Glass Block (New Moon - EN1051)

Ref Price:
Loading Port:
China Main Port
Payment Terms:
Min Order Qty:
Supply Capability:

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Additional Info:
  • Packing:cartons

  • Standard:en1051-1

  • Origin:china

  • HS Code:70169090

  • Production Capacity:36 MILLION PCS PER YEAR

Product Description

We are the biggest glass blocks supplier in the world, our products quality control system have passed ISO9001, 14000, 28001, EN1051, SGS certified. Our base products GLASS BLOCKS have been sold all over the world.

The glass blocks we can produce and suply:
Clear glass blocks of 190X190X80mm
Blue/green/pink/brown of 190X190X80mm
Clear glass block of 240X115X80mm
Clear glass block of 240x240x80mm
Clear glass block of 190X190X95mm
Clear glass block of 145x145x95mm

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Agc glass and Fuyao glass which is good
Asahi Glass: English full name Asahi Glass, is a subsidiary of Japan's Mitsubishi. AGC Group is a more than 20 countries in the world with more than 350 branches, with more than 56,000 employees of multinational companies.
Q:How long is the test report of the building material? Is there a corresponding national document?
Valid to see the customer's request. The general validity period is one year. No corresponding national documents are valid for a long period of time. Building materials testing: This book is with the enterprise, based on the work process of curriculum development and design, to professional activities as the guide, to the ability as the goal, the project prepared for the carrier. Through this book study, you can be familiar with the basic properties of commonly used building materials and technical requirements, at the same time with the building materials testing pilot, witness the quality of the sampling staff and job skills. The contents of the book include: the basic knowledge of building materials and testing, sand and stone technical indicators detection, the main technical indicators of cement testing, concrete admixtures and admixture performance testing, ordinary concrete performance testing, building mortar performance testing, block material quality testing, Steel and steel welding pieces of technical performance testing, waterproof material performance testing, architectural glass technical indicators and testing, construction gypsum products technical requirements and testing, architectural coatings performance testing, a total of 12 projects, using the current standards, norms, Contact practical, simple and practical. Each project has a summary and self-test exercises to help students consolidate their learning outcomes. This book is for vocational colleges construction engineering technology, engineering cost, civil engineering testing technology and civil engineering related materials for teaching materials, but also as engineering and technical personnel, building materials testing job skills training materials or reference books.
Q:Ps can make the effect of architectural glass?
No. Can be done like a bit like a barely
Q:Building glass curtain wall to do the information about how much money
With the size of the curtain wall area of the amount of work, everyone talk about the price, no uniform price, reasonable on the line. Small items do not package materials inspection fees, also three thousand five thousand dollars, large projects million blocks, tens of thousands of pieces are normal. If the duration is too long, the cost has to increase.
Q:In addition to the service industry, what other work?
It depends on what you will be
Q:How to repair the architectural glass scratches
There is no equipment tools can repair the scratches of architectural glass, can only be replaced
Q:To a friend to say that under the sound of the glass how to choose it?
Laminated glass: laminated glass laminated glass structure is a safe glass production process, also known as laminated glass, can be two layers together, it can be multi-layer together. Some laminated glass sun will dry for a long time later, this is because the use of wet folder method, so used in architectural glass laminated glass are generally used dry folder method, so you can avoid sandwich.
Q:What is the main part of the safety glass used in the building?
The location of the building requires the use of safety glass: "Regulations for the management of glass for building safety" (as of January 1, 2004) enumerated the use of safety glass in the following parts where the building requires glass as a building material. (A) 7 and 7 above the building outside the window. (B) a window glass or glass bottom (area) larger than 1.5 m2 (the glass is assembled in the frame, the light transmission part of the glass and the glass installation material covered by the opaque part of the line) from the final decoration surface less than 500mm floor window. (3) curtain wall (except for the whole glass screen). (D) tilt the installation window, all kinds of ceiling (including skylights, lighting roof), ceiling. (5) sightseeing elevator and its outer Wai Wai. (6) indoor partition, the screen. (7) Stairs, balconies, platform corridors and midday guardrail panels. (8) Floor panels used to withstand pedestrian walking. (9) the entrance of the public building, foyer and other parts (including 1, door glass 2, installed in the door above the glass 3, installed on both sides of the door glass, close to the door opening of the vertical side and the door opening distance is less than 300mm). (10) vulnerable to impact, the impact of other parts of the body caused by injury
Q:Is there a good way to remove the heated glass cover from the furnace?
In the kitchen glass lid heating process, it is necessary to remove the heated glass cover from the heating furnace and transfer it to the conveyor belt in the specified direction for subsequent process. At present, relying on manual operation, due to the high temperature radiation production conditions, the need for a staff of four people, in the three consecutive production needs of a staff of 12 people, the cost of high cost, and the working environment for workers is not good, so decided to improve production equipment, Development of automated transshipment systems In the process of heating forming, the glass cover is transferred from the heating furnace to the automated production system of the conveyor belt.
Q:Sound insulation glass how much money a square
According to the level of external noise, using our different sound insulation glass combination program, the general indoor can achieve the highest national quiet standard (0 level noise standard). In a large number of practical installation and application process, different degrees of outdoor noise by our professional staff of the measurement, analysis, judgment, using the most appropriate combination of sound insulation solutions, can reach 40 dB below, and some areas can even reach 30- 33 dB, the villa's basement is generally 28-32 dB.

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range