Concrete Mixing Plant HZS50

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
1 Set set
Supply Capability:
3 Sets per Week set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 Main features:

 

1. Combined structure, complete sets installation, convenient to remove.

 

2. The host adopt JS series twin shaft compulsory mixer, which has the advantages of good mixing quality and high productivity.

 

3. The dosing of aggregate, cement, water, liquid additive are measured by weighing method, high batching accuracy.

 

4. The electric control system adopt the imported components. It has complete functions, reliable performance and convenient operation. The control center is installed on the ground in order to eliminate the vibration to electric control system.

 

 

Main Technical Parameters

 

Item

HZS50

Theoretical productivity

50 m³/h

Type of mixer

JS1000

Amount of species of aggregate

4

Maximum size of aggregate(Pebble/crushed stone)

80/60mm

Discharge height

3800mm

Overall dimension

35000mm*11700mm*19000mm

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How much concrete is produced per hour by HZS180 concrete mixer?
Depending on the different areas of the site, the requirement is between 10 and 300, 000, which requires a high level of testing equipment. The cost is relatively higher. The best way is to find a few different test equipment suppliers, according to different manufacturers, equipment, and make a simple quote analysis
Q:Which staff does the concrete mixing station need?
Mainly depends on how big is your station, whether can fully staffed, mainly included: general manager, deputy general manager, technology, webmaster, laboratory (deputy) director of the general, the production manager, sales managers, salespeople, scheduling, lab team leader, the operator (inspection), quality inspection, proportioning design, the material inspector technicians, machine operators, resposible, site, monitor of overhaul, maintenance engineer, loadometer, finance, cashier, mixers, pump truck drivers, company drivers, forklift driver, the handyman, chef, etc These are the main people who want to help you.
Q:How long does it take to build a concrete mixer station?
The core part of the stirring station: stirring the host, electronic control system, weighing element and instrument. The mixer should choose to use the stirring stability, the maintenance is simple and convenient, the service life is long, the match is supplied with the sufficient production plant. The electric component must choose the international brand products, preferably the imported original product, to guarantee the reliable; The software of the computer system shall be developed by the manufacturer in order to be upgraded and replaced in the future. And there should be a pro version of the software (piracy is prone to malfunctions and possible intellectual property lawsuits).
Q:Concrete mixstations belong to no special equipment
Special equipment is referred for life safety, greater danger of boilers, pressure vessels (including gas cylinders, hereinafter the same), pressure pipes, elevators, lifting machinery, passenger ropeway, large-scale amusement facilities. The boiler, pressure vessel (air bottle), pressure vessel is the pressure type special equipment; Elevator, hoisting machinery, passenger rope and large amusement facilities are special equipment for mechanical and electrical equipment.
Q:What constitutes the js750 concrete mixing station
pecific configuration can be cut can be numerous js750 hosts are commonly used to climb a pipe loading, the concrete quality requirement is not high do not need automatic batching only buy a belt bucket host to climb to go, with a tractor modified small forklift about yao to climb add material in the bucket.
Q:What are the supporting facilities for the concrete mixing stations?
The facilities include concrete mixing equipment, concrete transportation equipment, experimental equipment, forklift truck, over-pound equipment, pump, and car pump etc. Concrete mixing station is mainly composed of mixing console, materials weighing system, material conveying system, material storage system and control system of large system and other ancillary facilities. Because building aggregate measurement compared with standing aggregate metering, reduced the four of the intermediate links, and the vertical blanking metering, saved measuring time, thus greatly improving the production efficiency, under the condition of the same model, mixing building production efficiency than mixing plant production efficiency by a third. Such as: HLS90 floor of production efficiency and production efficiency of HZS120 stand HLS120 floor of the production efficiency, production efficiency is equivalent to HZS180 stand HLS180 floor of the production efficiency is equivalent to the productivity of HZS240 station. Concrete mixers are a combination of concrete and concrete prefabrication. Because its mechanization, high degree of automation, productivity is high, and can guarantee the quality of concrete and cement, commonly used in concrete, long duration and site of quantities focus of large and medium-sized water conservancy, electric power, Bridges and other projects. Centralized with the development of municipal construction, stirring, provide commercial concrete mixing station has great advantages, and thus get rapid development, and to promote concrete pumping construction, the mixing, transportation, casting machinery joint operation to create the conditions.
Q:What chemical materials are used in the concrete mixing station?
Start with the glue: cement, coal ash, mineral powder, and various expansions! Sand: natural sand, mineral sand, fine sand; Stone: 5-10, 5-20 water reducer! And tap water
Q:What does HZS mean in the HZS120 concrete mixing station
Because building aggregate measurement compared with standing aggregate metering, reduced the four of the intermediate links, and the vertical blanking metering, saved measuring time, thus greatly improving the production efficiency, under the condition of the same model, mixing building production efficiency than mixing plant production efficiency by a third. Such as: HLS90 floor of production efficiency and production efficiency of HZS120 stand HLS120 floor of production efficiency, production efficiency is equivalent to HZS180 stand HLS180 floor of the production efficiency is equivalent to the productivity of HZS240 station.
Q:What is the difference between a concrete mixer and a concrete mixer
Since a lot of people think commodity concrete, concrete stand and commodity concrete mixing floor are production of commodity concrete equipment, then there is no too big difference, most is just a big a small, one high a dwarf. But what's the difference between these two devices? So let's just do a little bit of an introduction. First commercial concrete, concrete stand and mixing building systems: the difference between a bituminous concrete stand composed of five systems, such as material supply system, measuring system, mixing system, electric control system, etc. The stirring building is relatively simple.
Q:Cement warehouse introduction, storage reserves?
There's nothing to come, but warm and young About 200 tons
Our company covers 100 acres, including a building area of 4000 square meters and have three branches. We employ 486 workers and 80 engineers and have strong technical force, excellent equipment, advanced inspection way and strict management. We set up computer files for our customers so that we can keep the record of customers' feedback, tracking services and long-term warranty service.

1. Manufacturer Overview

Location Henan,China
Year Established 2001
Annual Output Value Below US$1 Million
Main Markets Africa 3.66%
Domestic Market 96.34%
Company Certifications ISO 9001:2008

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port Annaba,Auckland,Mombasa
Export Percentage 1% - 10%
No.of Employees in Trade Department 1-2 People
Language Spoken: English
b)Factory Information  
Factory Size: 10,000-30,000 square meters
No. of Production Lines 6
Contract Manufacturing OEM Service Offered Design Service Offered Buyer Label Offered
Product Price Range Average