• PVC  doors /windows System 1
  • PVC  doors /windows System 2
PVC  doors /windows

PVC doors /windows

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

  • pvc windows,  pvc windows and doors

NameMTS-60 pvc glass windows
ProfileReinforced UPVC
Colors
White,grey,wood colors etc
Glass
Single,double,triple glazing;tempered;low-e;reflective;clear or colored
CharacteristicsElegant apperance,durable quality,competitive factory price
StyleSwing,sliding
ShapeRectangle,square,and other customized shape
Area applicationBedroom,kitchen,balcony etc
PackingStandard package:

*double film surrounding the products, wrapped up in wooden case ,space filled with foam;
*loading with air bag to fix the container space

*accept customized package


      China supplier of pvc doors windows

Q:Do you want to eat the windows and doors?
Yes, but can not eat too much. Eat too much, then the pressure line can not afford to unload, and the glass will not drill into the
Q:What is the difference between a window and a beam and a ring beam?
Landlord / hello Door and window over the beam refers to the door, the window of the beam, generally with the wall with the same or thick. Mainly to bear the weight of the beam to the roof of this part of the masonry. Ring beam is mainly to enhance the structural integrity of the casting components, and the construction column pouring into one, so that the entire engineering structure has a certain seismic performance.
Q:What are the problems with the installation of windows?
Wall plaster and hole whether there is a gap?
Q:I would like to ask the doors and windows to install the master, the frame installed after the glue is good, or wait until the next glass together with plastic?
Box installed after filling the expansion agent, there is no gap can not fight, with the latter loaded a glass of money relationship is not. Glass is made of glass
Q:Bathroom, washbasin (door) face paste mosaic, what is the material is better plate? What is the construction process? More
Washing table (cabinet door) face mosaic, had to use woodworking board to do the base layer because it is necessary to always open, if not open, then available cement pressure board hanging plaster stickers mosaic.
Q:Building interior decoration (construction) construction time node, for example, the wall putty putty, spray latex paint and doors and windows frame installation, paving tile order The
The principle of built-in construction should follow the principle of the first, the first after the next, is the mud after the wood (finishes) of the major principles, specifically as follows for reference: room closed (outside the door window frame - glass installation and protection) The ceiling of the mechanical and electrical end of the positioning of the ground surface of the ground, waterproof; door door installation; the installation of the wall, Wall ceiling, ceiling paint primer and in the coating; installation of wooden doors, wooden finishes, fixed, the top of the wall Furniture; installation of wood flooring; receiving baseboard, switch panel; baseboard switch panel around the second leveling; paint surface; lighting and other mechanical and electrical terminal installation.
Q:Now the management of the project in a problem, the construction of the project is to rough housing delivery to the owners, then off the bridge aluminum doors and windows need to be installed in place, then broken bridge aluminum door frame how to deal with the lower part? Is reserved in accordance with the provisions of the provisions of 5-8mm? Or first consider the owner of the renovation of about 4cm and then increase 5-8mm? Early completion of the project is in accordance with the provisions of the provisions of 5-8mm reserved for the construction, the owner of the door after the renovation of the decoration of the ground less than the ground, causing the rainy season to the indoor overflow. If you choose to increase the decoration space 4cm or so to increase 5-8mm construction, the lower part of how to deal with? More
The use of expansion grouting grouting on it
Q:What are the steps behind the construction of the building after the closure?
Hurry to do roof insulation, waterproof ah! If you encounter rainy season, do not do waterproof on the trouble ah!

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords