Metal Roof Solar Racking System

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Metal Roof Solar Racking System is engineered for the maximum flexibility possible in designing and planning for the commercial and residential roof solar system. It is applicable to install the usual framed module to flush with the pitched roof. The special extruded aluminum rail, the tilt-in module, the clamp kit and the various roof hooks can be high pre-assembly and make the installation easy and quick to save your labor cost and time. The customized length can eliminate the weld and cut onsite to keep the high anticorrosive performance, the structure strength and the appearance.




Technical Information
Install site :Pitched Roof
Tilt Angle :Flushed with the roof (10~60 deg)
Building Height:20 m
Max Wind Speed:<60m/s
Snow Load:<1.4KN/m2
Standard :AS/NZS 1170 and other international Standard
Material :High Class Aluminum alloy Al6005-T5& Stainless steel 304
Color: Natural or Customized
Anticorrosive: anodized aluminum & stainless steel
Warranty:Ten years warranty and twenty years service life



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the solar stent system?
should be south (tracking system exception) Installation angle: equal to or close to the installation of the local latitude Load requirements: wind load, snow load, earthquake requirements Arrangement and spacing: Combined with the local sunshine conditions Quality requirements: 10 years without corrosion, 20 years of steel does not reduce, 25 years still have a certain
Q:How does the hydraulic support work
Stent used by the valve group, column, jack, are not allowed in the underground demolition inspection, the overall replacement. Replace the cylinder as far as possible before the shortest, the joints should be installed on the dust cap
Q:Fire engineering, piping, valves, stent installation of what specific requirements
Design drawings and other technical documents complete, and reported by the owners and supervision and approval. Construction plan has been approved, and made to the team at the end. Temporary facilities and water supply, power supply to meet the normal construction requirements. Related equipment has been fitted and into the scene, with construction conditions.
Q:What is the full support system
A construction method, to take a certain interval, dense erection, from the role of the scaffolding construction method. Currently common in the construction of cast-in-place bridges and cast-in-place floor construction.
Q:Easy to pave the anti-static floor bracket system?
So that the floor flatness, aesthetics, the gap has been a large degree of straightening, while the efficiency of the rapid increase of more than 50%.
Q:Fire spray installation in the anti-swing stent approach?
5 when the nominal diameter of the pipe is equal to or greater than 50mm, each section of the water main pipe or water distribution pipe should not be less than one bracket, and the anti-swing bracket should not be greater than 15m spacing; when the pipeline changes direction,
Q:Is the template and stent two or one?
Material staff, that is, the contractor to see the words in accordance with the quota on it. The template is the contact area, the stent is the building area.
Q:What is the difference between a shock support and a conventional stent?
he lack of horizontal seismic support structure; 2, seismic support hanger mainly bear the horizontal load of the pipeline
Q:How to build an effective teaching stent
Teaching design to reflect the learner as the center, it must be based on the cognitive needs of learners to design the corresponding activities. Students need knowledge of the reserves, the need for background schema activation, demand strategy skills based on the basis, otherwise learning is difficult to carry out. In other words, the teacher in the teaching design should be based on the needs of students for students to learn and develop stent.
Q:How to remove the climbing bag bracket
Climbing bag of the bracket, is a part of the carrying system, took the words, carrying a backpack will be very tired, that the role of mountaineering bag is meaningless.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range