• Polymer Cable tray Anti-corrosion Composite Cable tray System 1
  • Polymer Cable tray Anti-corrosion Composite Cable tray System 2
  • Polymer Cable tray Anti-corrosion Composite Cable tray System 3
Polymer Cable tray Anti-corrosion Composite Cable tray

Polymer Cable tray Anti-corrosion Composite Cable tray

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
100 m
Supply Capability:
10000 m/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Introduction:

Due to the particularity of the cable use environment, there are corrosion factors and fire factors in the environment, so we pay great attention to its anti-corrosion performance and fire performance in the production process of cable tray, and we will use corrosion resistant rigid materials to produce our products.

Of course, you can also achieve the anticorrosion and fire protection of cable tray through different processes, such as hot dip galvanizing, electric galvanizing, coating antirust paint, etc. When ordering products, please inform us of your technical process requirements, we can choose the production process according to your requirements.

 

Polymer Cable tray Anti-corrosion Composite Cable tray

Polymer Cable tray Anti-corrosion Composite Cable tray

 

Size

The corresponding width, height, thickness, length can be calculated according to your project engineering

Parts:

Cover Plate、Steel Lined、Cross Arm、Blocking 、Stainless screw、Holdfast、Anticorrosive and anti-aging protective coating.

Application:

It is suitable for construction projects in chemical industry plants, such as medicine, fertilizer, chlor-alkali, caustic soda, methanol, propylene, etc.

 

Q:How can the most effortless way to put the cable on the bridge
I do not know your mountain bike slx brake line is how long, in fact, the thickness is not important, even if you can not buy, you can buy and your original almost a long brake line. And then their own modified. Wire core a little longer if you cut with the old tiger and your original car as long, the tube can put the head of the hedge, with the vise slowly shake (note not too hard to engage in deformation) to take down, and then the line And the amount of your original to the same length of the extra cut, the hedge back on it.
Q:Cable bridge factory generally use what color, secondary anti-corrosion what color, what standard?
If it is out of the line, choose BVVB copper jacket flat wire, easy to install also beautiful. Lighting with 2-core 1.5mm & amp; sup2 ;, general general socket such as washing machine, TV selection 3-core 2.5mm & amp; sup2 ;, kitchen, bathroom consider the use of induction cooker and electric water heater power larger, select 3 core 2.5mm & amp; sup2 ; 4mm & amp; sup2; is preferred, air conditioning and main line selection 4mm & amp; sup2; Rural new houses, but also their own home cover, for the safety of the best buried a ground wire, it is recommended to buy 3-core reasons. Click the picture to view the jacketed flat wire:
Q:Shaft bridge 400 * 200 bracket should be how many meters a
With the length of the steel into the measurement, identify the location of open heart broken belly, there is no way to do the ground leveling layer before re-distribution.
Q:Always confused the bridge has been linked with copper mesh with a why even laying a galvanized flat iron. More
Repair computer accessories (motherboard) is basically to return to the factory (in addition to the memory is a direct change for the new to you), and now what the boss so much repair their own repair ah -.- burned more serious? At least tell you about what is burning it. There is no burning is not serious argument, only to repair and can not repair these two cases. As for the will not be changed things, unless you have seen, according to phase, or really no way.
Q:1. "vertical isometric upper left bend" and "vertical equidistant right bend" What is the point of view, to the left and right? 2. With the days of electricity 8.5 painting Sometimes, the two completely opposite direction, that is, like the mirror relationship of the bend, this should be a left, a right, and the days of the software is a model that is a software vulnerability? More
The generator uses a soft connection at the following points, and the rest is hardwired. . the generator terminal and bus connection; . the bus leads to the basis of the generator to other points; . the generator bus leads to the wall, . generator bus and equipment connection
Q:Seeking: cable tray 100cmx10cm bracket installation spacing requirements
cable bridge and electrical equipment cross, the gap between the distance of not less than 0
Q:Can the cable bridge be on the ground?
No, the bridge is to rely on the top to go, generally hidden in the ceiling.
Q:I would like to ask you, you generally do steel plant, how to lay the bridge feel better? I have some drawings, 1. Some of the bridge laying in the I-beam column, 2. Some of the bridge laying on the wall, 3. There are bridges along the steel roof truss lay, I went to know the appearance of steel roof truss, There are winding, chord, the middle of the abdomen is used to insist on the upper and lower sides, but that is along the winding, roof truss sometimes not linear level, sometimes for example triangular steel truss, not the level of the winding how to walk it? Is it easy to walk? Do not know where you design steel plant, the bridge how to design the best, the most appropriate? Thank you! More
What is the number of air conditioning is usually called, according to the air conditioning power consumption to estimate the amount of air conditioning cooling. In general, the habit of using a equal to 2500W of cooling capacity (that is, 25 models), 1.5 is about equal to .3500 amount (that is, 35 models). 1.5 for 16 to 26 square meters. 4 square of plastic copper wire can be 10kw enough to take the green line. 2.5 square steel wire can accommodate 3500W can also be. Preferably 4 square meters of plastic copper line is good
Q:How the spacing of the hangers of the bridge is determined
Cable ends should be marked with cable head symbols, the middle line should also be different from the ordinary wiring. Bv at the beginning of the general wire, with YJV or vv is generally a cable, but not limited to these
Q:Due to the environment is not good, the original buried cable damage many times, want to use the bridge, but the overhead conditions are not allowed, the picture below is the hot water pipe, the above is the hot oil pipeline, but also over three doors more
weak tube, line, slot construction standards and strict implementation of the construction specifications, according to construction drawings, construction manual construction The Without the signature of the general engineer, the project manager agrees and declares to the supervising company, and may not arbitrarily change the construction plan

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords