Ultra white hollow glass

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
200000㎡ m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

we introduced the advanced production lines (with automatic coating removing, automatic sealing system) and equipped with reverse osmosis deionized water preparation and storage equipment, automatic aluminum spacer bending equipment, low-e glass coating removing equipment, which is able to produce all kinds of specifications of insulating glass for customers. The production lines that are equipped with automatic vertical sealing system, abandon the disadvantages of traditional horizontal sealing (there will be no patch phenomenon), make the processed insulating glass more flat and smooth..

Insulating glass size specifications:

Maximum processing size: 2440 mm * 3500mm

Minimum processing size: 200 mm * 200 mm

Aluminum spacer specifics: 6 mm, 9 mm, 12 mm, 16 mm

Glass thickness: 3 mm to 19 mm


Insulating Glazing

A.  All glass can be processed before assembly




B.  Glass transfer onto the glass loading machine



C. Edge coating removing of coated glass


D.  Wash and clean strictly


E.  Automatic bending for air spacer


F.  Automatic molecular sieve filling

G. Automatic butyl rubber applying



H. Automatic framing


K. Automatic scanning positioning

L.  Automatic double sealing

M. Transfer by sucking disc


N. Conner finishing

O.  Glass on the shelves till solidification



P. Customized wooden cases according to the size of glass

Q. Transfer the glass into the specific wooden cases

R. Leading Time:10 days for an average area of 1000 square

   meters tempered glass

S. Trade terms: FOB and CIF.

T. Payment Terms: By TT, 30% deposit to start producing,

  full amount balance paid before delivery.

U. The container loading after the package checking


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Is nano-glass insulated paint a lie?
It was mentioned on behalf of the effect of more understanding of nano-materials nano-glass coating insulation I personally think that may
Q:The visible light transmittance of the glass is not good or good.
Sunrise little place where the transparent high point is better, mainly to see where your glass is used
Q:I want to build a glass furnace, how do I proceed?
Safely isolating the temperatures you will need to melt glass and maintain a molten 'puddle', is not a high-school level DIY project. You will be working above the temperature range of most commonly available heating elements and controls, and would need to design refractory elements to limit case temperatures to a safe level. This is not something to try to 'eyeball engineer'. FYI: Even small pieces made from molten glass can contain dangerous levels of hidden stress.
Q:Curtains can not pull the first ten centimeters, glass cover, what way to cover
Plus a curtain so just can block the live
Q:Building glass specification is that set?
(JGJ 113-2009), "Construction Safety Glass Management Regulations" (Development and Reform Commission [2003] No. 2116), "Specification for Design, Construction and Acceptance of Aluminum Alloy Doors and Windows", "Regulations for the Application of Building Glass" (JGJ 113-2009) (DBJ15-30-2002).
Q:Is there a standard for frosted glass in the bathroom?
1. Safety glass shall be used and the thickness shall meet the requirements of Table 7.1.1-1 and 7.2.4 of 7.1 of JGJ113-2009; 2. Recommended by the professional design and installation.
Q:How to build a glass water wall?
There are so many different types. It would depend on what type of fall you are looking for. Please add details.
Q:Through the glass after the sun came in with the glass can not be compared to those who will be the skin of the sun more black ah?
Ordinary architectural glass generally can block 10% to 90% of the sun in the sun. So, across the glass sun, the skin should not be easy to black.
Q:GB / T16589 instead of which specification
GB / T 28887-2017 Plastic window for construction is the first edition, so there is no substitute for other older versions. The specification refers to: GB / T 2680-1994 Building glass visible light transmittance, direct sunlight transmittance, solar total transmittance, UV transmittance and the determination of the relevant window parameters, GB / T 5823-2008 Building doors and windows terms, GB / T 7106-2008 Building exterior window windows airtight, watertight, wind pressure performance classification and testing methods, GB / T 8484-2008 building outside doors and windows insulation performance classification and testing methods, GB / T 8485-2008 building windows and doors air sound insulation (PVC-U) profiles, GB / T 11793-2008 Non-plasticized polyvinyl chloride (PVC-U) plastic doors and windows, mechanical properties, GB / T, And GB / T 11976-2002 GB / T 14436-1993 General rules for industrial product assurance documents, GB 50009 - 2001 (2006) JGJ / T 151-2008 Technical code for the application of architectural glass, JGJ / T 151-2008 Code for thermal calculation of glass curtain wall for building windows and doors, GB Building doors and windows.
Q:Architectural glass film is generally used to brand which is more ah
According to the actual situation of the correct choice of architectural glass film, OKorder Chang Bao construction staff engaged in architectural glass film for several years, very good

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range