• Tower Crane TC7021 Construction Equipment Sales System 1
  • Tower Crane TC7021 Construction Equipment Sales System 2
  • Tower Crane TC7021 Construction Equipment Sales System 3
  • Tower Crane TC7021 Construction Equipment Sales System 4
Tower Crane TC7021 Construction Equipment Sales

Tower Crane TC7021 Construction Equipment Sales

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Tower Crane TC7021 Details:

Minimum Order Quantity:     1unit                                            Unit:     unit                            Loading Port:     China main Port

Supply  Capability:         5unit/month                                                                Payment    Terms:      T/T   or  L/C


Tower Crane TC7021 Description:

1.CMAX Tower Crane TC7021  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC7021 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC7021 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC7021  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC7021  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC7021  Parameter:

 Max. working range 70m, tip lifting weight 2.1T and Max. lifting weight 12T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 50

Max height with attachment (m) 200

Working range can be adjusted (m) 40、45、50、55、60、65、70

Min working range (m) 2.5

Max lifting capacity (t) 12

Tip load @ 50m (t) 2.1


Tower Crane TC7021   Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC7021Diagram:

Tower Crane TC7021 Construction Equipment Sales

Tower Crane TC7021 Construction Equipment Sales

Tower Crane TC7021 Technical Sheet:

Tower Crane TC7021 Construction Equipment Sales

Tower Crane TC7021 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC7021 for example, the first two letters “TC” means Tower Crane, “70”means jib length is 70 meter, and the last two letter “21” means the tip load is :2.1 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.





 

 

Q: What are the mixing arms of the concrete mixer?
Mixing arm concrete mixer is a component of the mixing arm itself and divided into lateral mixing arm (positive and negative points), stirring arm (also have positive and negative points), stirring arm below is the bearing seat connected, connected with 4 sets of high strength bolts with stirring arm. The top is equipped with wear-resistant mixing blades, connecting with mixing blades, high-strength bolts 2 sets. In addition, some manufacturers have designed mixing side bonded shaft swivel, is installed in the interval between the stirring arm fixed and rotated in two ways.
Q: Changsha Sanlian Building Machinery Fittings Factory
In addition, you can check the input path, or the name of the unit on the map. It will remind you that there is no unit in Changsha and no way. In addition, we received a fax, saying that you want to order what goods, may wish to go to the other party's local industrial and commercial Red Shield network to check whether there is this unit
Q: What kind of electrical equipment do you have? What are the main components of each device?
Electrical equipment mainly refers to the transformer, reactor, capacitor, combination electric appliance, circuit breaker, transformer, lightning arrester, coupling capacitor, transmission line, power cable, grounding device, generator, condenser, motor, closed busbar, thyristor.
Q: What are the safety protection equipment, machinery and equipment, construction machinery and accessories for construction enterprises?
As well as scaffolding, protective fence, all belong to the safety protection facilities, does not belong to the safety protection appliances. Safety protection tools are many, it is characteristic of the operator to carry, I will not list
Q: What are the mechanical drawing software?
The plane is mainly CAD and CAXA, there are some non mainstream mechanical engineer what, mainly engaged in your spare parts of machinery industry, roughness, form and position tolerance requirements, recommendations for CAXA, which symbols are readily available, there are standard parts library, mechanical symbols library etc..
Q: Construction machinery production need to deal with what documents?
At all levels of production safety responsibility system, mainly refers to: the legal representative of the safe production responsibility system; the responsible person in charge of safety production safety responsibility system; the technical director (Chief Engineer) production safety responsibility system; the safety department (Department) Changan production responsibility system; responsibility for production safety, the project manager; specifically (and) post safety responsibility system for production safety; construction technician (technician), safety production responsibility system; 8 class (Group) Changan production responsibility system; workers, production safety responsibility system. Departments responsible for production safety system, mainly in accordance with the functions of enterprises set up departments, the corresponding formulation of the responsibility system for safety in production.
Q: Where does Heilongjiang do the most construction machinery?
All of the industry designated product range is roughly the same as that of China engineering machinery and other countries are also increased the railway engineering machinery, forklifts and industrial handling vehicles, decoration machinery, elevator, pneumatic tools and other industries.
Q: Where are the hanging baskets for the building?
It is forbidden to take a stool or put a ladder on a hanging basket to work higher; it is not allowed to work alone in a basket, and no electric machinery or equipment can be placed in the basket;
Q: What is the difference and connection between equipment manufacturing and machine building?
When our company went to the training center of the Department of industrial engineering of Tsinghua University, the professor of Qinghua University told us about it. Equipment manufacturing industry is a general term for the equipment provided for the national economy and national security
Q: What functions should be achieved in mechanical structure design?
The design of mechanical structure is based on the overall design, according to the principle of the program to determine and draw a specific structure, in order to reflect the required functions. Is the working principle of the abstract concrete into some parts, the specific content in determining the structure of the material, shape, size, tolerance, heat treatment and surface conditions at the same time, we must consider the process, strength, stiffness, accuracy, and other parts of the relationship between each other and other issues. So, the direct product structure design is the technical drawings, but the design work is not a simple mechanical drawing, drawing only express design language, specific integrated technology is the basic content of structural design.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords