• Scaffolding ringlock ledger heads/end System 1
  • Scaffolding ringlock ledger heads/end System 2
Scaffolding ringlock ledger heads/end

Scaffolding ringlock ledger heads/end

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details

Model Number:
scaffolding ledger end
Type:
Scaffolding system
Material:
Q235, Q345 carbon steel
color:
self-colored, silver, yellow,green or as your requirement
Surface:
HDG,pre-galvanized,painted
Thickness:
3.0/3.2mm
Diameter:
48.3mm
Standard:
EN74,BS1139,SGS,CE ,ISO 9001:2008
Scaffolding system:
scaffolding ledger end
Stable:
durable
dismantle:
Easy to assemble

Packaging & Delivery

Packaging Detail:in pallet or in bundle. according to the length you needed to combine the container
Delivery Detail:no more 20days

Specifications

best price and good quality .
good bearing capacity .
Used time long .
very good stability .
covenient to transport

Kwikstage system

1.have our own factory
2.Good bearing capacity
3.Stable& durable
4.Easy to assemble or dismantle

Our capability

Produce Equipment: 4 forged production lines,2assembly line,2 bolish line ,1sets 400 punch   press,3sets 300t punch press

Produce Technology: stamping/pressing/forging;

Produce Capacity: 500 tons/month

Output: 3000 pcs/day couplers,3000pcs steel plank

Specification

1.Standard:

  size:48.3*4mm thickness steel tube  Length(mm):500/1000/1500/2000/2500/3000/3500/4000

2.Ledger:

  size:48.3*3.25mm thickness steel tube   Length(mm):1200/1800/2400

3.Transom:

 50mm*50mm*5mm thickness steel angle Length(mm):600/800/1200/1800

4.Brace(diagonal)

  size:48.3*2.5mm thickness steel tube Length(mm): 1830/2750/3530/3660

5.Bace Jack:

   Solid Bace Jack:34mm(diameter)*650mm(length)or as your request

   Hollow Bace Jack: 38mm(diameter)*4/4.5/5mm(thickness) or as your request


Q:Calculation method of complete scaffold
The most distant light is closer to us than the nearest darkness:Distance is usually just a myth
Q:Mobile scaffolding accessories prices
! Mobile scaffolding is the main frame, cross frame, cross diagonal brace, foot board, adjustable base and other components
Q:what do you think?pain wise? i know it's going to hurt as it's a peircing (duh) but will it hurt especially as it's two thick pieces of cartilage?
It's not going to hurt 'especially' don't worry. :) xoxox
Q:Scaffold removal should comply with those requirements......
3 removal of safety technical measures should be made clear to each operator. 4 removal of the scaffolding materials, debris and ground obstacles, and will be affected by the mechanical and electrical equipment and other pipelines, such as removal or protection.
Q:I would like to ask how much scaffolding steel prices, scaffolding steel pipe use what are the requirements?
1 scaffolding steel pipe material Q195, Q215 or Q235, 2 scaffolding steel pipe specifications of phi, phi, phi, phi, phi, phi, 3.25, phi, phi, phi, 2.752, 5, 3 scaffolding steel pipe length of 1-6 meters, half a meter specifications; according to customer requirements specifications4 scaffolding steel pipe standard SY/T5768-9, 5, GB/T3091-200
Q:The basic form of external scaffolding
Basic structureA bowl type steel tube scaffold is a multifunctional scaffold in our country with reference to foreign experience developed, its member nodes connected with bowl, because the bowl is fixed on the steel pipe, all components of the axial connection, good mechanical properties, which is reliable, consisting of the scaffold with good integrity, there is no fastener lost problem.
Q:why scaffold need for inspected within the preceding 7 days and after adverse weather condition?
It is a work safety issue. Past experience has shown that scaffolding sometimes gets modified by unqualified people (or weather) resulting in injury or death.
Q:In the Scarlet Letter, when Dimmesdale asks Hester who Chillingworth really is, why does she keep her oath to him of not revealing that he is her husband? Guilt? Morals? Thanks
Because she owes him since she cheated on him.
Q:I want to know the classification of scaffolding in the building
Steel tubular scaffold. As to the steel pipe, and combined with other type of steel pieces composed of scaffolding, such as the channel has a base in the backwater or scaffolding, connecting steel scaffolding and so on. ScaffoldingBowl buckle steel pipe scaffolding when using steel pipe, as a "single steel pipe scaffolding"; when using the steel cross bar, for the "steel pipe based scaffold".
Q:I had my scaffold pierced yesterday and now it is swollen and red. Its throbbing and painful. I have cleaned it and applied ice and antiseptic spray.I don't own any sea salt.HELP ME! I'M SO TEMPTED TO REMOVE IT.
Antiseptics are too harsh for a healing piercing, the pain, swelling and redness is completely normal. Stop using antiseptic and go to the grocery store to get some non-iodized sea salt, its only a few dollars and you can find it in the spice aisle where the regular salt is.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords