2019 China-made PPR Equal Tee Pipes Hose Used with Superior Quality
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 200 pc
- Supply Capability:
- 10000000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Introduction
Material: PP-R
Technics: Forged
Type: Pipes
Model Number: DSW382-383
Shape: Equal
Main features
1.From factory Directly.
2. Full PPR Pipe Fitting size DN 20-160mm All manufacture by ourselves
3. Full PPR Series: PN1.25Mpa , PN1.6Mpa , PN2.0Mpa,PN2.5Mpa
4.Materials imported from BOREALIS and HYOSUNG R200P
5.Sanitization & non-poison: green products can be used to pure clean drinking water system
6.Super heat-proof: with standards temperature as high as 95.
Package:
1.As usually, we need 20 days to 45 days.
2.By the way ,we can control our delivery time and products' quality.
3.It depends on our destination and order. Generally, it will be shipped to our destination within 50days,we will arrange everything timely after receiving our deposit.
Our Services
1. Samples are free;
2. Reponses timely and best service;
3. High quality and with a strict quality control system;
4. Control delivery date;
5. Best service provided when u have any questions for our products;
6. Using raw materials with good quality.
Product Description
1.Material : | PPR |
2.Color: | White, Gray, Green, or as you required. |
3.Size: | 20-110mm |
4.Logo: | CMAX or Customized |
5.MOQ | 1000pcs |
6.Samples Time: | (1) 4-5days-If you want to customize your logo. |
(2) 1day-For our existing samples for reference. | |
7.Packing Details: | Weaving Bag |
8.Production Capacity: | 5,000,000pcs Per month. |
Product Show
Company Profile
CNBM International Corporation (CNBM International) is the most important trading platform of CNBM Group Corporation, a state-owned company under the direct supervision of State-owned Assets Supervision and Administration Commission of the State Council.
Since 2004, the trading volume of CNBM International has been doubled in 5 successive years owing to the support of superior corporations and effort of all staff. Meanwhile, we have established strategic partnerships with hundreds of domestic manufacturers and sound business relations with clients from over 120 countries. Currently, we have wholly-owned overseas subsidiaries and branches in 5 countries with a view to realize localization, which also represents an essential progress in our globalization target.
In line with the business, CNBM International launched E-business platform Okorder.com.
With the advantages in Cement, Composite Materials, New Building Materials and Engineering, we mainly concentrate on coal, steel and construction equipment and give priority to solar and wind energy development simultaneously utilizing our competitive position on traditional building materials to achieve sales revenue of RMB10 Billion in 2013.
CNBM International is highly recognized by its business partners and clients all over the world and has obtained rapid development under the spirit of win-win. We will carry on the mutual beneficial, innovative and revolutionary trading structure as we did before, create value for our employees, share holders and clients and benefit the whole society in our future development.
Our Factory
FAQ
Q: What you offer?
A: Any kinds of goods you need, just send us the request, we will reply you back with the details very soon.
Q: Product quality and delivery time?
A: Normally 7-15 days after the order confirmed, we will collect the goods and inspect each of the items and send you the inspection photos for you to confirm.
Q: What's the regular shipping port?
A: Ningbo, Shanghai.
Q: What's your payment?
A: T/T or L/C at sight
- Q:How do you prevent plastic tubes from becoming brittle?
- To prevent plastic tubes from becoming brittle, it is important to store them in a cool and dry environment, away from direct sunlight or extreme temperatures. Additionally, avoiding exposure to harsh chemicals, solvents, or abrasive materials can help maintain their flexibility and prevent brittleness. Regular cleaning and maintenance using gentle cleaners specifically designed for plastics can also contribute to their longevity.
- Q:EXACTLY WHERE AT THE MOUTH OF A PLASTIC TUBE DOES THE PRESSURE NODE FORM? (Dealing with standing waves in air)?
- Level with the open end. Pressure nodes form where there are displacement antinodes and displacement nodes form where there are pressure antinodes If you look at the diagram, this will be clear.
- Q:What are the common wall thicknesses for gas line plastic tubes?
- The common wall thicknesses for gas line plastic tubes typically range from 0.0625 inches (1.59 mm) to 0.125 inches (3.18 mm).
- Q:does anyone have any ideas on how i can hide my plugs
- put a plant in front of it....or you can get a low table. almost like a coffee table that you can put things like picture frames, or DVD player etc. on and that should hide it too
- Q:What is the minimum length of plastic tubes?
- The minimum length of plastic tubes can vary depending on the specific application and requirements. It can range from a few centimeters to several meters or more, depending on the intended use and manufacturing capabilities.
- Q:I still have the fork tubes mounted to the bike. I have removed the cap, spacer tube, washer, spring, damper bolt (from the bottom of the tube) and removed the damper and short spring. I have pried the dust cap (rubber seal) and slid it all the way up. There is a piece of plastic? or nylon? that is blocking the circlip(I assume). I do not have a manual for this bike but I can not get one for a few days, so the help would be great!!
- Just pry the plastic ring up (nothing is holding it). Perhaps it's stuck to the foam ring underneath it. After you remove the circlip, the the fork tube and lower will have to be pulled apart. The fork seal is in very tight. Hold the tube in one hand and the lower in the other hand. Push the forks together. Yank them apart with force (a bushing inside of the forks will hit against the seal like a slide hammer). They won't come apart in one pull. Push them - in - OUT -in - OUT - in - OUT
- Q:Plastic tubing is touching compressor (or close to it) and gets hot and brittle. I recoupled a bad spot 1 year ago and it is leaking again. I would like to replace the tubing from the back of the refrig (solenoid) to the water filter. Any ideas on what material to use? I would like to use copper line thru the bottom of the refrig if not all the way to the water filter, but don't know how to connect it to the solenoid. Also would pex (1/4 OD) line be a better (albeit more expensive) choice for this?
- You can replace the line with copper. If the connection point is metal you'll want to use a brass compression nut (brass) with a (brass) compression sleeve (know as a ferrules) if the connection point is plastic you'll want to use a nylon compression fitting. The metal ferrules one wont work as you would need to crank the you know what out out it to make it seal, and run the risk of stripping the plastic threads. The nylon takes less torque to seal if that makes sense as its a more dense material. You should be able to get all the parts from a local hardware store or big box store such as lowes or homedepot.
- Q:What are the different closure options for twist-off tubes?
- The different closure options for twist-off tubes include screw caps, flip-top caps, snap-on caps, and press-on caps.
- Q:i have a plastic tube that i want as a handrail how do i do it, cos tube is 1 inch wide
- There okorder /
- Q:Is there an instrument for measuring the leakage of underground plastic pipes?
- There are such instruments, but not omnipotent, can solve the problem, depending on the actual scene. In general, Water Leakage big words, instrument can generally be detected, but if it is difficult to guarantee a certain small Water Leakage detected, after all, each device has a predetermined sensitivity, the sensitivity is lower than that of Water Leakage cannot be detected.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
2019 China-made PPR Equal Tee Pipes Hose Used with Superior Quality
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 200 pc
- Supply Capability:
- 10000000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords