Construction Elevator Building Hoist Lift Building Hoist with CE SC200/200

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Item specifice:

Power Source: Electric Maximum Lifting Weight: 2000 Maximum Lifting Height(M): 200
Lift Speed: 40

Product Description:


 Construction Elevator Building Hoist Lift Building Hoist with CE  SC200/200

We are special supplier of building hoist in China, our building hoist have been Widely exported to all over the world and won good reputation, whose payload capacity is as much as 10000kg, lifting speed can reach up to 96m/min, and the erection height reaches up to 550m., our products have been widely used for transportation for both men and cargo in field of general buildings, but also industry, electric power, mining well, oil, chemical industry etc.
SC270TD, SC270/270TD building hoist:
1). Each cage load capacity: 2700kg
2). Lifting speed: 36m/min, or 0∼ 63m/min, or 0∼ 96m/min
3). Mast section: Paint or hot dipping zinc
4). Cage: Single cage or twin cage
5). Recommended cage inner dimension(LxWxH)(m): 2.5x1.3 x2.5; 3.0x1.3x2.5; 3.2x1.5x2.5; 3.6x1.5x2.5; 3.8x1.5x2.5; 4.0x1.5x2.5; 4.2x1.5x2.5, cage dimension is according to requirement of customer and special project.
6). Motor and reducing device: Made in China, can be SEW Germany according to requirements.
7). Counterweight: With counterweight or without counterweight
8). The colors of cage: Yellow, or red, or blue
9). Other each cage load capacity for your to choose: 1000kg, 2000kg, 2700kg, or 3200kg




Type
 
Payload kg
 
Lifting speed m/min
 
Motor power kW
 
Inverter power kW
 
Counter Weight kg
 
Low speed
 
Single cage no counterweight
 
SC200GD
 
2000
 
0~46
 
3×15
 
45
 
0
 
SC270GD
 
2700
 
0~46
 
3×18.5
 
55
 
0
 
SC320GD
 
3200
 
0~46
 
3×22
 
75
 
0
 
Twin cage no counterweight
 
SC200/200GD
 
2×2000
 
0~46
 
2×3×15
 
2×45
 
0
 
SC270/270GD
 
2×2700
 
0~46
 
2×3×18.5
 
2×55
 
0
 
SC320/320GD
 
2×3200 
 
0~46
 
2×3×22
 
2×75
 
0
 
Middle speed
 
Single cage no counterweight
 
SC120GZ
 
1200
 
0~63
 
3×15
 
45
 
0
 
SC200GZ
 
2000
 
0~63
 
3×18.5
 
55
 
0
 
Single cage with counterweight
 
SCD200GZ
 
2000
 
0~63
 
2×15
 
30
 
2000
 
SCD270GZ
 
2700
 
0~63
 
2×18.5
 
37
 
2000
 
SCD320GZ
 
3200
 
0~63
 
3×15
 
45
 
2000
 
Twin cage no counterweight
 
SC120/120GZ
 
2×1200
 
0~63
 
2×3×15
 
2×45
 
0
 
SC200/200GZ
 
2×2000
 
0~63
 
2×3×18.5
 
2×55
 
0
 
Twin cage with counterweight
 
SCD200/200GZ
 
2×2000
 
0~63
 
2×15
 
2×30
 
2×2000
 
SCD270/270GZ
 
2×2700
 
0~63
 
2×18.5
 
2×37
 
2×2000
 
SCD320/320GZ
 
2×3200
 
0~63
 
2×3×15
 
2×45
 
2×2000
 
High speed
 
Single cage no counterweight
 
SC100GS
 
1000
 
0~96
 
3×22
 
75
 
0
 
SC120GS
 
1200
 
0~96
 
3×22
 
75
 
0
 
SC200G
 
2000
 
0~96
 
3×22
 
90
 
0
 
SC200GS
 
2000
 
0~96
 
3×22
 
90
 
0
 
Single cage with counterweight
 
SCD200G
 
2000
 
0~96
 
3×15
 
45
 
2000
 
SCD200GS
 
2000
 
0~96
 
2×22
 
45
 
2000
 
SCD270G
 
2700
 
0~96
 
3×18.5
 
55
 
2000
 
SCD320GS
 
3200
 
0~96
 
3×22
 
75
 
2000
 
Twin cage no counterweight
 
SC100/100GS
 
2×1000
 
0~96
 
2×3×22
 
2×75
 
0
 
SC120/120GS/
 
2×1200
 
0~96
 
2×3×22
 
2×75
 
0
 
SC200/200G
 
2×2000
 
0~96
 
2×3×22
 
2×90
 
0
 
SC200/200GS
 
2×2000
 
0~96
 
2×3×22
 
2×90
 
0
 
Twin cage with counterweight
 
SCD200/200G
 
2×2000
 
0~96
 
2×3×15
 
2×45
 
2×2000
 
SCD200/200GS
 
2×2000
 
0~96
 
2×2×22
 
2×45
 
2×2000
 
SCD270/270G
 
2×2700
 
0~96
 
2×3×18.5
 
2×55
 
2×2000
 
SCD320/320G
 
2×3200
 
0~96
 
2×3×22
 
2×75
 
2×2000
 
SCD320/320GS
 
2×3200
 
0~96
 
2×3×22
 
2×75
 
2×2000
 

Construction Elevator Building Hoist Lift Building Hoist with CE  SC200/200

Construction Elevator Building Hoist Lift Building Hoist with CE  SC200/200

Construction Elevator Building Hoist Lift Building Hoist with CE  SC200/200

Construction Elevator Building Hoist Lift Building Hoist with CE  SC200/200




Construction Elevator Building Hoist Lift Building Hoist with CE  SC200/200


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:The tower crane is on a surface with the construction elevator, and only 2 or 3 meters away. Is that allowed
Cranes and elevators from very close, may be the reason for the sites or the position is not reasonable, so close to the distance as long as you ensure the tower crane and tower crane arm when rotating to the above the elevator after satisfying the end, must keep more than 2 meters with elevator recent distance. Or you can refer directly to the tower crane safety code, GB5144-2006.
Q:Where is the location of the elevator in the project
Hard to answer, I think should combine the construction plan, adjacent to roadway facilitate material transport, and combining with the construction progress, do not put in sample area, in addition to combined with the construction interface classification and so on into consideration, to say.
Q:How is the construction elevator installed
The construction elevator should choose a good position first, do the elevator foundation, at the same time make the wall in the setting process. This one has the corresponding elevator basic drawing, should the professional personnel carry on setting up and disassembling.
Q:The construction of more than many floors must be used for construction elevators
The construction elevator, the average layer height above 12 floors need to be used, the hoist machine is not to go up to use the construction elevator to send a person to carry a few light things upstairs. Pre-installation preparation: After construction, the manufacturer will show the product certificate and provide the instruction manual. According to the technical requirement of installation safety technology checking list according to the construction elevator, the preparation should be inspected. The installation operator should hold the certificate, accept the technical, safety, etc., and make the safety operation rules for the construction lifter. 3, work environment: 1) the power supply must meet the requirement of power supply. 2) no electricity, gas welding or other obstacles to the operation of the crane are prohibited within the part of the elevator installations. 3) the platforms and channels that enter the building from the suspended cage shall reach the bearing capacity of more than two tons, and have strong protective barriers and protective doors. 4) it is forbidden to use guide rack, attached part scaffold, construction platform and the floor channel stretch, pipeline, rope, rope, banners, flags and other things has nothing to do with the elevator; In the evening homework, there should be sufficient illumination. 6) the doors to the floor will be kept in the door, each with a clear sign of the floor number.
Q:The elevator is banned from using elevators for more than a class of high winds
According to the safety requirement is level 6, please adopt!
Q:The construction elevator is commonly used in the process of the project
The construction elevator is commonly used in the process of the project. It is best to give a time period You're just saying one of its USES, I want to know what is the stage of what is going on in the project
Q:How many people are there for construction workers
At the end of the 20th century, the elevator was powered by the permanent magnet synchronous towing machine. It greatly reduces the space of the machine room, and it has the advantages of low energy consumption, energy efficiency and speed, which has greatly contributed to the development of real estate. Thyssenkrupp elevator company has developed a new type of "multiple lift" that can operate vertically. Take the size of a common car The size of the escalator is quite different: but the total area is required in the national standard. Give you a general calculation The width of the well is the width of the car. Well, the depth of the well = the car depth + 600 (for the reside) The width of the well is the width of the car. Well, the depth of the well = the car's depth + 1200 (for the rear-end). The u-shaped tourist ladder is usually around 1000kg The car is usually about 1300x1800 The steel structure shaft is width between 2200 and 2400, depending on the size of the door. The depth of the structure is about 1500, and the rear wall is empty.
Q:Is the construction elevator the same as the construction elevator
Construction lifter is a kind of vertical lifting equipment standard name, generally refers to the SC model of the single or double hoisting cage hoisting cage, driven by gear and rack, (in recent years, there are many strands of wire rope drive), equipped with "" for safety device, can people goods with multiplication. The construction elevator is called a popular term, and the common site is called a rack elevator and a human cargo elevator, which means the same thing. Because this kind of product applies only to the construction site, it is very different from the common guest elevator. There are two other types of products that are common to this type of product, such as the SS single-column double cage (wire rope drive), which is called the material lift machine, which cannot be multiplied by people. There is also the WJ series double column single-cage (wire rope drive), which is called the dragon door frame, which is also not allowed to be passenger. Strictly speaking, the latter two kinds can't be called construction elevator, can be called so-and-so elevator. Above is a person's humble opinion, if be in and out, still hope the expert is correct!
Q:Do the elevator need to be installed when the main project is in construction
The top brass usually need to install the construction elevator.
Q:How many floors do you need to install a construction elevator?
Do not have a regulation, as long as the benefit construction organization, installation does not install construction lift machine all can. It should be explained that the construction elevator has manned and pure cargo. Note: the installation of the construction elevator is required before the installation of the local quality and technical supervision bureau. After the installation, the safety record is made in the safety record in the use of the safety record.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range