery For Distributor Sales System 5
  • Tower Crane TC7050 Construction Equipment Building Machinery For Distributor Sales System 6
Tower Crane TC7050 Construction Equipment Building Machinery For Distributor Sales

Tower Crane TC7050 Construction Equipment Building Machinery For Distributor Sales

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Tower Crane TC7050 Description:

1.CMAX Tower Crane TC7050  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC7050 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC7050 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC7050  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC7050  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC7050 Parameter:

 Max. working range 70m, tip lifting weight 5T and Max. lifting weight 20T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 50

Max height with attachment (m) 200

Working range can be adjusted (m) 50、55、60、65、70

Min working range (m) 2.5

Max lifting capacity (t) 20

Tip load @ 50m (t) 5


Tower Crane TC7050 Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC7050 Diagram:

Tower Crane TC7050 Construction Equipment Building Machinery For Distributor Sales

Tower Crane TC7050 Construction Equipment Building Machinery For Distributor Sales

Tower Crane TC7050 Technical Sheet:

Tower Crane TC7050 Construction Equipment Building Machinery For Distributor Sales

Tower Crane TC7050 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC7050 for example, the first two letters “TC” means Tower Crane, “70”means jib length is 70 meter, and the last two letter “50” means the tip load is :5 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Q:I have a problem in discovering the breakdown in the tower crane control panel. If you can give me a procedure to follow the problem in the control panel.
Generally tower cranes have their electrical panels at the ground floor. Troubleshooting in the tower crane is not different to any other electrical system. First check the power circuit healthiness--switches,fuses,contactors and then go for control circuit. The cranes have few additional interlocks for excessive forward movement, extra long travel etc. Just go through the drawing and u will get the problem solved
Q:What association does Wing Chun have with Fujian White Crane (Tiger-crane) kung fu?
Wing Chun Fist is derived from White Crane Fist and Snake Fist. The original name of the White Crane Fist is Eng Chun Bai He Quan. The Eng Chun part is the Fukienese dialect for Wing Chun, which is the name of the Village it derived in. It is also pronounced Yong Chun White Crane Fist and from it is where Wing Chun derives its Fajing technique known as 1 inch punch. The 5 Ancestor style is Ngo Cho Kuen or Wu Zu Quan, again - dialectal differences. It is also a Fukienese Art. Wing Chun, a Southern Shaolin Style is NOT related in ANY way to Hsing I Chuan, which is of Wu Tang/Taoist origin. Goju Ryu has some White Crane Influence but is derived from the Hakka Arts like Southern Mantis, Bak Mei and the like. Tiger Crane and White Crane are not related. The crane in the Hung Family Boxing is more the Tibetan White Crane and not the Fujian Crane. There is a mix up in the history which makes it a bit complicated. Gee Sim was from the Northern Shaolin School and went south to the Fukien temple to escape the Ching. He taught there, met Hung Hei Koon and taught him Tiger Fist. Gee Sim and Hung also left Fukien because of the Ching and went to Guandong and there is where Hung Fist developed into what it is today. The White Crane Fist of Fujian/Fukien came from the 18 Lohan Style Fang Chi Niang learned from her Father, who was a student at the Fukien temple, and mimicry of Crane movements. These styles, Crane and Hung were being developed around the same time but hundreds of miles apart. It is known that Wong Fei Hung trained in Lama Pai aka Tibetan Crane and also he is credited with creating the Tiger Crane Form aka Fu Hok. I hope this helps.
Q:i want to buy china tower crane,how to cantact the manufacture?
Jinan Jinkui Construction Machinery Co., Ltd, one of the famous manufacturers for tower crane in China, has been rated the best suppliers in tower crane industry in China for three consecutive years. Also the exportation of tower crane has been taking a leading position in domestic China. The perfect after sales service is one of the reasons for you to choose Jinkui tower crane of China
Q:please tell me thats not what i think it is O_O
Omg! What primer is it? That sounds really fishy...
Q:How to improve the stability of tower crane
The fatigue test data show that the fatigue life of the phosphating coating of steel wire rope is about 3 times of the same structure light steel wire rope (laboratory comparable conditions), not easy to wear and corrosion is not easy to cause the service life of wire rope large amplitude extension. Manganese phosphating is wear resistant phosphating, which can solve the wear problem in the use of wire rope and improve the corrosion resistance. It is for reference only
Q:It is a single blade knife very similar to a case sodbuster
Sounds of the Asian descent,
Q:I want this as a tattoo but I want to know what it means. Why type of tree is it? What do the symbols translate into?
The kanji / symbol (character of Chinese origin, also used in Japan) is the kanji for 'crane' (the bird, not the construction site vehicle!!)
Q:How do you test the tower crane? Myopia can span tower crane? Brother here, please all heroes.
A tower crane installation scheme, 1, compilation basis, project overview, working environment, 2 workers and 3 endurance calculation and installation equipment for 4, installation procedures, methods and requirements for 5, commissioning record 6, two safety technical measures, safety technical disclosure, three installation foundation concrete test report of four, the tower crane installation and acceptance of table five, safety supervision station issued a permit for six, seven, demolition demolition project safety technical clarificaiton tower crane installation scheme project name: preparation: position (title): Approval: job (title): the construction unit: tower crane installation demolition project, the preparatory work before construction: 1. The tower crane installation position, according to the effective range of the construction requirements, site conditions and the role of tower crane, convenient installation and disassembly, the tower crane configuration in 17 axis to 18 Between the axis, away from the outer wall of 5 meters, with 11 standard section. 2, the basis of the principle, the use of concrete foundation, strictly according to random basis drawing. 3, the examination of concrete pressure report, tower foundation has been completed by design and construction, the safety group acceptance, the basic test block delivery, after the test pressure qualified, must be installed. 4. The installation site is level and the channel is repaired. 5, transport parts admission
Q:Operation points of tower crane (tower crane)?
Slewing bearing: tower crane is one of the most critical components, mainly to bear overturning moment and vertical load. After the failure, the demolition and replacement is extremely difficult, loss of large, so you have to check carefully to do maintenance, each 200H must be a senior grease lubrication from the rotary bearing surface, until now exudation. Slewing bearing adopts high strength bolt connection, if the pretension is not enough, or long-term operation, do not check, not fastening, will cause loose. If the individual bolts loose, will cause the remaining bolts overload, the consequences will be disastrous. The luffing mechanism only moves horizontally, the load is light and the line speed is not high, so it should be easy to master and operate. However, the amplitude involves the change of the lifting torque, and if there is no stopping in time, there will be the possibility of over torque. Therefore, the main requirement of variable amplitude operation is stationary parking and accurate positioning. The tower crane is of great height and the hanger is hung longer, so it is easy to swing the hanger when it is running. This is an objective phenomenon. What is called stabilization hook operation is how to make the swinging hook stop quickly, or how to make the hook move with the movement of the crane as soon as possible, and minimize the operation of the swing. The operation of stabilization hook is the skill that the driver should master.
Q:I am currently on a vacation and our house is on a bay. It is 1 am here and I couldn't sleep because I had a personal issue on my mind. I walked out and I sat on the planks, letting my feet dangle in the water and prayed, towards the end, I was yelling at God to for once answer me. After I finished, I looked up and in the moonlight I could see a crane or heron in the water 20 feet from me, looking at me. I didn't notice it before. Does it have any spiritual meaning? I'm Christian if that helps.And remarks that are not the answer I'm looking for, please just don't bother.
You will be married soon. And before you know it, you will have a family.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords