Tower Crane TC4808 Sale Construction Equipment Building Machinery
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Tower Crane TC4808 Details:
Minimum Order Quantity: 1unit Unit: unit Loading Port: China main Port
Supply Capability: 5unit/month Payment Terms: T/T or L/C
Tower Crane TC4808 Description:
1.CMAX Tower Crane TC4808 is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2. Tower Crane TC4808 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.
3. Tower Crane TC4808 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
4.Tower Crane TC4808 has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on.
5.Tower Crane TC4808 has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.
Tower Crane TC4808 Parameter:
Max. working range 48m, tip lifting weight 0.8T and Max. lifting weight 4T.
Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.
Trolleying mechanism can provide two operation speeds.
Free standing height (m) 31.5
Max height with attachment (m) 110
Working range can be adjusted (m) 38、43、48
Min working range (m) 2.25
Max lifting capacity (t) 4
Tip load @ 48m (t) 0.8
Tower Crane TC5013 Packaging & Delivery:
40HQ container
20~25days after deposit
Tower Crane TC5013 Diagram:
Tower Crane TC4808 Technical Shee:
Tower Crane TC4808 FAQ:
1.What is tower crane?
Tower crane is a modern form of balance crane that consist of the same basic parts Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.
2. What is the meaning of the tower crane’s code?
Take Tower Crane TC4808 for example, the first two letters “TC” means Tower Crane, “48” means jib length is 48 meter, and the last two letter “08” means the tip load is :0.8 ton.
3. What is the principal to quote the right tower crane to the client?
First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.
- Q: Construction Engineering, moving equipment and stationary equipment, respectively
- 2. Static equipment: reaction equipment (code R). Such as reactor, reaction kettle, decomposition pot, polymerizer, autoclave, converter, digester, steam ball, sulfonation pot, gas producer and so on. Heat exchange equipment (code H). Such as tubular waste heat boiler, heat exchanger, evaporator, condenser, cooler, heater, sterilization pot, water jacket, etc. for dyeing dryer, steamer, cooker, gas preheating. Separation equipment (code S)
- Q: What are the mixing arms of the concrete mixer?
- Concrete mixer parts often due to operational mistakes and equipment damage, we should know that the correct use of Yantai mixer parts, mixing arm not only can complete the "workload" on time, but also to extend the service life
- Q: What are the details of construction machinery parts in sand casting?
- 9. (2) all kinds of cables. (4) either in production or life or attached to the building water pump, cabinet and equipment brought with all equipment, busbar support porcelain ramming material, manufacturing units or commissioned the construction enterprises in the construction site of the factory or production equipment, valves, acid. (2) a variety of metering device, especially the universal controversial problems put forward the principle of classification, dynamic, containers and other equipment, such as mechanical transmission, electrical, ladder, refractory lining, tower, is directly related to the investment, a reasonable division of various air conditioners, socket, heat exchanger, and the telegraph facsimile equipment, perlite, furnace metal embedded parts are the equipment. 7, transportation.
- Q: Changsha Sanlian Building Machinery Fittings Factory
- In addition, you can check the input path, or the name of the unit on the map. It will remind you that there is no unit in Changsha and no way. In addition, we received a fax, saying that you want to order what goods, may wish to go to the other party's local industrial and commercial Red Shield network to check whether there is this unit
- Q: Definition of large mechanical equipment?
- The hoisting machinery used in bridge construction can be divided into three categories: light and small lifting equipment, bridge type crane and boom type crane. Light and small lifting equipment, such as jacks, hoists, winches, etc.. Bridge type lifting machinery, such as beam cranes, Longmen cranes and so on. Boom type cranes, such as stationary slewing cranes, tower cranes, truck cranes, tires, crawler cranes, etc..
- Q: What type of industry does the machinery and building accessories processing belong to?
- Every industry has average tax rate, the contribution of each this argument does not exist, the industrial enterprise is nade VAT. The more value-added products you pay more.
- Q: Construction machinery production need to deal with what documents?
- The person in charge of the enterprise, the person in charge of the project, full-time safety management personnel in "safety assessment qualified" column content according to the "three persons" Safety Assessment Certificate (fill in the contents of enterprise work safety management staff should meet the enterprise production safety management, the safety management department staff with the qualification to the total contract for not less than 5, not less than 3 professional contracting labor subcontracting, not less than 1; the construction site should be equipped with full-time safety management personnel according to the project size can be determined, according to the construction area of less than 10 thousand M2 project has at least a part-time staff of more than 10 thousand M2; project 1 - 2 full-time staff; more than 50 thousand M2 large sites, according to different professional safety management group);
- Q: How are buildings, installations and materials divided?
- Equipment generally includes the following: (1) all kinds of equipment and the equipment with the arrival of accessories, spare parts and equipment attached to the body made of ladders, platforms, railings and pipes. (2) various gauges, instruments and automatic control devices, experimental instruments, instruments and meters in the main part of the equipment. (3) components of equipment, such as oils, chemicals, etc. attached to the equipment body.
- Q: What is a door rack for a construction site? How high is it generally?
- Construction machinery network learned that the door scaffolding in our country production and use of time is not long, the scaffolding developed by the various research institutions, self-contained, and not common, varieties, specifications and diverse. Some factories copy foreign products and use the imperial size.
- Q: What are the sub projects of a construction project?
- Lime soil, sand and gravel foundation, geosynthetics foundation, fly ash foundation, dynamic compaction, foundation grouting, preloading foundation, vibroflotation foundation, jet grouting foundation, cement mixing pile foundation, soil and lime soil compaction pile foundation, cement fly ash gravel pile, cement soil pile foundation. Based on sand pile foundation
Send your message to us
Tower Crane TC4808 Sale Construction Equipment Building Machinery
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords