SC Rack and Pinion Building Hoist

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
1 Set set
Supply Capability:
50 Sets per Month set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Brief Introduction of New Design Sc Rack And Pinion Building Hoist

The SC series of construction elevators are widely used at the sites of industrial and civil construction, bridge construction, underground

construction, large chimney construction, ship industry and so on. Being suitable for the vertical transport of materials and people, they can

 also be used as permanent / semi-permanent electric elevators and in various sites like warehouses and high towers.

This series of construction elevators, which are known for their stable performance, reliable safety, easy transportation and strong adaptability,can enhance work efficiency and reduce workers’ labor intensity.

 

Eight selling point of New Design Sc Rack And Pinion Building Hoist    

 

Control monitor unit

Weight limit device

Fall protection device

Microcomputer speed device

GPS fixing system

Floor select system

Floor call system

Floor stop protection device     

 

Note:

The wall frame will be exist over the 24m,and there is one wall frame each 6-8m.The height is 50m,there will be have 4 wall frames..

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Construction site construction elevator and tower crane, which unit security check and acceptance?
Different but most likely is the construction elevator
Q:Safety device for construction elevator
Many 1, 2, upper and lower limit for safety device 3 TDD, extreme limit 4, buffer spring 5, has threshold position switch, single threshold position switch 7, 6 top and limit switch 8 TDD, enclosure door lock 9, lock line 10, has locks There are a lot of electrical safety protection
Q:The construction elevator relies on what to carry heavy, static hour force point where
Driven by two or three worm gear reducers, the ladder cage is a load bearing unit, and gravity is carried by a rack. At rest, the force point is in the meshing of the gear and rack.
Q:The safety officer shall be responsible for the work of the construction elevator
Certificate of factory, whether the elevator is inspected by the competent authority, the operator has the evidence. Conduct safety techniques for operators.
Q:How does the driver of the construction elevator do the search for a sudden power failure
There are clear rules for the safety of construction machinery (JGJ33-2001). 6.12.17 when the elevator is running in an existing abnormal condition, it should stop immediately and take effective measures to reduce the cage down to the ground level, and keep running after the failure. When the electric is out of control in operation, the stop button should be pressed immediately. The stop button is not allowed until the failure is ruled out. 6.12.20 when elevator in the operation of the midway stop due to power outages or other reasons, can be manually, the end of a motor brake electromagnet manual release slowly shake handshandle pull outward, slowly slide down the ladder cage, ladder cage fall shall not exceed the rated speed, manually drop must be conducted by professional maintenance personnel manipulation.
Q:How much cable does the construction elevator 44KVA need?
44 kva? What elevator, convert the high piezoelectric 44kva to power 35.2 KW, current 80A16 square cable
Q:Where is the location of the elevator in the project
Hard to answer, I think should combine the construction plan, adjacent to roadway facilitate material transport, and combining with the construction progress, do not put in sample area, in addition to combined with the construction interface classification and so on into consideration, to say.
Q:How long does the construction elevator do a crash test
Construction lifter before put into use, must pass a drop test, using every three months should do a drop test, to adjust for safety device, braking distance will be falling not more than 1.2 m, after test and normal operation of every happening for action, must be to reset the attached safety device. The adjustment, repair, or identification of the anti-falling safety device shall be carried out by the manufacturer or designated authorized unit, which shall be operated by the professional at the time of the crash test. General can at the local special equipment inspection institutions detection, can also be tested in other qualified enterprises, such as: wuhan science, Shanghai special survey, qufu golden horse machinery testing!
Q:What is the main function of the construction elevator safety guard
Falling to a certain speed will automatically card death
Q:How many years does the construction elevator usually use?
More than eight years will not give you the advice to get the factory refurbished
We insist in science and technology innovation, occupying markets with innovations, super quality and absolute faith. Our running principle is that quality comes first, customers come first, and reputation comes first. We face with friends and clients all over the world sincerely. To provide satisfied productions and services is our eternal pursuit and promise.

1. Manufacturer Overview

Location Beijing,China
Year Established 2003
Annual Output Value
Main Markets 15.00% Eastern Europe
15.00% South America
10.00% Mid East
10.00% Western Europe
10.00% North America
5.00% Oceania
5.00% Eastern Asia
5.00% Central America
5.00% Southeast Asia
5.00% Northern Europe
5.00% Southern Europe
5.00% South Asia
5.00% Africa
Company Certifications ISO9001:2000;CE

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port 11-20 People
Export Percentage 21% - 30%
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size: 10,000-30,000 square meters
No. of Production Lines 5
Contract Manufacturing
Product Price Range