• construction hoist / builder's hoist/building hoist/SC320/320-1 System 1
construction hoist / builder's hoist/building hoist/SC320/320-1

construction hoist / builder's hoist/building hoist/SC320/320-1

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing


CMAX BUILDING HOIST SC320/320


DOUBLE CAGES

MAX LOADING CAPACITY= 2X3.2 T

CAGE SIZE= 3X1.3X2.5 M

MOTOR POWER= 2X3X22KW

MAST SECTION SIZE= 650X650X1508 MM

MAST SECTION & ATTACHED FRAME

TYPE OF SAFETY DEVICE: SAJ50-1.2    ADOPT  HOT GALVANIZING PROCESSING

WITH OVERLOAD LIMITER & ALARM SYSTEM


Q:Construction site construction elevator and tower crane, which unit security check and acceptance?
Inspection by the quality supervision bureau special equipment inspection department.
Q:What is the main function of elevator motherboard?
It's collecting the peripheral signals and testing and assigning the output instructions,
Q:For example, what records do you want to have a third party monitoring?
After the construction elevator overhaul, the contents of the inspection and acceptance inspection shall be inspected; In the use of elevators, the contents of the regular inspection shall be conducted once a year in accordance with the provisions of the regulations.
Q:Is the construction elevator a special equipment
The construction elevator is special equipment, the installation and demolition of the special construction plan, after the installation, the special equipment can be tested and qualified for use
Q:How do construction suspension scaffolding be handled in the people's elevator?
The shelf of the discharge platform is separated from the outer scaffolding and set up separately! Can't connect together
Q:Whether the construction elevator is a dual-purpose elevator
Very simple check, the construction elevator is in the construction site, not completely closed, and the human cargo is used commonly in the mall and the factory, is completely closed.
Q:How is the construction elevator installed
Construction elevator installation 1) the location of the elevator depends on the condition of the site and the equipment, so as far as possible, stay away from the overhead line and keep the safe distance specified. When the elevator is running, there is a lot of danger and should be avoided. 2) the order of installation is: 3) place the chassis on the base and the base pre-buried bolt, and the platform is placed on the chassis, and the basket is placed in the middle of the chassis. 4) to install the standard section, each installation of two standard sections (usually less than 8m) to be temporarily fixed. The wire rope shall be used for the use of the temporary cable, and the joints and supporting points shall be bolted and not tied with the lead wire. 5) the installation should alternate between the two columns. Node bolt specification must according to the aperture matching, not packing, found that the aperture position at the time, can not arbitrarily expanding, more can't to lead wire bundle, instead to avoid loose node deformation. 6) when installing the standard section, pay attention to the vertical degree of the guide, and the line of the guide line should not appear in the line of folding and too big clearance to prevent the collision from running. 7) when construction site conditions permit, it can be assembled on the ground and then hoisted on the whole to reduce the height of the work. Due to the design of the frame, the stress condition of the construction is only considered, so before the whole moving up, the counter can be temporarily strengthened to enhance the bending capacity of the nodes.
Q:The tower crane is on a surface with the construction elevator, and only 2 or 3 meters away. Is that allowed
Congratulations, it's a tragedy when you want to start the tower
Q:How many floors are built to use the construction elevator? With six floors?
The construction elevator, the average layer height above 12 floors need to be used, the hoist machine is not to go up to use the construction elevator to send a person to carry a few light things upstairs.
Q:How much cable does the construction elevator 44KVA need?
44 kva should choose 16 + 2 * 3 * 6 square cable, 16 of the 30 ℃ safe carrying capacity is 78 a cable Current I = P/U / 1.732 = 44000/380/1.732 is approximately 67A The construction elevator will not only carry the engineering materials but also the higher frequency, the load calculation will be calculated according to the continuous working system. The cable should be used for the YGTZ special cable.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords