HDPE Anti-skid Point Geomembrane

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Specification sheet


No.

Item

             Test Value

0.75mm

1.0 mm

1.25 mm

1.5 mm

2.0 mm

2.5 mm

3.0mm

1

Minimum Density(g/cm³)

0.939

2

Tensile Property

Strength at yield,N/mm

11

15

18

22

29

37

44

Strength at break ,N/mm

20

27

33

40

53

67

80

Elongation at yield,%

12

Elongation at break,%

700

3

Tear Resistance   N

93

125

156

187

249

311

374

4

Puncture Resistance  N

240

320

400

480

640

800

960

5

Stress Crack Resistance, hrs

300

6

Carbon Black Content, %

2.0-3.0

Carbon Black Dispersion

1  or  2

7

Standard OTI  Min

100

High Pressure OTI  Min

400

8

Impact Cold Crack at -70°C

Pass

9

Water vapor permeability

(g.cm/cm2 .s.Pa)

≤1.0×10-13

10

Dimensional Stability (%)

±2



Features

  1. Complete variety of specifications of width and thickness. Thickness: 0.08-2mm/Width: 2-16m .

  2. Excellent environmental stress resistant cracking performance.

  3. Excellent performance of chemical erosion resistance.

  4. Big scope of application temperature and long service life .

  5. Applied in landfill waste site, sewage and filth treatment site, tailings depot and underground construction project


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the materials used in the ceiling?
Kitchen bathroom ceiling material 4: sauna board     This is a dedicated wood panel for the sauna, but it can also be used in the kitchen and bathroom, generally degreased, with high temperature, not easy to deformation, health and environmental protection and other characteristics, even if there is a long time in the water Will not rot, usually painted in a layer of paint decoration, can make the overall ceiling more beautiful.
Q:What is the price of a waterproof window cover?
The benefits of window sets (1) the most important role of the window cover is to protect the role of the window. Because long-term use is easy to make the window side of the phenomenon of damage, and window cover made of wood, can play a good anti-collision protection. (2) the design of the window cover to a certain extent also played with the door sets, baseboard echoes the effect, because they are with the whole space, the common bear the role of income side. (3) window cover is the form of the windowsill match, we shop a piece of marble and the like things on the windowsill, often feel more monotonous and abrupt. Plus hood, the feeling will be more complete. Window cover style features: window cover and the door is echoes, in general, if the door is no door sets, then the window does not need window sets; the other hand, if there is no door sets and no window cover, there is a no completed The feeling that, in most cases, the requirements of the style of the window cover and the same door uniform.
Q:There is no formaldehyde in the finished putty
In addition, the addition of redispersible latex powder in the putty powder will make the putty have stronger adhesion and mechanical properties, outstanding water resistance, permeability, as well as excellent alkali resistance, abrasion resistance, and can improve water retention Sex, increase the opening time, enhance the durability.
Q:Roof for the insulation, Master roof, using two waterproof construction program
Third, security measures 1, firmly establish the "safety first, prevention first" safety production policy. Before the operation, the site management personnel must be to the operation team to carry out security technology to the end, and actively carry out pre-class security activities, security personnel check, supervise. 2, the roof around the poles outside the scaffolding (protective railings), roof construction is strictly prohibited removal. 3, roof construction, debris and other materials is strictly prohibited from the roof directly down throwing. 4, storage of coils and adhesives warehouse or site to prohibit the fireworks, for the use of fire, there must be fire prevention measures, and should set a certain number of fire extinguishers and sand bags. 5, oil drums should be flat, not two carrying, in the transport process, pay attention to balance, the spirit to focus, to prevent accidental fall caused harm. 6, transported to the roof of the material, should be scattered on average, with the use of transport, not concentrated stacking. 7, the use of torch, you should clear the surrounding flammable items, must be away from the base of oil, is strictly prohibited in the brush base oil area using the torch. Torch petrol should not be over full, cheer should not be too much, in the fire site must be equipped with fire equipment.
Q:Why should the use of high pressure perfusion waterproof plugging method
Due to uneven settlement of buildings and other factors, resulting in deformation of the building structure cracking, leakage phenomenon, for the repair of this situation, you can use a new foreign plugging construction technology - high pressure grouting waterproof repair technology.
Q:Waterproof material water leakage construction should pay attention to what
Or to local, if it is a bathroom, it should pay attention to these points: Bathroom waterproof practice: 1, ground handling Before the water treatment, must first find the ground. Leveling layer of construction methods: the base surface with gaps, cracks, unequal defects, with cement mortar repair smooth. So that the base surface must be strong, smooth, clean, dust-free, greasy, wax, release agent, and other debris material. Leveling layer before drying can be waterproof construction, construction should be fire, waterproof. After the completion of the waterproof layer, to be finished product protection, not on the move.
Q:What material waterproofing can be mixed with cement sand
Waterproof layer used in the cement label of not less than 32.5MPa, the thickness of cement mortar should be 2-3cm, the surface clean and solid without cracks; mortar leveling layer of cement should not be less than 32.5MPa, leveling layer to smooth compaction, finished product maintenance is not low In 5 days.
Q:Self-built concrete house finished three years after the use of large-scale housing wall leakage how to do?
Second, the chisel in addition to the wall structure to the wall structure for waterproof construction, you can use the material coating, membrane and infiltration of crystallization, the quality is different.
Q:Villa roof leakage what general reasons, what materials to remedy
Second, if the roof is only the original did not do waterproof, only need to remove the leaky parts of 2 ~ 3cm deep after cleaning, you use asphalt irrigation, and now there is finished asphalt coating, such as sunny day when the treatment will basically not Leaked out. If there is a waterproof layer is too much trouble, to be around a range of waterproof tick, re-do waterproof, do when the attention and the original waterproof junction to do reinforcement layer. There are many ways to deal with leak detection, or to find some professional leak-proof companies to deal with this problem.
Q:How do you make waterproofing in the kitchen and bathroom?
Kitchen and toilet to do waterproof, it is recommended to use kitchen and toilet waterproof paste, it is specifically for the kitchen and toilet water and easy to seepage yin and yang angle, pipe, sanitary ware, floor drain and other parts of the development, special materials, so waterproof Ordinary waterproof material is better, and waterproof coating construction is more convenient, only need to brush 2-3 times, the thickness of 1.2-1.5MM on it. Specific construction methods are as follows: 1, will penetrate the root, floor drain and other cracks, need to repair the site cut into "V" shape, and clean, sprinkler moist; 2, the [infiltration of crystalline repair mortar] add water (water and ash weight ratio of 1: 2 ~ 3) mixed evenly, in the early condensate before (5 minutes) to repair the construction, the root of the pipe, the floor drain, yin and yang, Should be made r angle; 3, repair mortar after the final setting, the [durable waterproof paste] powder and liquid material mixing evenly, put it aside for 3 minutes, and then stir evenly after brushing on the base surface, should be cross brush twice, and so on The first time after the dry, can be carried out the second time construction; 4, after the completion of anti-stamped, 48 hours after the closed water test.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range