Stair Tower for build

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Stair Tower


The structure of ring-lock stair tower is the same as Φ60 ring lock scaffolding.


The dimension of cross section is 1500×3000mm.It is widely used in construction.


Bearing Capacity of Stair Tower:


The stair tower can be erected with the maximum height of 150m,


when attached to the wall every 4.5m.





Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the special construction plans for the rainwater tank culvert project?
Machine tools: responsible for the engine, gearbox, brake system, steering system, cooling system (not air conditioning), chassis and so on
Q:How to calculate the vertical shipping cost of decoration
Hello, according to the size of your plant to calculate the larger the plant, will be more concessions, generally about 60-. not package workers material Oh
Q:What is a new construction technology, new technical information
Flexible interface allows a certain deformation ~ ~ and rigid interface is connected into the whole ~ ~
Q:Summary of the construction safety check score after the summary score how to count
In each new site to use the scaffolding, before erection, each batch, whether new or old, or rent, buy their own, have to bring the inspection and testing of qualified testing organizations testing.
Q:Code for construction and acceptance of industrial furnace masonry
In order to carry out the safety of the production of civilized construction work, the safety of production accidents will be completely eliminated in the bud, especially the development of major dangerous sources of safety prevention and control measures
Q:How far should the tower crane be from the outer wall?
" If you want to 2011 or the model, you can choose to update the specifications of the recent update
Q:Will the door scaffolding norms who knows ah? Can you teach me?
Oxygen index greater than or equal to 30 for the B1; oxygen index greater than or equal to 26 for B2.
Q:What are the special types of jobs that need to be certified?
As the external scaffolding (including the bridge scaffolding and the basket) to withstand the limited load capacity is limited, so generally do not use the tower directly to the outer scaffolding supply; when the use of its supply, the need to take specific conditions, respectively, the following measures: (2 to 3 layers, with tower crane installation); 2) the use of small groups of small containers, the overall lifting of the lifting of the body , Respectively, to the operating site; 3) in the scaffold set on the small hopper (need to add appropriate support), the mortar were unloaded in a small hopper When using other vertical transport facilities, trolleys (tricycles, two-wheelers and all kinds of special trolleys) are generally used for horizontal transport Its carrying capacity depends on the number of cars can be loaded at the same time as a unit of time to enhance the number of times Installation conditions The location of the vertical installation shall be fitted with suitable installation conditions, such as a reliable foundation, structural ties and horizontal transport conditions equipment performance must be considered to meet the construction needs and give full play to the effectiveness of equipment When the vertical phase of the construction phase of the phase difference between the poor, should be set up and adjust the vertical transport equipment in phases, the timely removal of equipment has been unnecessary the full use of equipment to make full use of existing equipment, if necessary, the acquisition or processing of new equipment The prospects for future use should be taken into account when acquiring or processing new equipment The use of equipment should be considered in the use of Bi after the change can be used
Q:The latest "current building construction specifications Daquan" electronic version can give me a copy of it
Wire fever chanting. The general wire of the skin to more than 100 degrees will not have any obvious changes, but the bubble has long softened.
Q:Construction safety inspection score summary of the supervision unit, construction unit inspection opinions how to fill?
Safety crates, safety nets, protective gloves, protective masks, protective goggles; tower cranes, construction lifts, construction hoists, ,

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range