Polypropylene Geogrid,Fiberglass Geogrid,Polyester Geogrid

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
10000 m²
Supply Capability:
300000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Structure of  Geogrid Description:

Grating is made of polypropylene, PVC and other polymers by thermoplastic or moulded into a two-dimensional grid or have a certain height of 3 d mesh screen grid, when used as civil engineering, referred to as the geogrid.
Geogrid is a major geosynthetic materials, compared with other geosynthetic materials, it has unique properties and efficacy. Commonly used as reinforced geogrid structure reinforcement material or composite reinforcement materials, etc.It is divided into plastic geogrid, steel-plastic geogrid geogrid, glass fiber and polyester warp knitting polyester geogrid geogrid four categories.

2.Main Featrures of Geogrid:

The intnse strength and small deformation.

Corrosion resistance, long service life
Optimum performance and good dimensional stability
Construction convenient and quick, short cycle and low cost.

3.Specification of Geogrid:

 

Break Strength(Kn/m)   MD/CMDBreak Elongation(%) MD/CMDSize(mm*mm)Width(m)
GG2525≥25/≥25≤3/≤312*501~6
GG3030≥30/≥30≤3/≤312*501~6
GG4040≥40/≥40≤3/≤312*501~6
GG5050≥50/≥50≤3/≤312*501~6

4.Geogrid Images:

Polypropylene Geogrid,Fiberglass Geogrid,Polyester Geogrid

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How can the toilet waterproof works fail?
Use 755 new waterproof material can be painted three times. There is also a new type of waterproof material is water-like brush is also three times, you can go to the building materials market to see, you know.
Q:Rigid (concrete) waterproof roofing shop SBS coil can brush a layer of waterproof paint before?
First, rigid (concrete) waterproof roofing SBS membrane should not be painted before the coating of any waterproof coating, otherwise it will damage the bonding strength of the coil and the grassroots.
Q:What are the key points and contents of the quality control of waterproof material?
1, polymer cement waterproof coating: it consists of a variety of water-based polymer emulsion and a variety of additives mixed with high-quality cement powder composition. Because of its high cost of polymer emulsion components (about 19,000 yuan / T), and the low cost of powder (about 800 yuan / T), it is because the liquid material, powder huge spread, the vast majority of fraud is to use 801 Glue + fossil powder + green dyestuff + cement blending; the other is to change the liquid material, the proportion of powder will be your liquid material consumption, as much as possible to increase the amount of powder. Resulting in poor waterproof coating adhesion, intolerance, after the completion of the finished product should not be too hard to pull down by hand, and was not much ductility of the sheet or even hand rub a few times into a powder, with blisters Will break down into small pieces. Can also be used to cut the finished product coating and then placed in the refrigerator freezer room after 8 hours to remove, gently forced to break will be broken, and the national standard requirements of the material to achieve low temperature flexibility -10 ℃.
Q:What should you pay attention to before the construction of the basement waterproofing membrane?
Plastic runway construction should pay attention to: 1, before the construction, must be on the asphalt concrete foundation for quality acceptance, acceptance criteria according to design standards and technical specifications, the plastic runway in the corresponding drainage facilities, can be used around the clock. The ambient temperature should be controlled at 5 ℃ ~ 38 ℃, to avoid below 5 ℃, 38 ℃ above the ambient temperature operation, the relative humidity control below 70%, the foundation requires a clean, according to the temperature and relative humidity to adjust the amount of catalyst The curing speed control appropriate. Color paste and prepolymer storage, the lid to be tightened, before use to detect moisture, qualified after use, the water in the foundation should also be controlled to avoid the bubble after the glue. Plastic pavement materials must be carefully checked when the quality inspection certificate and validity period.
Q:Villa roof leakage what general reasons, what materials to remedy
Fourth, the roof of a large area of ​​leakage or a number of water leakage points, the first by the professionals to check whether the cracks, according to the previous program to deal with the cracks in the roof covered with waterproof membrane, to enhance the waterproof effect, but also And then covered with insulation board, because the height of the insulation board in 20 cm or more, to achieve the protection of waterproof layer and thermal insulation of the double effect. Wall cracks appear seepage, under normal circumstances the professional construction team will use the basket, by the maintenance staff in the external wall construction.
Q:Roof for the insulation, Master roof, using two waterproof construction program
Third, security measures 1, firmly establish the "safety first, prevention first" safety production policy. Before the operation, the site management personnel must be to the operation team to carry out security technology to the end, and actively carry out pre-class security activities, security personnel check, supervise. 2, the roof around the poles outside the scaffolding (protective railings), roof construction is strictly prohibited removal. 3, roof construction, debris and other materials is strictly prohibited from the roof directly down throwing. 4, storage of coils and adhesives warehouse or site to prohibit the fireworks, for the use of fire, there must be fire prevention measures, and should set a certain number of fire extinguishers and sand bags. 5, oil drums should be flat, not two carrying, in the transport process, pay attention to balance, the spirit to focus, to prevent accidental fall caused harm. 6, transported to the roof of the material, should be scattered on average, with the use of transport, not concentrated stacking. 7, the use of torch, you should clear the surrounding flammable items, must be away from the base of oil, is strictly prohibited in the brush base oil area using the torch. Torch petrol should not be over full, cheer should not be too much, in the fire site must be equipped with fire equipment.
Q:Can acrylic materials be perforated? How to do waterproof after punching?
Acrylic material thickness is generally below 2MM, Plus the total thickness of glass fiber reinforced plastic materials are generally below 4MM,
Q:I would like to ask how to do in the warm water above,
Do nothing to use, because the biggest leak to the hidden danger is to warm the water, but your waterproof design does not include the warm water, you say your waterproof layer construction, in the end how much significance. It is recommended to make the waterproof floor to warm the following, as to what kind of good is not good to say that good things, that kind of good is good.
Q:What is PE waterproof cloth and PVC tarpaulin
The characteristics and performance index of waterproof cloth products 1. Tensile strength index: warp strength ≥ 2100N / 5CM, zonal strength ≥ 1600N / 5CM; 2. No leakage of water, water pressure ≥ 2000MM water column; 3. Low temperature, cold temperature -20 ℃; 4 Can be mildew, mildew experiment for the first level. Product Usage 1. Can be used car, train, ship cargo tarpaulin; 2. It can be used for the open storage of the harbor airport at the station terminal harbor; 3. Can be set up temporary granary and a variety of crops covered with open-air; 4. Can be used for construction site power construction site and other sites to build temporary shed, temporary warehouse materials; 5. Can be processed camping with tents and various machinery and equipment outside the jacket.
Q:FRP finished brush on what can be waterproof do not fade
On the surface of the gel coat it is, a lot of gel coat points, the specific performance of what you want, you can communicate with the supplier

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range