good quality aluminium doors windows

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Hot products Aluminium folding door Aluminium windows and doors

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Bathroom, wash basin cabinet door mosaic
Washing table (cabinet door) face mosaic, had to use woodworking board to do the base layer because it is necessary to always open, if not open, then available cement pressure board hanging plaster stickers mosaic.
Q:Can ordinary sliding windows be installed with stealth screens?
Can be installed, but if there is a screen runway, then it is recommended to install the film is economical and practical
Q:Common doors and windows installed several ways? What are the advantages and disadvantages?
Hello: doors and windows of the installation methods are plug and mouth two "plug" to install this installation method of steel doors and windows of the size requirements of strict, otherwise it is not put into the gap is too large. At the same time the window plaster also requires accurate size. And asked to wipe into the mouth type: that is, within the narrow width, so after the installation is complete, both inside and outside are playing full of sealant, the middle to play PVC foam agent "mouth" to install the steel window size requirements are not very strict, After the window frame can be carried out indoors and plaster. As the plaster is done by the construction workers, so the gap between the window frame and the wall is not necessarily able to handle. In addition to the installation before the use of packaging with the window to protect the finished product, wiping the gray after the packaging needs to be removed, so inside and outside the window frame and the wall will appear between the uneven size of the gap, playing sealant, it is impossible Playing evenly, as well as causing leakage.
Q:Aluminum alloy window frame is installed after all around to play foaming agent?
Aluminum doors and windows frame installed after the only need to play in the left, right and above the three sides to play on the line, the mouth not to fight, to use cement mortar can be filled, and the left and right sides of the bottom 10cm also use cement mortar Fill in.
Q:Plastic steel window frame and the gap between the walls shall not be filled with cement mortar, should be filled with elastic material filled with what kind of elastic material is better
First polyurethane foam, and then caulking mortar.
Q:The installation of the horizontal lines, vertical lines and out of the line, respectively, what is the use of what in the end
In the measurement, the hole in the same horizontal line should be measured on a horizontal line to measure the height of the hole, and the width of the hole in the same vertical line is measured, whichever is the minimum (the minimum value of which is negligible, Doors and windows through the repair hole alone) as the same specifications of the doors and windows of the design guidelines for the external walls of the wall is not clear water or cement mortar exterior decoration, should be the construction axis and the horizontal line as the benchmark window and the horizontal axis, to measure the doors and windows The minimum width and height of the hole, and should be based on building outside the row of rulers to determine the final size of the doors and windows processing. The determination of the gap between the construction hole and the doors and windows, in excluding the architectural design error, by measuring the minimum horizontal height and minimum vertical width of the hole as the design criteria for the size of the doors and windows, do not have to consider the size of the building openings in Table 1 allowable deviation To consider the table 2 and Table 3 doors and windows when the deviation occurs when the measurement occurs when the positive deviation of the probability that the measurement of the size of the phenomenon is too large, doors and windows under the effect of temperature expansion and decorative surface layer thickness and other factors, Should be determined in accordance with Table 4, the gap between the doors and windows theoretical gap.
Q:Is not all the doors and windows are located in the middle of the wall?
To my Google space to see it, maybe you will find the answer, what questions you can message, the space has my contact, because the beginning of finishing, so a lot of technical articles are not the whole go up, but will soon complete ,
Q:What is the gap between the window and the wall?
The window to install playing foaming agent, hole and window frame around the gap should be left in the 2 cm or so, the gap is too small blowing agent is difficult to hit into the gap is too large blowing agent and difficult to play the role of sealing, and then The gap is too large will affect the appearance. If you have more questions, you can click on ID consultation.
Q:EPS line is good or GRC line is good? Villa facade, doors and windows frame.
I am doing GRC from the time that GRC is the time from the test of the EPS light but time long material stability do not know how
Q:Sun door and window frame 80-66 refers to what
Cross-section width of 80mm, cross-section height of 66mm

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range