Product Description:

  • Sand Separator and Sewage Recycling Equipment 


  • Features:

  • 1. Small size and power, process simplification, cover small place.


  • 2. High performance processing mode, aggregate rinse thoroughly with less water.


  • 3. Comprehensive recovery utilization of sewage water, zero emission, save resources, reduce the pollution of the environment.


  • 4. Simple operation, manual and automatic control, reduce the manpower.


  • 5. The number of equipments and directions can be changed according to work-site.


  • 6. Special end shaft and bearing assembly to increase of service life. 

  • Parameters:


  • Model

    THS10 Sand Separator

    THS20Sand Separator

    Separate Capacity (T/H)

    10T/h

    20T/h

    Segregate stone capacity (mm)

    Stone and sand are not separate

    >φ5

    Segregate sand capacity (mm)

    φ1-5φ

    Power (KW)

    7.5

    7

    Mixing truck No. (Sets)

    <10

    10-20

    Weight (KG)

    2300

    4670


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the concept of on-site concrete mixer station
Concrete mixing station is mainly composed of mixing console, materials weighing system, material conveying system, material storage system and control system of large system and other ancillary facilities. Action: concrete mixing plant is used to concentrate the mixing of concrete, also called concrete precast. Because its mechanization, high degree of automation, productivity is high, and can guarantee the quality of concrete and cement, commonly used in concrete, long duration and site of quantities focus of large and medium-sized water conservancy, electric power, Bridges and other projects. Centralized with the development of municipal construction, stirring, provide commercial concrete mixing station has great advantages, and thus get rapid development, and to promote concrete pumping construction, the mixing, transportation, casting machinery joint operation to create the conditions. Basic introduction: concrete mixing station is mainly composed of mixing console, materials weighing system, material conveying system, material storage system and control system of large system and other ancillary facilities.
Q:What is the difference between a concrete mixer and a concrete mixer
The simple point is: the bones of the mixing tower are on top, and the bone is measured directly into the blender. The bone material of the stirring station is below, and the bone material is measured and then transported into the blender after the slanting belt. In a popular way, it is called the building, which is called the second ascent. Higher initial investment mixing floor production line 400000 station, because of mixing building bin above, therefore the steel structure will be bigger, inclined belt will be relatively longer. But in productivity, the churn is about 20 per cent more productive. In the operation, the energy consumption and the failure rate will increase due to the frequent start of the inclined belt of the mixing station, while the mixing building will be relatively low. Of course, in appearance, the mixing building is a bit more imposing than a mixer-stand, which can sometimes have an unexpected effect on the business. In addition, there are some technology mixing buildings that can be used, and the mixing stations can't be used, because the equipment is different. It's worth noting that the difference between the initial and the mixing stations is not absolute.
Q:What kind of sand is needed for a concrete mixer
Which have so many requirements, sand silt content not too many, too many big rocks, soil, too much, artificial sand and river sand can, had better not use weathering sand, not according to the standard to which have the standard, is to see the skill of your lab
Q:How long does it take to build a concrete mixer station?
Normally, between one and three weeks. Plan the main points of the stirring station Venue: single 2m3, 3m3, the equipment occupies an area of about 21mx51m. Add in the yard, parking lot, road, office building, repair shop, recycling pool and so on, usually need the site 40mx80m (the land of 5 acres). 2m3 and 3m3 stations usually require 60mx80m (7.5 acres). If the location is more complex, the layout of the equipment should be based on the utilization of the site. To reduce the cost of future operations, it is suggested that there be a river at the edge of the site so that it can be used to carry sand stones. Distance should consider the best range of concrete delivery vehicles, not too far away from the main site, but also for future development. Optional: choose according to the expected amount of concrete. In a year of 300 working days, eight hours a day, the actual efficiency is lower than the nominal value given the various factors that are affected. Considering the requirement of the equipment for regular maintenance and maintenance, and the requirement of the high demand in some period, it is suggested that the equipment should be purchased. In some areas, the construction of new concrete and concrete stations must be at least two.
Q:What type of concrete mixer is needed for each hour of concrete 90 cubic meters?
The mixing host of HZS90 concrete mixing station can be matched with the JS double sleeper shaft reinforced concrete mixer or imported concrete mixer host. The host is equipped with dust collecting machine, which has automatic dust collecting, dehumidification, exhaust, and the ability to recycle the collected dust to the main engine. The dust is excellent. The top of the cement bin is equipped with cylinder dust collecting machine, which is efficient and low noise. The main frame is packed in color plate, neat, beautiful and dustproof, with good view. Double post integrated installation, convenient operation and economical site. HZS90 concrete mixing station, the theoretical productivity of the device is 90 cubic meters per hour. The mixing host is the JS1500 type strong mixer, the nominal capacity is 1500L. The toppings are 1600L, the maximum productivity of the screw conveyor is 80t/h, and the maximum particle diameter is 80mm. Cement weighing accuracy and range (0 ~ 900) plus or minus 1% kg, admixtures weighing accuracy and range (0 ~ 50) plus or minus 1% kg, aggregate weighing range and precision of 0 x 5000 plus or minus 2%, HZS90 commodity concrete mixing station - unloading height is 3.8 meters, can be appropriately increase or decrease in height, in order to satisfy the demands of discharge conveyor. The standard reference weight is 97 x 103kg, which needs strong base to stabilize the mixing station
Q:Classification of concrete mixing stations
Commercial concrete mixing station: single/double HZS90 concrete mixing station, single/double hzss120 concrete mixing station, single/double hzss240 concrete mixing station, single/double hzss240 concrete mixing station. Engineering concrete mixing station: HZS75 concrete mixing station, HZS60 concrete mixing station, HZS50 concrete mixing station, HZS35 concrete mixing station, HZS25 concrete mixing station. Mobile concrete mixer station
Q:The main components of a mixing station
Feeding system: aggregate bucket, aggregate weighing hopper, flat belt machine, inclined belt conveyor. Mixing system: the main machine is a double-deckshaft mixer, reducer, cement weighing hopper, water and additive weighing hopper. Cement supply system: cement warehouse, screw conveyor, air compressor, screw electronic. Automatic water supply system: water tank, pump, pipe. Electrical operating system: computer console, electric control cabinet, operation room. Operation control system: microcomputer control or manual control.
Q:What is the daily routine of the concrete mixing station?
The work of the mixing station is simply the process of production - delivery - construction - curing. Each process consists of the raw materials - the mixing platform - the dispatcher - the on-site technical service. A mature mixing plant are two of the most important department: laboratory and operation department, laboratory to ensure the concrete product quality, operation department to ensure the construction process of concrete delivery smoothly. The other departments serve the two departments.
Q:What does HZS mean in the HZS120 concrete mixing station
Because building aggregate measurement compared with standing aggregate metering, reduced the four of the intermediate links, and the vertical blanking metering, saved measuring time, thus greatly improving the production efficiency, under the condition of the same model, mixing building production efficiency than mixing plant production efficiency by a third. Such as: HLS90 floor of production efficiency and production efficiency of HZS120 stand HLS120 floor of production efficiency, production efficiency is equivalent to HZS180 stand HLS180 floor of the production efficiency is equivalent to the productivity of HZS240 station.
Q:Which staff does the concrete mixing station need?
Move the cement iron pipe, driver! technology, webmaster, laboratory (deputy) director of the general, production manager, sales managers, salespeople, scheduling, lab team leader, the operator (inspection), quality inspection, proportioning design, the material inspector technicians,

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range