Splitter Termination Box UDM 2-16

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
300 Pieces pc
Supply Capability:
8000 Pieces per Month pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

The UDM 2-16 Splitter Terminal box is rugged, low cost, low profile interconnection between central office and multi-dwelling units of FTTx application.

The design of UDM splitter terminal combines the functionality of a local convergence cabinet with UDM terminal.

Its multi-layer design allows installers to access only the components necessary for initial installation or subscriber turn-up. It can house the splitter and allows for pigtail splicing of distribution/drop cables as needed

 

Features

· Indoor or outdoor rated

· Available 1x4, 1x8, 1x16 splitter as well as 2x4, 2x8, 2x16 splitter

· Suitable for wall-mounting or pole mountingapplication.

· Max. up 16 pcs of FTTH drop cable or pigtails

· Suitable for wall-mounting or pole mounting application.

· 2 inlet ports and 16 outlet ports

 

Application

· FTTH, FTTB, FTTC

· Telecommunication Network

· CATV

· Local Area Network

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How is the tee of the threading tube on the drawing?
This one. The The Really cumbersome and uneconomical. Remove the books after the screen, you also need to get a shell, also need a regulated power supply, video interface ....... The cost of these accessories is not much, but the notebook screen brightness is low, the viewing angle is also small, the transformation is not practical. Now 19-inch LCD TV looks like a few hundred pieces. Specific needs of these things: hope to help you to buy the name of the driver board price must specify VGA driver board 225 yuan 2 choose a VGA interface to connect the computer TV driver version 525 with TV, remote control VGA and AV screen signal line 25 yuan Select the driver version to the screen of the signal line VGA head 8 yuan must choose VGA cable 4 yuan must be connected to the driver version and vga connector power head 4 yuan must be connected to the driver version of the power interface power jumper 4 yuan must drive the voltage With the keypad 10 yuan must be set button switch set equal pressure 25 yuan optional can be used to modify the previous high-voltage strip VGA extension line 10 yuan optional 2 head can buy their own 12v power supply 50 yuan optional can use their own computer power conversion Or lead the computer 12v power supply
Q:Big gods, home improvement in the end with the number of square wire ah?
But the line can not improve the efficiency of electricity to take the dark line of trouble to wear trouble but beautiful how you choose
Q:Calculation of the number of integrated wiring equipment.
Four: . x ÷ 100 (up to the whole) a 110 patch panel . x ÷ 24 (up to the whole) voice module patch panel . y ÷ 24 (up round) data module patch panel . the number of cable patch panel put the above four of the sum, plus the switch and the location of the cable, you should know how many rows
Q:Mobile power can not charge the phone, power and data lines are no problem
Do not know whether your network cable has been used in the computer, the line is used in 1236 that is white orange, orange, white green, green, the remaining four, 4578 can be used to do with the telephone line, blue, white Blue, white brown, brown. Free two to the outside line, inside. Six-core module means 3 calls? , This is my 8 phone, are two two lined up. No research on the module, huh, huh. -------------------------------------------------- ---- do not understand you say this, I am the 48 is the internal group phone, you will not be the telephone line of the crystal connector, I am not a professional, Oh, if the sample then the middle two Yes, the general phone is only two in the middle, the module can be aligned on the pressure can be. More useless.
Q:What does the cable ZR-YJY-1 mean, the focus is -1 what does it mean
Wire and cable type test report of the effective time is not uniform provisions of different industries have different requirements in general, such as fire-retardant fire type test report is generally two years of coal safety signs mine cable is two years; some for three years, there are more A report corresponds to a specification of the quality of the business manual has been reflected, the other is also required by the certification body to add the answer: in principle is not possible!
Q:Please guess a riddle: a beautiful ride on the wire. (Hit a plant)
"GB / T9330.3-2008 plastic insulated control cable XLPE insulated control cable", "GB / T-2008 rated voltage 1kV (Um = 1.2kV) to 35kV (Um = 40.5kV) extruded insulated power cable and annex". "GB / T-2008 rated voltage 1kV and below overhead insulated cable" more cable knowledge, please search for "industrial automation integrated cable solutions" to enter the China Industrial Network Forum to view, exchange!
Q:How to distinguish between power cables, control cables, and wires
) The design of the wiring harness in the front compartment is especially important, and it is necessary to consider the layout of the engine (horizontal and vertical), the principle of the vehicle and the electrical failure repair in the later period If the wiring harness is designed to Line design, taking full account of the use of each line, diameter, length, etc, then the design of the product is very difficult to economic 2 Product continuity and general In general, the new Austrian electronics in the design of the end of the wire bundle, will try to use the same platform for the mature models as a reference, such as the use of the same electrical function parts, wiring harness accessories (including cable ties, Stent), dressing, etc, from the company's long-term development point of view, which not only reduce the new project new parts of the procurement cycle, and reduce the cost of mold, thereby reducing costs 3 Harness design 3D of today's era, is the era of digital information, what are the pursuit of 3D, of course, the wiring harness design is not out New Austrian electronics in the automotive wiring harness design process, from the source control, the introduction of the concept of electronic loading The so-called electronic loading, that is, in the digital model completely reflect the real state, car electrical function parts, fasteners, rubber parts, etc should be reflected in the number of models In this way, in the design phase to avoid the wiring harness and sheet metal interference problems, to solve the problem of reasonable branches to effectively control the length of the line, so to avoid a lot of late rework phenomenon, but also virtually save the cost
Q:Hello my computer last year to buy July is the apple mac book pro 15 inch power adapter is 85v t prefix
This is really hard to say, mainly to see how you install, if you do not care management frame so U can be installed 2 110 dragon skeleton (each number of points I forget seems to be 100 pairs). Then 42U can be installed in theory 84. From 110 you are used as a voice. Why do not you have all the 8 lines to play more. And the network switch is generally 1U of the 紶 Dan official stalk pull the rules of the sea river width. The phone is not good to say.
Q:Apple phone display cable or accessories not certified how to do
3 When using insulated and sheathed cables for non-flammable materials, do not wear metal tubing, but should be laid in the cable wells Fire alarm system design specifications (GBJ116-98) 1 fire automatic alarm system transmission lines should be used to wear metal pipe, the flame retardant treatment of rigid plastic pipe or closed trunking protection wiring 2 fire control, communication and alarm lines with dark laying, should use metal pipe or flame retardant treatment of rigid plastic pipe protection, and should be laid in the structure of non-combustion body layer, and the protective layer thickness should not be less than 30mm When the use of Ming laying, should be used metal pipe or metal trunking protection, and should be in the metal pipe or metal trunking to take fire protection measures When using a flame-retardant cable, it may be protected from metal pipes, but should be enclosed in closed trunks with fire protection measures in cable shafts or ceilings Commonly used metal pipe, do not require the case can be used PVC pipe
Q:3 by 16 cable is a few flat? How? That 5 by 16?
May be caused by the leakage of upstairs, may also be caused by moisture, check out the reasons to change.
Our market scope covers more than 20 provinces and cities in China and we have long and stable business relations with telecom operators. We have also solidified sound business relations with Bulgaria, New Zealand,U.S.A,Korea,Serbia, Ukraine, Indonesia, India, Pakistan, Saudi Arabia. We welcome customers from the entire world to cooperate with us.

1. Manufacturer Overview

Location Sichuan,China
Year Established 2000
Annual Output Value Above US$100 Million
Main Markets 30.00% Eastern Europe
22.00% North America
20.00% Southeast Asia
10.00% Mid East
10.00% South America
1.00% Oceania
1.00% Eastern Asia
1.00% Western Europe
1.00% Northern Europe
1.00% Southern Europe
1.00% South Asia
1.00% Domestic Market
1.00% Africa
Company Certifications ISO9001:2000;ISO9001:2008

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port SHANGHAI,SHENZHEN,CHENGDU
Export Percentage 41% - 50%
No.of Employees in Trade Department 11-20 People
Language Spoken: English, Chinese, Spanish, Arabic, French, Russian, Korean, Italian
b)Factory Information  
Factory Size: 5,000-10,000 square meters
No. of Production Lines 7
Contract Manufacturing OEM Service Offered
Product Price Range Average