• M38*4*600mm Hollow U head Screw Jack 150x150x50x5mm for Ringlock Scaffold CNBM System 1
  • M38*4*600mm Hollow U head Screw Jack 150x150x50x5mm for Ringlock Scaffold CNBM System 2
  • M38*4*600mm Hollow U head Screw Jack 150x150x50x5mm for Ringlock Scaffold CNBM System 3
M38*4*600mm Hollow U head Screw Jack 150x150x50x5mm for Ringlock Scaffold CNBM

M38*4*600mm Hollow U head Screw Jack 150x150x50x5mm for Ringlock Scaffold CNBM

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m.t.
Supply Capability:
30000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

  • Quick Details of M38*4*600mm Hollow U head Screw Jack 150x150x50x5mm for Ringlock Scaffold

  • Material :Q235

  • Surface treatment :Painted, Electro Galvanized, Powder Painted, H.D.G

  • Size :M30, M32, M34, M36, M38, M48

  • M38*4*600mm Hollow U head Screw Jack 150x150x50x5mm for Ringlock Scaffold CNBM

  • M38*4*600mm Hollow U head Screw Jack 150x150x50x5mm for Ringlock Scaffold CNBM

  • M38*4*600mm Hollow U head Screw Jack 150x150x50x5mm for Ringlock Scaffold CNBM



Descriptions of M38*4*600mm Hollow U head Screw Jack 150x150x50x5mm for Ringlock Scaffold

Scaffold Adjustable Screw Jack with threaded bar and Cast nut, adjustable to 600mm, designed to fit inside a Standard / Vertical pole to support the load from a standard, and which, in conjunction with a thick baseplate, is used for levelling of Scaffold purpose.


  • FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Q:Bowl buckle scaffold inspection and evaluation
(2) the focus of quality inspection of structural parts:Steel tube wall thickness, welding quality, appearance quality, adjustable base and adjustable support rod diameter, and nut with gap and material.(3) scaffold erection shall be inspected at the stage:The first 1 paragraphs to a height of 6m for the first stage (left bottom stage) the inspection and acceptance;The 2 frame should be checked regularly with the progress of the construction, to achieve a comprehensive inspection and acceptance;3 cases of more than 6 winds, heavy rain, heavy snow after the special inspection;4 shutdown for more than a month before recovery.
Q:I'm gonna be getting piercings this weekend, so i know im already getting my nose. but i want to get my ear. like barbell? so what's the difference between Scaffold and Industrial?
Nothing... The piercer will use an extra long barbell, most likely a 14 gauge.. too.
Q:What is the difference between Scaffolding and Zone of Proximal Development?
Zpd And Scaffolding
Q:Want to rent the scaffolding in the county, you need to cast how much money
Look what you want to do. Store rent is not.
Q:The role of the external scaffolding and the relevant provisions?
There are many kinds of scaffolding, there are many types of scaffolding alone. According to the use, structure, decoration scaffolding scaffolding and protective scaffolding; according to the use of materials, there are bamboo scaffolding, scaffolding, metal scaffolding; according to the structure form, there are several independent bar type, frame type, bridge, hanging, hanging, pick style etc..
Q:Where can I source scaffolding steel/aluminium planks with rubber end caps?I am having much difficultly finding anything, can you assist?Thank you in advance.
Maybe something like a window washers scafolding planks...?
Q:A scaffold is constructed by placing two supports under a 13 ft, 9 in (a) board weighing 84 lbs. The supports are each 2 ft, 8 in (b) from their respective ends. Two painters stand on the board; one weighs 158 lbs and stands 4 ft, 11 in (c) from the left end of the board. Where must the 222 lbs painter stand so that each support carries the same weight? (express your distance in feet from the right end of the board (d).)please help!! thanks(:
Total weight = 222 + 158 + 84 = 464 lb So, each support must carry 232 lbs Working in inches: Take moment about Right hand end Board is assumed to be uniform - CG is at the center (232 x 32) + (232 x 133) = (158 x 106) + ( 84 x 82.5 ) +(222 x d)7424 + 30856 = 16748 + 6930 + 222d 222d = 14602 d = 65.77 inches Distance of 222 lb painter should be 5ft 5.77inches from Right end
Q:So I had a scaffold/industrial done about 10 weeks ago, and its been infected at the top hole only for about 3/4 weeks. It has like a little bubble near the hole and sometimes its filled with pus a little bit and sometimes its not. Well I went the doctors about 2 weeks ago and he prescribed me a weeks worth of antibiotics as well as anti-septic cream. So I took the pills for a week and it was clearing up, I was also applying the cream twice a day. But then yesterday I noticed the lump has gotten a little bit bigger. I don't know what to do, should I take it out? But I really don't want to. And plus the doc said to wait up to 3 weeks and if nothings changed to go back and take it out. If I continue to use the cream, will it eventually go? Thanks :)
dw i had the lump for 6 months nd after a year it has finally healed but u have to be patient nd the other comment is right use tea tree
Q:Scaffold Piercing Aftercare?Ok, so I was looking into getting an industrial piercing. However, I am very very serious about the aftercare, and I would dread any infection or anything going wrong. So, I was wondering, what are some aftercare cleaning tecniques/methods? I already know that antibacterial soap is good, as is the H20 cleaning spray stuff. And that you are supposed to clean it twice a day. But how and when should I do this? I have school which I can clean it before I go in the morning, but I don't get back until four, and then I take a shower at night always. I know it sounds silly, but are there some tips you have? Thanks!
i love my scaffold/business piercing i do not imagine it hurts yet some human beings say it does Coast round ?25/30 - any more desirable than its a rip off. this is a soreness to heal and takes a lengthy time period! each and every time I knocked mine it swelled and went humorous. extremely stressful. Had it executed 3 cases, 1st time it grew out, second time I only took it out. third time I were given it pierced on my different ear and at the same time as it became healed I replaced it to a versatile bar and for the reason that then this is been suitable. desire I helped.
Q:Do the external wall decoration (from the top down to do) scaffolding is to wait until after the completion of the indoor and outdoor decoration before the demolition?If the first interior decoration, can make a layer of a layer of it is to remove all the work finished I mean I finished all the interior decoration, wall decoration only, then I do a wall decoration on the demolition of a layer of scaffolding, this site useful no
The relevant provisions of the demolition of the external wall scaffold:First, the removal of scaffolding before the accurate preparation work should meet the following requirements:1, should be a comprehensive inspection of the scaffold fastener connection, even wall pieces, support system, etc. are in line with the requirements of the structure;2, should be based on the results of the inspection to improve the construction organization design of the demolition order and measures, approved by the competent authorities before the implementation;3, should remove the scaffolding on the debris and ground obstacles.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords