Polypropylene Geogrid,Fiberglass Geogrid,Polyester Geogrid

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
10000 m²
Supply Capability:
300000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Structure of  Geogrid Description:

Grating is made of polypropylene, PVC and other polymers by thermoplastic or moulded into a two-dimensional grid or have a certain height of 3 d mesh screen grid, when used as civil engineering, referred to as the geogrid.
Geogrid is a major geosynthetic materials, compared with other geosynthetic materials, it has unique properties and efficacy. Commonly used as reinforced geogrid structure reinforcement material or composite reinforcement materials, etc.It is divided into plastic geogrid, steel-plastic geogrid geogrid, glass fiber and polyester warp knitting polyester geogrid geogrid four categories.

2.Main Featrures of Geogrid:

The intnse strength and small deformation.

Corrosion resistance, long service life
Optimum performance and good dimensional stability
Construction convenient and quick, short cycle and low cost.

3.Specification of Geogrid:

 

Break Strength(Kn/m)   MD/CMDBreak Elongation(%) MD/CMDSize(mm*mm)Width(m)
GG2525≥25/≥25≤3/≤312*501~6
GG3030≥30/≥30≤3/≤312*501~6
GG4040≥40/≥40≤3/≤312*501~6
GG5050≥50/≥50≤3/≤312*501~6

4.Geogrid Images:

Polypropylene Geogrid,Fiberglass Geogrid,Polyester Geogrid

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Rigid (concrete) waterproof roofing shop SBS coil can brush a layer of waterproof paint before?
First, rigid (concrete) waterproof roofing SBS membrane should not be painted before the coating of any waterproof coating, otherwise it will damage the bonding strength of the coil and the grassroots.
Q:I would like to ask how to do in the warm water above,
1, I think the flexible mortar, waterproof paint better, because these materials in the construction process, not to warm the temperature caused too much impact, if the shop waterproofing membrane is too heavy, may affect the warm heat. 2, generally in the floor before the warmth, first do a waterproof, paved to warm to do once.
Q:Js waterproof coating without powder can brushing
5. Coating maintenance: JS cement-based waterproof emulsion coating construction after 24 hours after the end with a damp cloth to cover the coating or spray water to maintain the coating, usually 2-3 days; air humidity, poor ventilation of the local dry The time period may be longer, and vice versa; 6. Check the construction of JS waterproof coating (closed water test): bathroom, pool and other parts in the JS cement-based waterproof emulsion waterproof layer after dry (at least 24 hours in summer, at least 48 hours in winter) stored water for 48 hours to see the water Construction is not qualified. Light wall must do the water test. JS waterproof coating See the amount of: under normal circumstances, the amount of about 0.6-1kg / ㎡, the actual amount from the use, the use of parts, rough surface roughness, environmental factors such as the decision.
Q:What should you pay attention to before the construction of the basement waterproofing membrane?
Plastic runway construction should pay attention to: 1, before the construction, must be on the asphalt concrete foundation for quality acceptance, acceptance criteria according to design standards and technical specifications, the plastic runway in the corresponding drainage facilities, can be used around the clock. The ambient temperature should be controlled at 5 ℃ ~ 38 ℃, to avoid below 5 ℃, 38 ℃ above the ambient temperature operation, the relative humidity control below 70%, the foundation requires a clean, according to the temperature and relative humidity to adjust the amount of catalyst The curing speed control appropriate. Color paste and prepolymer storage, the lid to be tightened, before use to detect moisture, qualified after use, the water in the foundation should also be controlled to avoid the bubble after the glue. Plastic pavement materials must be carefully checked when the quality inspection certificate and validity period.
Q:Bathroom first leveling or do waterproof, what is the difference
Is the first water and then leveling. Home improvement toilet ground specific process practice: 1. The base layer, and which layer with the structural board, with cement mortar wipe. It is recommended to set the floor drain, the grassroots level should be flat and the direction of the leak to the slope. Against the wall and the root of the root should be wiped rounded.
Q:Roof sunscreen waterproof layer leakage, brush milk white plastic can solve it?
Second, check the plaster layer is empty, if not empty easy to use polyurethane brush twice, the surrounding multi-coated 10 cm. If the empty drum, then use the cutting machine to remove the plaster within the scope of the plaster, along the cracks on both sides of the expansion of 10 cm brush twice the polyurethane, brush the cement slurry and then do the surface layer. If a large area of ​​leakage, it is recommended to use acrylic waterproof coating brush twice, because the polyurethane black too heat in summer affect the indoor temperature.
Q:Roof leakage, what materials do the best waterproof
The Second, if the roof is only the original did not do waterproof, only need to remove the leaky parts of 2 ~ 3cm deep after cleaning, you use asphalt irrigation, and now there is finished asphalt coating, such as sunny day when the treatment will basically not Leaked out. If there is a waterproof layer is too much trouble, to be around a range of waterproof tick, re-do waterproof, do when the attention and the original waterproof junction to do reinforcement layer. There are many ways to deal with leak detection, or to find some professional leak-proof companies to deal with this problem.
Q:Slope roof drains do not need to be waterproof
need. Roof waterproof layer regardless of which form and materials, constitute the entire roof of the waterproof drainage system, all the necessary pipes, flues, drainage holes, embedded iron and pillars and other roof out of the facilities, should be done in the roof waterproof Layer to properly handle the structure of the node, with particular attention to the connection part of the soil and the drain part of the water flow.
Q:A complete set of basement waterproof construction program
Second, the basement of the external walls of water leakage construction preparation 2.1 Technical preparation 2.1.1 Selection of construction methods Waterproof engineering is related to the use of the project an important indicator, it is the construction process of a key project, difficult engineering. The choice of construction methods and programs has a direct impact on the quality of construction. The underground wall of the project SBS waterproofing membrane with hot melt method full construction. 2.1.2 before the start of the project, the first organization of engineering and technical personnel to enter the construction site, to understand the situation, to further understand the characteristics of the project to solve the contradiction between the construction technology and the implementation process. 2.1.3 technology before the end of the construction of waterproofing works by the professional foreman in accordance with the construction drawings and the existing national norms require the actual situation of the project to the construction team in writing to the end. The contents include construction site, construction sequence, construction technology, construction level, node fortification method, enhancement site and practice, project quality standard, guarantee the quality of technical measures. And after the field technical person in charge of the strict implementation of the audit.
Q:Can Henkel have water against him?
In order to ensure the quality of the proposed do not add water, the general finished materials are proportional, emulsion and powder, in strict proportion.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range