Pvmax3Solar Mounting System

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Pvmax3Solar Mounting System

Die Schletter Freilandsysteme zeichnen sich durch minimale Montagezeit,

lange Lebensdauer und hohe Wirtschaftlichkeit aus. Anhand vorgegebener Projektdaten - länderspezifischer Normen und Vorgaben - berechnen wir für Sie die komplette Statik und

erstellen einen lückenlosen Projektplan. Dies garantiert eine verlässliche Standsicherheit und

hohe Ausfallsicherheit.

  • Baukasten-Komplettsystem mit Aufbauanleitung

  • Für 1-10 Stellplätze

  • Anwendbar für die meisten Standard-Modulgrößen

  • Dachneigung 10 Grad - optimiert für unterschiedliche Ausrichtungen

  • Auspacken – Aufstellen – Fertig

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the solar stent system?
should be south (tracking system exception) Installation angle: equal to or close to the installation of the local latitude Load requirements: wind load, snow load, earthquake requirements Arrangement and spacing: Combined with the local sunshine conditions Quality requirements: 10 years without corrosion, 20 years of steel does not reduce, 25 years still have a certain
Q:What are the characteristics of the hydraulic support hydraulic system?
Third, the hydraulic support can be replaced lines and substitutability must be strong, that is, after the failure, can be replaced in the shortest possible time and maintenance, thereby reducing the loss and protect the safety of workers!
Q:How does the hydraulic support work
these actions by the emulsion pump Station supply of high-pressure liquid, through a variety of valve control column, jack to achieve the expansion and contraction.
Q:What are the benefits of finished stents?
Steel parts and components to achieve modular / standardized production, can improve production efficiency and reduce labor costs; finished stent system easy to install, easy maintenance (parts easy to purchase), shorten the duration, reduce maintenance time and so on.
Q:What is the full support system
Full scaffolding is mainly used for large single-storey building, exhibition hall, gymnasium and other high-rise, large building between the top of the building decoration and structural construction, must contain pole, bar, bracing, scissors support.
Q:Is the template and stent two or one?
Material staff, that is, the contractor to see the words in accordance with the quota on it. The template is the contact area, the stent is the building area.
Q:What is a finished hanger?
Finished hanger is used for suspension and support equipment, pipelines and other facilities of the auxiliary system, all of its components are in the factory prefabricated production, construction site direct installation and construction. Assembled building pipelines The hanger system can carry a variety of static and dynamic loads in the building to ensure the safety of the building system
Q:What is the metal material for the RESOLUTE bracket?
If the core of the stent is a lipophilic molecule, it is compatible and firmly wrapped in drugs, in 6 months and longer time a small amount of uniform release of drugs to ensure sustained and stable drug stent effect.
Q:What is the support frame at the bottom of the car?
The rear end of the ear through the steel plate spring hanging pin and the rear hanging ear hanging ear holder connected to the rear end can be free to swing, the formation of activities lugs
Q:How to remove the climbing bag bracket
We can be mountaineering backpack, clothing, food, shoes and sleeping bags as a total of five elements of the wild travel.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range