XE150D Excavating machinery,best Excavators

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

ModelUnitXE150D
Operating weightkg14400
Standard bucket capacity0.52-0.61
EngineEngine Model/CUMMINS 4BTAA3.9
Direct injection/
Four strokes/
Water cooling/
Turbo charged/
Air to air intercooler/
No. of cylinders/4
Rated power/speedkw/rpm85.4/2200
Max. torque/speedN.m447/1500
DisplacementL3.927
The main performanceTravel speedkm/h5.2/3.4
Swing speedr/min12.3
Max. gradeability/≥35
Ground pressurekPa38
Max.Bucket digging forcekN85
Max.arm crowd forcekN65
Max.traction forcekN135
Hydraulic systemMain pump/2
Rate flow of main pumpL/min2×120
Max pressure of prime relief valveMPa31.4/34.3
Max pressure of travel systemMPa34.3
Max pressure of swing systemMPa25
Max pressure of pilot systemMPa3.9
Oil capacityFuel tank capacityL250
Hydraulic tank capacityL130
Engine lubricationL14
Overall dimensionsA Overall lengthmm7801
B Overall widthmm2590
C Overall heightmm2880
D Overall width of upperstructuremm2512
E Track lengthmm3660
F Overall width of undercarriagemm2590
G Crawer width600
H Track length on groundmm2910
I Crawer gaugemm1990
J Clearance under counter weightmm964
K Ground clearancemm478
L Min.tail swing radiusmm2325
Working rangeA Max. digging heightmm8641
B Max. dumping heightmm6181
C Max. digging depthmm5538
D 8inch horizonal digging depthmm5287
E Max. vertical wall digging depthmm4727
F Max. digging reachmm8296
G Min. swing radiusmm2335
Angle of arm deflectionDegree——

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the cost of machinery for a 2 ton per day fruit juice processing factory?
Very okorder.com/ ... I googled commercial juice processing equipment
Q:suggest me some name for the exhibition to be conducted on printing machinery?
my okorder.com/
Q:What are the concrete construction machinery?
Construction machinery and equipment for reinforced concrete works: 1. Steel bar: butt welding machine (butt steel bar), steel bending machine, electric welding machine. Two, bricklayer: concrete mixer, insert type vibrator, plate vibrator. Three. Shell planer: woodworking planer, sawing machine.
Q:would it be machinery or machinaries?
A list of the machinery is listed below. But why is this under golf?
Q:how to get corn germ oil machinery?
corn oil; do you mean bio diesel or other? macaroni machine?
Q:What kind of industry does the machine industry refer to?
Machinery industry refers to the machinery manufacturing industry, such as lathe processing equipment manufacturing and so on, all belong to the machinery industry;
Q:Steel for construction machinery, including those concrete materials?
The most commonly used is 45# steel, see what materials you need, you can go to the manual, an engineering staff have a hand, you can find the type of material, the specific ingredients, applicable to what environment?
Q:eps machinery,ithink you can?
i okorder.com
Q:Should Obama dismantle amm machinery in the USA, so that more people can be put to work?
Nope. That would make imports even cheaper than they are now. He can make a lot of jobs by doing things like how large certain companies, like banks and insurance companies can be which will increase competition and decrease efficiency which will create more jobs. It will lead to higher prices though. I lost a good job at a bank when they got bought out by a bigger bank.
Q:Is it legal in the state of Florida for an employer to make an employee pay for damages on machinery?
did the boss approve the extra time did your shift supervisor approve it if no to the two then no they dont ought to pay you as you volunteered to do the extra advantageous artwork artwork nor authorized via administration beforehand of it being finished may be seen as volunteer artwork did somebody ask you to stay over if not you worked for unfastened regrettably its legal you chosen to stay and artwork without consent subsequently they dont ought to pay you

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range