• Shipyard Platform Scaffolding System with En12810 Standard CNBM System 1
  • Shipyard Platform Scaffolding System with En12810 Standard CNBM System 2
  • Shipyard Platform Scaffolding System with En12810 Standard CNBM System 3
Shipyard Platform Scaffolding System with En12810 Standard CNBM

Shipyard Platform Scaffolding System with En12810 Standard CNBM

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m.t.
Supply Capability:
30000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

  • Quick Details of Shipyard Platform Scaffolding System with En12810 Standard

  • Type:High Building

  • Material:Steel

  • Lapping Form:Full Scaffolding

  • Framework:Combined Scaffolding

  • Supporting Mode:Wall Hanging Scaffolding

  • Erection Position:External Scaffolding

  • Scaffolding Part Type:Scaffolding Platform

  • Move Method:Horizontal mobile Scaffolding

  • Structural Style:Tower Scaffolding

  • Surface Treatment:Hot DIP Galvanized, Galvanized, DIP Painted

  • Certificate:En12810, SGS Test Report for Loading Capacity

  • Color:Silver, Dark Red, Orange

  • Production Capability:100 Tons Per Week

  • Delivery Time:About 20-30 Days After Confirmation

  • Export Markets:Global

  • Shipyard Platform Scaffolding System with En12810 Standard CNBM

  • Shipyard Platform Scaffolding System with En12810 Standard CNBM


  • Shipyard Platform Scaffolding System with En12810 Standard CNBM



  • Descriptions of Shipyard Platform Scaffolding System with En12810 Standard

  • 1. Standard:
        3000mm, 2500mm, 2000mm, 1500mm, 1000mm, 500mm.
    2. Ledger:
        3000mm, 2000mm, 1780mm, 1500mm, 1000mm, 500mm.
    3. Diagonal brace:
        3000x2000mm, 1780x2000mm, 1000x1500mm, 1000x2000mm, 1500x2000mm.
    4. Tube specification:
        Φ 48.3x4.0mm, φ 48.0 x3.25mm, φ 48.0 x3.0mm.
    5. Surface Finish:
        Hot DIP Galv. Electric Galv.Powder coating, Dip Painting.
    6. Material:
        Q235, Q345
    7. Certificate: 
        EN12810,SGS test report for loading capacity.

The Parts of Shipyard Platform Scaffolding System with En12810 Standard

Ringlock System Main Parts
Item NO.Description MaterialFinish
1StandardQ345/Q235HDG
2LedgerQ345/Q235HDG
3BraceQ345/Q235HDG
4Base CollarQ235HDG
5Base JackQ235HDG/EP
6U-HeadQ235HDG/EP
7PlankQ235/Q195HDG
8StairQ235HDG
Stair GuardrailQ235HDG
9LadderQ235HDG
Ladder BracketQ235HDG


  • FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Q:What is the service life of the mobile scaffolding accessories?
Hot galvanized mobile scaffolding accessories for a period of 10 years or so, the surface does not require maintenance, in use without any restrictions. However, the cost is high, the raw materials needed to be more complex.
Q:What are the requirements for the construction of the scaffolding structure?
The scaffold structure is basically in the two-dimensional grid and a substantially two-dimensional outer grid connected grid, each of the included in the expected load conditions of scaffolding structure after long time has a bearing component of relatively stable strength. The anchor is connected with the support arm and has a first leg in the form of a bar or rod. The anchor may be aligned such that the first leg is substantially parallel to the longitudinal axis of the arm, and the distal end of the first leg extends beyond the arm. The structure of the scaffold also comprises one or more platforms, each platform is arranged between the two corresponding bearing bars of the inner and outer grid frames at the same height.
Q:Scaffolding scaffolding erection norms which requirements, who can say?
The construction load on the frame must be in accordance with the design requirementsAfter the first erection of the body, must be approved by the company's safety and technical departments, and the company's project safety officer after the visa can continueIn case of suspension frame, use more than one month, such as re started, the frame must pass the reinforcement, rod must be re tighten oil, can be usedBefore the building should be approved with the consent of the special construction plan, should be in accordance with the scheme requirements of embedded embedded parts of the main structure of the construction processFeet should be laid flat tile, and tied with wire fixed on the lower supporting steel pipe. Scaffold of the butt joint between the tile, the rest of the bearing rail spacing shall not be greater than 400~700 mm
Q:I really want to get one done and I would like it if someone could tell me how badly does it really hurt? During and after. I know everybody has different pain thresholds but on average? I'm just nervous to get it done but really want another piercing on my ears. I have my lobes and a cartilage on my right ear. How easy is it to clean? rate in numbers as well as a description. Thanks.
Well of course it depends on the person. Some people say the piercing isn't bad at all, while some say it is really painful. Some people say the healing process is absolute hell, but for some people it's a breeze. I got an industrial 3 months ago, and i would rate the actual piercing process as a 8/10 (10 being the most painful). It was pretty painful in my opinion, but the good thing is that the pain doesn't last long at all. Most people i know who have industrials say that the healing process is more painful than getting the piercing, but for me it was the complete opposite. Immediately after the piercing it throbbed and was a tiny bit sore for about an hour, then for the next 2 days it was completely painless. But after that, it was pretty sore for about 2-3 weeks, but it wasn't that bad. Now after having it 3 months, it still feels a bit uncomfortable when i sleep on it, sometimes it's a tad bit sore, but no big deal at all :)
Q:What are the full house scaffolding specification
7 "technical code for safety of wooden scaffolding in construction" (JGJ164-2008)8 "safety management of construction enterprises" (GB50656-2011)9 "construction safety of the bowl buckle scaffold technical specification" (JGJ166-2008)
Q:What's the film where gene Kelly dances on scaffolding? And at a gym?
I think it's Living in a Big Way.... I could be wrong...
Q:So I had a scaffold/industrial done about 10 weeks ago, and its been infected at the top hole only for about 3/4 weeks. It has like a little bubble near the hole and sometimes its filled with pus a little bit and sometimes its not. Well I went the doctors about 2 weeks ago and he prescribed me a weeks worth of antibiotics as well as anti-septic cream. So I took the pills for a week and it was clearing up, I was also applying the cream twice a day. But then yesterday I noticed the lump has gotten a little bit bigger. I don't know what to do, should I take it out? But I really don't want to. And plus the doc said to wait up to 3 weeks and if nothings changed to go back and take it out. If I continue to use the cream, will it eventually go? Thanks :)
have a piercer look at it.
Q:I had my scaffold pierced yesterday and now it is swollen and red. Its throbbing and painful. I have cleaned it and applied ice and antiseptic spray.I don't own any sea salt.HELP ME! I'M SO TEMPTED TO REMOVE IT.
Antiseptics are too harsh for a healing piercing, the pain, swelling and redness is completely normal. Stop using antiseptic and go to the grocery store to get some non-iodized sea salt, its only a few dollars and you can find it in the spice aisle where the regular salt is.
Q:What is a bar in the scaffold
Scaffolding in the cross section of the large cross bar, small cross bar.Large cross - vertical horizontal bar, which is located along the vertical axis of the scaffolding rod.A small transverse rod, a horizontal rod, which is horizontally arranged along the scaffold.
Q:If I know the length , width and height of the area for the scaffold, how do I calculate the tonnage?
tonnage is related to the volume of a certain material to be used in a certain project... so as to volume, tonnage is just the volume of the material to be used, given the specifiations in this case, scaffolds. consult your design and count the distribution of the scaffolds to be used.. average ratio of scaffolding tonnage is a ton per 10 square meter... also depends on the quantity of the project.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords