Asphalt roofing felt is conformity with ASTM standards of the USA.
The roofing felt is widely used as underlayment which is under asphalt shingles. Its saturation rate is 100%,that’s to say, both water and air cannot enter.
Detailed Specification of Asphalt roofing felt:
Model |
Width |
Length |
Thickness |
Weight |
Qty/pallet |
Qty/40'GP |
ASTMD4869#15 |
36inch |
144feet |
0.5mm |
38lbs |
39rolls |
1560rolls |
ASTMD4869#30 |
36inch |
72feet |
0.7mm |
30lbs |
52rolls |
1924rolls |
ASTMD226 #15 |
36inch |
144feet |
0.7mm |
45lbs |
30rolls |
1110rolls |
ASTMD226 #30 |
36inch |
72feet |
1.2mm |
48lbs |
30rolls |
1110rolls |
Pictures of of Asphalt roofing felt:
- Q:Roof leakage, what materials do the best waterproof
- First, the roof leak to find the first leak, looking for the main leak from the roof to the lower to find leakage. The first is to see if there is no cracks in the roof, the original waterproof layer is not aging, the roof of the original SBS waterproofing membrane has no bubbles, there are bubbles to prove that the water has entered the bottom of the waterproof layer, and thus leaking. There is a block on the roof of the gutter is not blocked in the countryside, there are still a large number of tile-roofed house, when the tiles due to damage caused by the roof leakage, as long as the replacement of tiles can be, this step is also known as "
- Q:How can the toilet waterproof works fail?
- After the failure of the bathroom waterproofing project to solve the specific needs of the specific analysis of targeted treatment. ??????? Bathroom waterproof is the problem more decoration works. The main reasons are: 1, construction (local, details, etc.); 2, waterproof material problems; 3, the structure (such as uneven settlement, cracking, etc.); 4, to save a little waterproof waterproof measures. ???????? After the three must be redo waterproof, the first type of reasons can be used to the appropriate remedial measures, pay the table "bathroom waterproof failure part of the phenomenon and the remedy list." ??????? Please responsible professionals in the field to carefully check the judge to find specific reasons for dealing with the need to destroy the red or must be destroyed, do not affect others after causing greater losses. The following are the same as the "
- Q:What is PE waterproof cloth and PVC tarpaulin
- The characteristics and performance index of waterproof cloth products 1. Tensile strength index: warp strength ≥ 2100N / 5CM, zonal strength ≥ 1600N / 5CM; 2. No leakage of water, water pressure ≥ 2000MM water column; 3. Low temperature, cold temperature -20 ℃; 4 Can be mildew, mildew experiment for the first level. Product Usage 1. Can be used car, train, ship cargo tarpaulin; 2. It can be used for the open storage of the harbor airport at the station terminal harbor; 3. Can be set up temporary granary and a variety of crops covered with open-air; 4. Can be used for construction site power construction site and other sites to build temporary shed, temporary warehouse materials; 5. Can be processed camping with tents and various machinery and equipment outside the jacket.
- Q:Do you use the waterproof material on the building to be harmful to the human body?
- Of course harmful, not just this particle, there are auxiliary materials are also toxic.
- Q:I would like to ask how to do in the warm water above,
- Do nothing to use, because the biggest leak to the hidden danger is to warm the water, but your waterproof design does not include the warm water, you say your waterproof layer construction, in the end how much significance. It is recommended to make the waterproof floor to warm the following, as to what kind of good is not good to say that good things, that kind of good is good.
- Q:What decoration materials, light and water, and the wall, the perfect combination of glass
- Between the glass and the wall is generally waterproof with waterproof glue, the specific steps are as follows: First, clean the surface Remove the surface of the joints of water, grease, dust and other pollutants, with a clean cloth to clean all the residue, so that the surface clean and dry. (If it is waterproof glue, the surface should be flat and clean, plastic gap to slightly curved as well.)
- Q:Developers have done waterproof, decoration house also have to do it
- Secondly, before the waterproof layer may be done in the house decoration, paving tiles or other equipment when the installation was destroyed, so that the waterproof layer is no longer a whole,
- Q:What is the difference between finished mortar and cement mortar?
- Finished mortar is good, easy to mix, is conducive to the improvement of masonry and work efficiency; cement sand waterproof, suitable for wall paste wall, wall light
- Q:Js waterproof coating without powder can brushing
- 5. Coating maintenance: JS cement-based waterproof emulsion coating construction after 24 hours after the end with a damp cloth to cover the coating or spray water to maintain the coating, usually 2-3 days; air humidity, poor ventilation of the local dry The time period may be longer, and vice versa; 6. Check the construction of JS waterproof coating (closed water test): bathroom, pool and other parts in the JS cement-based waterproof emulsion waterproof layer after dry (at least 24 hours in summer, at least 48 hours in winter) stored water for 48 hours to see the water Construction is not qualified. Light wall must do the water test. JS waterproof coating See the amount of: under normal circumstances, the amount of about 0.6-1kg / ㎡, the actual amount from the use, the use of parts, rough surface roughness, environmental factors such as the decision.
- Q:How to do waterproof bathroom, construction process is what
- Second, the construction process: 1, grass-roots treatment: grass-roots surface must be smooth and smooth, there must be no pit phenomenon may not loose, trachoma or hole exists. If the above phenomenon should be smooth and smooth after the construction, the surface must be dry, there must be a pipe at the root of the head must be wiped into a circular arc, the pipe must be strong. 2, brushing the primary treatment agent, the "Liang wall" waterproof primer at the end of uniform mixing, and then use a long brush or rubber brush scraper, scratching the waterproof material, even brush to the grass-roots level, brushing Can not be stacked and exposed white bottom, brushing the amount of each time to 0.4kg / square meters is appropriate, the first time after the full dry before brushing the second time. 点击图标下载 App
1. Manufacturer Overview |
|
---|---|
Location | Hebei, China |
Year Established | 2004 |
Annual Output Value | Above US$ 100 Million |
Main Markets | America; Europe; Asia; the middle east |
Company Certifications | ISO 9001 |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | Tianjin |
Export Percentage | 50% - 100% |
No.of Employees in Trade Department | 6 - 10 people |
Language Spoken: | English; Chinese |
b)Factory Information | |
Factory Size: | 20000 square meters |
No. of Production Lines | Above 5 |
Contract Manufacturing | OEM Service Offered; Design Service Offered |
Product Price Range |
Send your message to us
Bitumen Roofing Felt For Waterproofing
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 4000 Square Meter m²
- Supply Capability:
- 300000 Square Meter per Month m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords