Ready mixed concrete mixing plant with capacity 35 cube per hour hot sale concrete mixing plant with bucket elevator

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

I. Technical Parameter

Serial

No.

Item

Parameter or Guide Line

1

Type

Cement Concrete Mixing Plant

2

Design Reference

National Standard:  Concrete Mixing Plant: GB10171-2005

Concrete Mixer: GB/T9142-2000

3

Work Environment

1Working temperature 10C~400C

2Relative humidity is no more than 90%

3The most degree of carrying snow is 800Pa

4The most degree of standing wind is 700Pa

5Height above sea level on working is no more than 2000m

4

Applicable Raw Material

StoneSandWaterAdditiveCementing MaterialCementFlyashMineral Powder

5

Requirement of Raw Material

I. Cementing MaterialaPortland cementBlast furnace  slag cementPozzolanic cementFlyash Cement bMixed MaterialFlyashGround SlagPozzolanic AdditionInactive Addition

II. AggregateaCoarse AggregateStone-Crushed Stone、                          PebbleThe Maximum Grain Size of Aggregate (pebble/crushed stone)80/60 mm

            bFine AggregateSand-Natural SandManufactured Sand

III. WaterDrinking Water

IV. Additive: 1)Water Reducer2)Air Entraining Agent3)Pumping Aid4)Retarder5)Accelerating Agent6)Early Strength Agent7)Water-proofing Agent8)Anti-corrosion Admixture9)Expanding Agent10)Antifreeze

6

Theoretical Productivity

50m3/h

7

Discharging Height

3.8m

8

Installed Capacity

About 74kwExclude Screw Conveyer

9

Total Weight

About 26.5tExclude Powder Silo and Screw Conveyer

10

Floor Area

2612m

11

Mixing System

Matched Mixer

Power

Charging Capacity

Discharging Capacity

JS1000A

37kw

1600L

1000L

12

Aggregate Weighing System

Capacity of Aggregate Bin

Capacity of Weighing Hopper

Power of Electric Drum

Weighing Precision

7m3×3

3600L

5.5kw

±2

13

Elevating System

Capacity of Elevating Hopper

Power of Windlass

1600 L

18.5 kw

14

Cement Weighing System

Volume of Weighing Hopper

Weighing Scope

Weighing Precision

750L

0-750 kg

≤±1

15

Water Weighing System

Volume of Water Hopper

Power of Water Pump Motor

Weighing Precision

300L

3 kw

≤±1

16

Liquid Additive Weighing System

Volume of Additive Scale

Volume of Additive Tank

Power of Water Pump Motor

Weighing Precision

25L

2m3

0.75kw

≤±1

17

Pneumatic System

Power of Air Compressor: 7.5kw

18

Screw Conveyer

Specification

Ф273

Ф219

Ф168

Conveying Capacity

65t/h

45t/h

25t/h

Power

15 kw

11 kw

7.5 kw

19

Powder Silo

50t100t150t

20

Control Room

6m2


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Does the concrete mixing station name have the name of the businessman concrete
Original concrete is the construction unit oneself mix, the existing specialized manufacturer presses the need to produce concrete, the product that produces is concrete.
Q:Classification of concrete mixing stations
Commercial concrete mixing station: single/double HZS90 concrete mixing station, single/double hzss120 concrete mixing station, single/double hzss240 concrete mixing station, single/double hzss240 concrete mixing station. Engineering concrete mixing station: HZS75 concrete mixing station, HZS60 concrete mixing station, HZS50 concrete mixing station, HZS35 concrete mixing station, HZS25 concrete mixing station. Mobile concrete mixer station
Q:How to choose a good concrete mixer station?
For simple concrete mixup stations, the overall cost of equipment is much cheaper, because the configuration is different and a lot of configuration is eliminated. But cement weighing cannot save configuration independent water weighing measurement more accurate to efficient, do not use water weighing system can also be mixing concrete, but there is a big hidden trouble. The water weighing system is not suitable for individual water weighing system, and it can reduce the investment of a simple mixing station by about 7, 000 yuan. And shortcomings is not water in the mixing drum of the weighing system and water, time node device can be used to set the water within a certain time interval to churn, but increased water and forced concrete mixer mixing time, still can cause concrete model is not stable. Therefore, although do not use water weighing system can save investment, but will increase the mixing time of concrete and affect the stability of the concrete, so the customer can choose according to oneself circumstance.
Q:What are the facilities of the concrete mixing station
One. Stir the host The mixing machine is divided into strong mixing and self-falling stirring. The powerful mixer is the mainstream in the domestic and foreign mixers, it can stir the liquid, semi-dry hard and hard and so on. The main mixing liquid concrete of the self-falling mixer is very rarely used in the mixing station. Two. Material transport system The material transport consists of three parts. Aggregate conveying; There are two ways of conveyance and belt conveyance. The advantage of hopper promotion is that the area is small and the structure is simple. The advantage of belt transport is that the transport is large, efficient and low. The belt conveyor mainly applies to the mixing stations that have aggregate storage, thereby increasing the productivity of the mixing stations. Powder conveying; The powder used in concrete is mainly cement, fly ash and mineral powder. The most commonly used powder conveyors are conveyors of screw conveyors, and the large mixing buildings are carried by pneumatic conveyer and scraper. The advantages of screw transport are simple structure, low cost and reliable use. Liquid transport mainly refers to water and liquid admixtures, which are delivered separately by water pumps.
Q:The main components of a mixing station
The conveying system of materials is made up of three parts. Aggregate conveying; There are two ways of conveyance and belt conveyance. The advantage of hopper promotion is that the area is small and the structure is simple. The advantage of belt transport is that the transport is large, efficient and low. The belt conveyor mainly applies to the mixing stations that have aggregate storage, thereby increasing the productivity of the mixing stations. Powder conveying; The powder used in concrete is mainly cement, fly ash and mineral powder. The most commonly used powder conveyors are conveyors of screw conveyors, and the large mixing buildings are carried by pneumatic conveyer and scraper. The advantages of screw transport are simple structure, low cost and reliable use. Liquid transport mainly refers to water and liquid admixtures, which are delivered separately by water pumps
Q:Which staff does the concrete mixing station need?
Mainly depends on how big is your station, whether can fully staffed, mainly included: general manager, deputy general manager, technology, webmaster, laboratory (deputy) director of the general, the production manager, sales managers, salespeople, scheduling, lab team leader, the operator (inspection), quality inspection, proportioning design, the material inspector technicians, machine operators, resposible, site, monitor of overhaul, maintenance engineer, loadometer, finance, cashier, mixers, pump truck drivers, company drivers, forklift driver, the handyman, chef, etc These are the main people who want to help you.
Q:How long does it take to build a concrete mixer station?
The main idea is that the goods are completely incomplete, and the crane, the manpower, the mechanical tools. If everything is in place, then the pure installation will be two weeks to a month. Of course, also see you buy what type of product, container type is compared commonly faster, smaller and faster, under 3000 type slightly faster, 4000 and 5000 slowly
Q:How much concrete is produced by the js1000 type of the concrete mixing station
The production standard test concrete is not less than 50 cubic meters per hour. But the actual situation is (fully automatic), usually more than 40 cubic meters per hour. The cement productivity would be low by hand. Concrete mixing station, also known as concrete mixing station, concrete mixing station is mainly composed of mixing console, materials weighing system, conveying system, material storage system and control system and so on five big systems and other ancillary facilities. Because building aggregate measurement compared with standing aggregate metering, reduced the four of the intermediate links, and the vertical blanking metering, saved measuring time, thus greatly improving the production efficiency, under the condition of the same model, mixing building production efficiency than mixing plant production efficiency by a third. Concrete mixing station is mainly composed of material storage system, materials weighing system, material conveying system, mixing console and electric control system and other ancillary facilities. The mixing and electrical control system is a key part of the whole equipment.
Q:What are the ingredients for the concrete mixing stations?
The main ingredients of admixtures are: the mother fluid, the composition of the air and the composition of the mixture, and the water. The concrete formulations are determined according to the different materials of concrete, which is usually the mother solution and the adjustment time. The parent fluid is itself well adapted and does not require a lot of material.
Q:What is the difference between a concrete mixer and a concrete mixer
The simple point is: the bones of the mixing tower are on top, and the bone is measured directly into the blender. The bone material of the stirring station is below, and the bone material is measured and then transported into the blender after the slanting belt. In a popular way, it is called the building, which is called the second ascent. Higher initial investment mixing floor production line 400000 station, because of mixing building bin above, therefore the steel structure will be bigger, inclined belt will be relatively longer. But in productivity, the churn is about 20 per cent more productive. In the operation, the energy consumption and the failure rate will increase due to the frequent start of the inclined belt of the mixing station, while the mixing building will be relatively low. Of course, in appearance, the mixing building is a bit more imposing than a mixer-stand, which can sometimes have an unexpected effect on the business. In addition, there are some technology mixing buildings that can be used, and the mixing stations can't be used, because the equipment is different. It's worth noting that the difference between the initial and the mixing stations is not absolute.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range