Waterseal Mastic Double Sided Tape with Good Performance Equel to 2166

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1000 roll
Supply Capability:
500000 roll/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Waterseal Mastic Double Sided Tape with Good Performance Equel to 2166

Description of KC86 Tape

• KC 86 is a self-amalgamating mastic tape used for moisture sealing on all types of telecommunications and solid dielectric power cable splices and connections.

• It is a tacky, temperature stable mastic with excellent conformability and adhesion to metal and all types of cable insulations and jackets.
• It is put up on a white release coat separator in roll form without any core.
• Once applied, KC 86 mastic should be overwrapped with a vinyl or rubber tape which will encapsulate it and, throug centripetal force, make it into every crevice and indentation in a cable jacket thereby giving a superior moisture seal in a splice or aroun any connection.
• The tape is also RoHS compliant, resistant to corrosion, chemicals and salt water and has no adverse effect on cable insulations.
• Its 2.5mm thickness facilitates rapid protection build-up.

• Use in conjunction with KC 63 premium vinyl electrical tape for optimal performance.

Dimensions of KC86 Tape
2.5” x .1” x 23.6”
63mm(width) x 2.5mm(Thickness) x 0.6m(length)
Consult us for other sizes

Specifications of KC86 Tape

Waterseal Mastic Double Sided Tape with Good Performance Equel to 2166

Applications of KC86 Tape

• Moisture seal and insulation in power cable through 600 volts

• Moisture seal and insulation of telecommunication cable connections in base stations, antennas and aerial feeders

• Other moisture sealing applications

Waterseal Mastic Double Sided Tape with Good Performance Equel to 2166

FAQ

1.Before placing order, can we make sample firstly?
Sample can be arranged to send to you to test before placing order.
Sometimes sample is free ,sometimes sample charge should be included if more than 3 pcs with material .
But we are afraid freight charge will be paid by yourself.
Certainly, we will adjust additional sample and freight charges into your bulk order.

2.How can I get your sample?
Of course, we can send you some samples. Most samples are free, but sometimes we will take small sample fees.
Maybe you also send us your DHL or EMS/UPS/TNT etc account ,so you can pay for air freight to your carrier company directly.

3.Whether we can print our logo or need our color or size or not?
Yes, because we have our own factory and R&D team, so we can make products as your demands.
We can print your logo, we also can make as your size and print it as your color.

4.How many kinds of payment terms you can accept?
About payment terms, we would like 100%TT if less than $1000.00
Usually for bulk order , would like can be paid pay 30%- 50% advanced payment and the rest should be paid before dispatch.
We hope this information will be helpful to you, if you have any question, please feel free to contact us, we are always at your service.



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Do you use the waterproof material on the building to be harmful to the human body?
Your pores, the respiratory tract, the lungs, will be hurt, when young do not feel out, the consequences more powerful than smoking.
Q:Slope roof drains do not need to be waterproof
In addition, according to conventional settings vertical and horizontal sub-grid, complex structure easy to leak.
Q:How does the finished ventilator manufacturer waterproof?
Rooftop natural ventilator waterproofing measures are mainly two kinds, one is the traditional silicone, adhesive tape waterproof, the other is the structure of water, the national standard Atlas 11CJ33 "ventilation and light skylight" recommended the use of structural waterproof technology.
Q:Roof sunscreen waterproof layer leakage, brush milk white plastic can solve it?
How to deal with the roof leakage, the roof leaks to find the first leak, looking for the main leak from the roof to the lower to find leakage. The first is to see if there is no cracks in the roof, the original waterproof layer is not aging, the roof of the original SBS waterproofing membrane has no bubbles, there are bubbles to prove that the water has entered the bottom of the waterproof layer, and thus leaking. There is a block on the roof of the gutter is not blocked in the countryside, there are still a large number of tile-roofed house, when the tiles due to damage caused by the roof leakage, as long as the replacement of tiles can be, this step is also known as "
Q:Bathroom first leveling or do waterproof, what is the difference
7. The threshold stone is only decorated, do not mistakenly believe that can hold water. In short, each process have to carefully do not leave a hidden trouble to ensure worry. But the reality of the structure, materials, workers, mutual protection and many other unsatisfactory, so that waterproof is a common problem, perhaps set (overall) bathroom by the factory as a whole production test, on-site assembly will solve this common problem.
Q:Nanning building waterproof material market where
Nanning this building waterproof coating does not seem to have a special market, waterproof materials like fast ring building materials market, Wan Tai Long have to sell, as well as Mingxiu Road and Mingxiu Road on both sides of the road have a heavy focus on waterproof materials and companies
Q:Villa roof leakage what general reasons, what materials to remedy
  Note: Before the waterproofing and draining construction, the roof must be dry, because the roof of the water does not evaporate, the new waterproof layer will rise, the waterproof effect immediately invalid. Therefore, rainy days should not be construction, to wait until the sun will dry the water before construction.
Q:I would like to ask how to do in the warm water above,
I do not do 80% of the warm water, of course, the use of good quality water pipes, waterproof water is generally done in the following to do, if done in the warm tube above will affect the heat of the floating, to warm the following covered with a Layer insulation layer and then covered with warm tube to, and then beat the water to ensure that no leakage. And finally in the above covered with wooden floor or floor tiles.
Q:There is no formaldehyde in the finished putty
Often people are talking aldehyde color change, because the formaldehyde is very polluted environment contains a lot of carcinogenic substances, so into the wall inside unknowingly become an environmental killer.
Q:Can Henkel have water against him?
In order to ensure the quality of the proposed do not add water, the general finished materials are proportional, emulsion and powder, in strict proportion.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range