• Construction Platform Andaime Multidirecional with En12810 Standard CNBM System 1
  • Construction Platform Andaime Multidirecional with En12810 Standard CNBM System 2
  • Construction Platform Andaime Multidirecional with En12810 Standard CNBM System 3
Construction Platform Andaime Multidirecional with En12810 Standard CNBM

Construction Platform Andaime Multidirecional with En12810 Standard CNBM

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m.t.
Supply Capability:
30000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

  • Quick Details of Construction Platform Andaime Multidirecional with En12810 Standard 

  • Type:High Building

  • Material:Steel

  • Lapping Form:Full Scaffolding

  • Framework:Combined Scaffolding

  • Supporting Mode:Wall Hanging Scaffolding

  • Erection Position:External Scaffolding

  • Scaffolding Part Type:Scaffolding Platform

  • Move Method:Horizontal mobile Scaffolding

  • Structural Style:Tower Scaffolding

  • Surface Treatment:Hot DIP Galvanized, Galvanized, DIP Painted

  • Certificate:En12810, SGS Test Report for Loading Capacity

  • Color:Silver, Dark Red, Orange

  • Production Capability:100 Tons Per Week

  • Delivery Time:About 20-30 Days After Confirmation

  • Export Markets:Global

  • Construction Platform Andaime Multidirecional with En12810 Standard CNBM

  • Construction Platform Andaime Multidirecional with En12810 Standard CNBM

  • Construction Platform Andaime Multidirecional with En12810 Standard CNBM


  • Descriptions of Construction Platform Andaime Multidirecional with En12810 Standard 

  • 1. Standard:
        3000mm, 2500mm, 2000mm, 1500mm, 1000mm, 500mm.
    2. Ledger:
        3000mm, 2000mm, 1780mm, 1500mm, 1000mm, 500mm.
    3. Diagonal brace:
        3000x2000mm, 1780x2000mm, 1000x1500mm, 1000x2000mm, 1500x2000mm.
    4. Tube specification:
        Φ 48.3x4.0mm, φ 48.0 x3.25mm, φ 48.0 x3.0mm.
    5. Surface Finish:
        Hot DIP Galv. Electric Galv.Powder coating, Dip Painting.
    6. Material:
        Q235, Q345
    7. Certificate: 
        EN12810,SGS test report for loading capacity.

The Parts of Construction Platform Andaime Multidirecional with En12810 Standard 

Ringlock System Main Parts
Item NO.Description MaterialFinish
1StandardQ345/Q235HDG
2LedgerQ345/Q235HDG
3BraceQ345/Q235HDG
4Base CollarQ235HDG
5Base JackQ235HDG/EP
6U-HeadQ235HDG/EP
7PlankQ235/Q195HDG
8StairQ235HDG
Stair GuardrailQ235HDG
9LadderQ235HDG
Ladder BracketQ235HDG


  • FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Q:Cantilever scaffold technical disclosure Find satisfaction free speed!!!
Fastener:(1) new fasteners shall have production licenses, product quality certificates and inspection reports. Old fasteners should be used before the quality inspection, there are cracks, deformation is strictly prohibited, the use of bolts must be replaced sliding silk. New and old fasteners should be anti rust treatment. Corrosion of fasteners and damaged fasteners timely repair replacement bolts. Bolt oil support easy to use.(2) the fastener and the joint surface of the steel pipe should be in good contact with the steel pipe, and the minimum distance of the opening should be less than 5mm. The fastener in the bolt was 65N.m, shall not be damaged.
Q:Who has external scaffolding construction program
1.1.2 fastener1 steel tubular scaffold made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; the fastener made by other materials used, test show that the quality meets the standard requirements before use.2 fastener used in the scaffold, bolt tightening torque up to 6.5N.M, shall not be damaged.1.1.3 foot plateThe scaffold made of bamboo or bamboo bamboo string plate, each quality should not be greater than 30kg.1.1.4 wall partsThe material of the wall parts shall be in accordance with the provisions of the current national standard "Q235-A" (GB/T700).1.2 inspection of qualified parts should be classified according to the varieties, specifications, stacked neatly, smooth, stacking sites may not have water.1.3 should be cleared to set up the site debris, flat set up the site, and make water flow.1.4 when the foundation of the scaffold has equipment foundation, pipe trench, the scaffolding should not be used in the process of excavation, otherwise it is necessary to take reinforcement measures.
Q:Calculation method of complete scaffold
The most distant light is closer to us than the nearest darkness:Distance is usually just a myth
Q:Where to use scaffolding in construction
1, set up a high-level scaffolding, the various materials used must meet the quality requirements.2, the foundation must be firm, before the erection of the calculation, to meet the load requirements, and according to the construction code set up, do drainage measures.3, scaffolding erection technical requirements shall comply with the relevant provisions of the code.4, we must attach great importance to a variety of structural measures: scissors, pull nodes, etc. should be set according to requirements.
Q:..or anytime around whenThe Scarlet Letter was written.I am doing a paper on why the three scenes at the scaffold were so significant.So I decided to include the history of scaffolds, but I can't seem to find any information on them.help please? :]SOURCES..if possible! :]
Execution by hanging.
Q:How to calculate the fastener type steel pipe scaffold
The provisions of 1.1.4 in steel pipe scaffold structure thin-walled steel structure design, involved in the weld connection, the stability coefficient of the axial compression members, should use the "technical specification for Cold-Formed Steel Structures" (GBJ18-87).1.1.5 provides for the design and calculation of scaffolding:(1) the calculation of the overall stability of the frame (can be converted into the calculation of the stability of the opposite pole);(2) checking the strength, stability and stiffness of horizontal bar;(3) calculation of strength and stability of attached and continuous wall;(4) anti overturning checking;(5) checking of foundation and supporting structure.
Q:Scaffolding installation and precautions?
When the structural layer is attached to the wall, the wall column, the vertical horizontal rod and the transverse horizontal rod are set up immediately after the erection of the structure.5, closed with a step horizontal bar frame must turn around the hands all around the circle, with a right angle fastener and the inner and outer post fixed.6, the horizontal horizontal pole of the double row scaffold should not be greater than 100mm from the wall to the wall.7, when the scaffolding operation of the wall of the two steps, should take temporary stability measures, even after the wall pieces can be removed before the erection.
Q:What are the dangers of scaffolding
(5) the improper operation of the accident collision accident, etc.)Analysis of the main reasons two accidents:1) whole frame dumping, vertical collapse or local collapse frameStructural defects: the structure of the lack of the necessary structural members, not in accordance with the provisions of the number and requirements of the erection of the wall, etc.;In the process of using the arbitrary demolition essential bars and even wall pieces etc.;
Q:What is the bowl buckle scaffolding, bowl buckle scaffold what are the characteristics
Specification and application of bowl buckle scaffold pole fittingsBowl buckle type steel pipe scaffolding rod parts can be divided into its main components, auxiliary components, special components three
Q:In the calculation of the bearing capacity of the scaffold, what is the axial force produced by the "N g2k" - the standard value of the component?The calculation formula for force rod scaffold N/ psi A+Mw/W = fWhere N=1.2 (Ng1k+Ng2k) +0.85*1.4 Sigma NqkThe specification of N g2k is explained in terms of the axial force generated by the standard values of the component fitting,It is how to understand, specifically refers to what? That is to say, what is the standard value of the component?Please master all trouble, thank you generous with your criticism!
Is to produce weight between each vertical rod scaffolding force

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords