SC 100/100 Building Hoist in China

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
1 Set set
Supply Capability:
100 Sets per Year set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Detailed Product Description of China SC 100/100 Building Hoist

 

1Rated load:1000/1000kg

 

2lift passenger:12/12

 

3lift speed:0~36m/min

 

4without counter weight

 

Specification of  of China SC 100/100 Building Hoist

 

Model

SC100

SC100/100

SC200/200

Height (m)

12

12

50

Rated Loading Capacity (kg)

1000

1000/1000

2000/2000

Rated Lifting Speed (m/min)

36

36

36

Rated Passenger Number

12

12/12

24/24

Motor Power (kw)

2*11

2*2*11

2*3*11

Inner Dimension of Cage (m)

3*1.3*2.5

3*1.5*2.5

3*1.5*2.5

Cage Weight (kg)

1400

1400

1400

Mast Section Weight (kg)

163

163

163

Mast Section Dimension (mm)

650*650*1508

650*650*1508

650*650*1508

Rated Hanger Lifting Capacity (kg)

180

180

180

Bottom Outline Dimension (mm)

3100*4200

3100*4200

3100*4200

Numbers of Containers Needed for Shipment

One 20GP

One 40HQ

One 40HQ+One 20GP

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:The calculation of the use of electricity in the construction elevator
Try using the security software. There is a cracked version
Q:The maximum allowable deviation of the vertical is the vertical degree when the construction elevator is installed
The maximum allowable deviation for the installation of the elevator rail frame is the following: The height of the elevator rail is less than 70 meters, and the vertical deviation should not be greater than one thousandth of the height of the guide frame. 2, the guide frame height is greater than 70 meters is less than or equal to 100 meters, the deviation is less than or equal to 70 mm. 3, the guide frame is larger than 100 meters is less than 150 meters, the deviation is less than or equal to 90 mm. 4, the guide frame is larger than 150 meters is less than or equal to 200 meters. The deviation is less than or equal to 110 mm. The guide frame is greater than 200 meters and the deviation is less than 130 mm.
Q:The construction elevator can only go up can't come down what happened
Does the motor have electricity when it falls? Look at the switch and the line first, then check the controller.
Q:Safety device for construction elevator
When the cage is in an emergency for various reasons during the operation, the driver can press the stop switch at any time, making the cage stop running. The fast stop must be a non-self-restoring safety device, usually installed in the top of the cageConstruction lifter lifting door, protective enclosure door are equipped with electric interlock switch, which can effectively prevent because of hoisting cage or protective enclosure door open it up and running and materials caused by falling, only when the hoisting cage door and protective enclosure fully closed to start running.
Q:How is the construction elevator installed
Construction elevator installation 1) the location of the elevator depends on the condition of the site and the equipment, so as far as possible, stay away from the overhead line and keep the safe distance specified. When the elevator is running, there is a lot of danger and should be avoided. 2) the order of installation is: 3) place the chassis on the base and the base pre-buried bolt, and the platform is placed on the chassis, and the basket is placed in the middle of the chassis. 4) to install the standard section, each installation of two standard sections (usually less than 8m) to be temporarily fixed. The wire rope shall be used for the use of the temporary cable, and the joints and supporting points shall be bolted and not tied with the lead wire. 5) the installation should alternate between the two columns. Node bolt specification must according to the aperture matching, not packing, found that the aperture position at the time, can not arbitrarily expanding, more can't to lead wire bundle, instead to avoid loose node deformation. 6) when installing the standard section, pay attention to the vertical degree of the guide, and the line of the guide line should not appear in the line of folding and too big clearance to prevent the collision from running. 7) when construction site conditions permit, it can be assembled on the ground and then hoisted on the whole to reduce the height of the work. Due to the design of the frame, the stress condition of the construction is only considered, so before the whole moving up, the counter can be temporarily strengthened to enhance the bending capacity of the nodes.
Q:What is the main function of elevator motherboard?
A control system includes light, machine, electric, calculate, calculate the mainboard is mainly responsible for, the equivalent of the human brain, it gathers the elevator running status, corresponding analog signal output, control of elevator running properly and safely.
Q:Where is the location of the elevator in the project
Hard to answer, I think should combine the construction plan, adjacent to roadway facilitate material transport, and combining with the construction progress, do not put in sample area, in addition to combined with the construction interface classification and so on into consideration, to say.
Q:What is the need for the sc200/200 construction elevator cable?
The sc200/200 construction elevator cable line should not be below 120 square. Man's ladder 33KW, 5 * 33 = 165KW The tower is 45KW one, 2 * 45 = 90KW The pressure slag welder is estimated to be 25KW Touch welder 1OKW, 5 * 10 = 50KW Other facilities such as mixer, temporary illumination etc. 30KW Total power: 165 + 90 + 25 + 50 + 30 = 365KW One square cable is 5 minus 7A, 380V is 1KW is equal to 2A. That's 730A 730A divided by 5-7 calculates that the cable line should not be less than 120 square.
Q:Can a construction elevator use a single cage
Can use single hanging cage, an accident is a management issue could not be struck down so many people, if such construction lifter dual-use goods elevator belongs to the people, 19 people find this elder brothers say batter to death then top with manned elevator nor safe, in fact is a regular inspection, site do not have an accident can only say that the site is too lax
Q:The construction elevator always jumps
The construction elevator of our construction site always jump at the start of the building, always can't find the reason, the reason that can be so, have a person encounter this thing But it used to be normal, and sometimes it's jump, start, jump, start, and sometimes you can do it over and over again,
We insist in science and technology innovation, occupying markets with innovations, super quality and absolute faith. Our running principle is that quality comes first, customers come first, and reputation comes first. We face with friends and clients all over the world sincerely. To provide satisfied productions and services is our eternal pursuit and promise.

1. Manufacturer Overview

Location Beijing,China
Year Established 2003
Annual Output Value
Main Markets 15.00% Eastern Europe
15.00% South America
10.00% Mid East
10.00% Western Europe
10.00% North America
5.00% Oceania
5.00% Eastern Asia
5.00% Central America
5.00% Southeast Asia
5.00% Northern Europe
5.00% Southern Europe
5.00% South Asia
5.00% Africa
Company Certifications ISO9001:2000;CE

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port 11-20 People
Export Percentage 21% - 30%
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size: 10,000-30,000 square meters
No. of Production Lines 5
Contract Manufacturing
Product Price Range