LED Cabinet Light Series Higher Brilliant And Lower Electric Cost Than The Fluorescent Bulb
- Loading Port:
- Ningbo
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 500 pc
- Supply Capability:
- 50000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Production's Characters Description:
1.Higher brilliant and lower electric cost than the fluorescent bulb
2.No flickering and eyesight protection
3.TOP LED inside
4.TüV Rheinland CE certified
5.Europe ErP stage II grade and Energy efficiency Class A+
Part NO. | Vin | Color | PF | Pd | Flux | L |
LMP-220×25×049-01A | AC100-120V 50/60Hz | Pure White Warm White | 4W | 0.6 | P:250lm/W:220lm | 220mm |
LMP-405×25×084-01A | 6.5W | P:450lm/W:400lm | 405mm | |||
LMP-570×25×112-01A | 8.5W | P:560lm/W:530lm | 570mm | |||
LMP-220×25×049-01B | AC220-240V 50/60Hz | 4W | P:250lm/W:220lm | 220mm | ||
LMP-405×25×084-01B | 6.5W | P:450lm/W:400lm | 405mm | |||
LMP-570×25×112-01B | 8.5W | P:560lm/W:530lm | 570mm |
Application
It's widely used in home use and commercial use lighting.
Pictures
Cautions
1. Switch off the power before replacing the lamp.
2. Keep away from direct sunshine and high temperature.
3. Indoor use only, only when the IP class is over IP65.
4. If any doubt about the installation or use of this product, consult a competent electrician.
Trade Terms
1.Payment: by T/T , Paypal or Western Union
2. Lead time: 5-15 days, subject to the order quantity.
3. Delivery ways: DHL, EMS, UPS, TNT door to door service, by sea, by air, etc
4. MOQ:500pcs
5. Discounts are offered based on order quantities
Quantuty
Quality goal:Constant innovation to meet the request of the customers. Protect the environment, provide environmental products to customer.
Quality strategy:
Quality: established high efficiency quality manager system in line with ISO9001 and ISO/TS16949.
Improvement: keeping improvement & quality guarantee.
Efficiency: delivery on time, complete the agreed events with the customers on time.
Service: focus on customers, provide the service and technology support on time.
FAQ
1. How long will my inquiry get response?
Your inquiry related to our products or prices will be replied within 24 hours.
2. Can I get professional service and suggestion?
Well-trained and experienced staffs to answer all your questions in fluent English.
3. Do you accept OEM or customized design?
OEM & ODM, any your customized lightings we can help you to design and put into product.
4. What if I need specific design?
Distributorship are offered for your unique design and some our current models.
- Q:A set of lamps and lanterns
- There's a lot to see how you get hungry, the prices are different,
- Q:Homemade studio, what's the light? What light tube, cold light, warm light
- The lighting of the studio must be cold, not hot. Lighting can according to your cost budget, if the budget is generally can consider to use tricolor cold light lamp, LED lamps and lanterns can be used if the budget are high. Because you will need to photography, this is so light to adopt professional lamps and lanterns, lamp should also be taken with a standard for color temperature of bulb, generally it is to use 3200 k color temperature of bulb, philips and osram can choose.
- Q:What does philips mean by TLD36w / 54-765
- A TLD is a straight tube Is the power for 36 w The lamp tube of common halogen powder, less than half the price of the three base color lamp tube. 765:7 stands for the color index, 65 for color, 6500K
- Q:What happens when daylight lights go on
- Fluorescent lamp is made of daylight lamp, ballast, consisting of the starter, under normal circumstances fluorescent lamp in the process of start, due to the action of bimetallic strip within the starter, make a sound, "da" start fluorescent work light. The sound is usually the "buzz..." when it's on. Current sound, the sound is due to the ballast assembly is not tight, leaching asphalt technology is bad internal noise caused by loose of silicon steel sheet, and some small factory's products to reduce costs is omitted asphalt link, appear easily in the use of sound.
- Q:Leds are the ones that are brightest
- The full permeability of all plastic tube tubes can reach more than 90% or even 95%. And it has a large luminescent surface of half plastic.
- Q:Excuse me, the lamp in the sitting room lamp is carried good or the lamp tube is good
- Lamp band light is uniform. Lamp tube is broken and can be replaced. Lamp band must be changed. Direct selection
- Q:I have LED lights on the fluorescent lamp, and I tested it when I was running five times a dc, and four LED lights were very bright and hot,
- No good. 220v is a valid value. The maximum value is 310v, and it burns instantly.I hope my answer will help you.
- Q:What is the connection of the LEDT5 lamp tube, the main line is how to connect, only to the end
- You look at the instruction manual, this kind of lamp does not lead to ground line, see if can adjust brightness? Or the color palette? But such a small lamp is almost impossible to implement, or the yellow line is simply suspended, and the usual ground line is the outer shell of a metal shell
- Q:20wled bulbs are more energy-efficient than 20w fluorescent bulbs
- Power electricity consumption is same (same as 10 jins of cotton and 10 jins iron who weigh the same - they are different size). The LED light and fluorescent lamp is different of different life! Also look at the type of LED lights (some brightness nights are bad) don't let vendors and manufacturers cheat!
- Q:What kind of lamp tube is the 2G11 lamp of LED fluorescent lamp
- It is mainly used in the Japanese market, at home, like in the living room lamp of the home is this kind of four needle tube, some people also call it the H tube. Now, LED2G11 is conventionally available in four sizes, all of which can be replaced by traditional H pipes
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
LED Cabinet Light Series Higher Brilliant And Lower Electric Cost Than The Fluorescent Bulb
- Loading Port:
- Ningbo
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 500 pc
- Supply Capability:
- 50000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords