Construction Ringlock Scaffolding Items/Components with En12810 Standard CNBM

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m.t.
Supply Capability:
30000 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

  • Quick Details of Construction Ringlock Scaffolding Items/Components with En12810 Standard

  • Type:High Building

  • Material:Steel

  • Lapping Form:Full Scaffolding

  • Framework:Combined Scaffolding

  • Supporting Mode:Wall Hanging Scaffolding

  • Erection Position:External Scaffolding

  • Scaffolding Part Type:Scaffolding Platform

  • Move Method:Horizontal mobile Scaffolding

  • Structural Style:Tower Scaffolding

  • Surface Treatment:Hot DIP Galvanized, Galvanized, DIP Painted

  • Certificate:En12810, SGS Test Report for Loading Capacity

  • Color:Silver, Dark Red, Orange

  • Production Capability:100 Tons Per Week

  • Delivery Time:About 20-30 Days After Confirmation

  • Export Markets:Global

  • Construction Ringlock Scaffolding Items/Components with En12810 Standard CNBM

  • Construction Ringlock Scaffolding Items/Components with En12810 Standard CNBM


  • Construction Ringlock Scaffolding Items/Components with En12810 Standard CNBM

  • Descriptions of Construction Ringlock Scaffolding Items/Components with En12810 Standard

  • 1. Standard:
        3000mm, 2500mm, 2000mm, 1500mm, 1000mm, 500mm.
    2. Ledger:
        3000mm, 2000mm, 1780mm, 1500mm, 1000mm, 500mm.
    3. Diagonal brace:
        3000x2000mm, 1780x2000mm, 1000x1500mm, 1000x2000mm, 1500x2000mm.
    4. Tube specification:
        Φ 48.3x4.0mm, φ 48.0 x3.25mm, φ 48.0 x3.0mm.
    5. Surface Finish:
        Hot DIP Galv. Electric Galv.Powder coating, Dip Painting.
    6. Material:
        Q235, Q345
    7. Certificate: 
        EN12810,SGS test report for loading capacity.

The Parts of Construction Ringlock Scaffolding Items/Components with En12810 Standard

Ringlock System Main Parts
Item NO.Description MaterialFinish
1StandardQ345/Q235HDG
2LedgerQ345/Q235HDG
3BraceQ345/Q235HDG
4Base CollarQ235HDG
5Base JackQ235HDG/EP
6U-HeadQ235HDG/EP
7PlankQ235/Q195HDG
8StairQ235HDG
Stair GuardrailQ235HDG
9LadderQ235HDG
Ladder BracketQ235HDG


  • FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Fastener type steel pipe scaffold composed of components
Rotating fasteners, connecting rods, pedals (steel pedals, bamboo pedals can be), the extension of the extension of the galvanized steel pedal easy to use
Q:Scaffold climbing law?
OSHA says that you need guardrails, safety nets or a fall-arrest system if you're working or walking near an unprotected surface more than 6' above a lower level.
Q:How is Hester changed by the 7 years which elapse before her final stand on the scaffold?
you can see how weak morally dimmesdale is, because he keeps his hand over his heart all the time, and is constantly beating himself up over his crime. he whips himself in the closet, and brands himself with a scarlett a to match hesters. hester... when she first walks out on the scaffold she can be seen as defiant, as if she isn't ashamed of the embellished letter a she wears. the cottage she lives in is on the edge of the town, bordering the forest. towards the end of the 7 years, her actions can be seen as repent maybe for her crime: she is a self ordained sister of mercy, helps the poor and homeless, sews... and the a turns from adultery to able
Q:how do i get rid of the lumps on my ear because of my scaffolding?
It recommends tea tree oil, or vitamin E oil applied directly to the area.
Q:Specification for construction steel pipe scaffolding and construction safety rules?
Construction preparation1, materialThe steel pipe diameter is 48 or 51mm, wall thickness is 3 ~ 3 5mm or hot-rolled seamless pipe joints, used as the main column, a large bar, a small bar, inclined support.The connecting member: rotary buckle, square buckle, buckle, docking barge core.The base made of phi 40 steel tubes and 4 ~ 5mm steel, used for main column stepping. The floor area of the base should not be less than 200C.
Q:Can anyone give me a detailed design of a simple scaffolding?
can't draw here, but it's just an x with a flat board on top in 3 dimensions.
Q:How to make a slide using scaffolding?
Why would you even consider something like that? Obviously you kids and your family use this pool, why put them at risk making a temporary slide with scaffolding. Not a good idea.
Q:looking for a scaffolding job in dubai can anyone help?
Hi okorder.com, we are Dubai based scaffolding contractor.
Q:What does scaffold one's days mean? kill time?
In 60 years of using English in Britain I have not come across that expression, so it is probably rare. Scaffolding is put up to help build or repair tall buildings, so possibly that expression means 'to do something useful with one's time.' But a scaffold is also, historically, a place of execution (legal killing of prisoner), so the expression could mean indeed 'wasting time'. I have a faint feeling that 'scaffold one's days' was written by a non-native speaker of British English. It may be more common in the USA.
Q:How to set up the temporary structure of the external structure of the balcony on the two structure
Earthwork:The pile cap is shallow, the foundation beam and sand filling quantity is less, the depth is to the outdoor floor 1.5m, so the earthwork construction adopts the mechanical leveling site construction scheme. Backfill soil must be layered compaction, density of not less than 0.9. Construction lap should be compact, interval time should not be too long, in case of rain water, the construction of various types of pipe should be synchronized with the foundation construction.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range