Steel Coupler Rebar Steel Tube Made in Shanghai China Made High Quality
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 5000 pc
- Supply Capability:
- 300000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Steel Coupler Rebar Steel Tube Made in Shanghai China High Quality
1.Description of Steel Coupler Rebar Steel Tube Made in Shanghai China High Quality :
Lapped joints are not always an appropriate means of connecting rebar. The use of Steel Rebar Couplers can simplify the design and construction of reinforced concrete and reduce the amount of reinforcement required.
The threaded steel coupler system is designed as a threaded reinforcement connection with 100% load transmission. The steel coupler rebar connection system is suitable for both static and dynamic load transmission in construction joints.
The coupler is designed as a threaded reinforcement connection for formed construction joints. Reinforcement work is normally carried out on both sides of the construction joint using lap joints or one side is anchored. The bar lengths are based on the structural analysis requirements of the building component and are calculated from anchorage and lap lengths.
2.Advantages of Steel Coupler Rebar Steel Tube Made in Shanghai China High Quality :
Advantages of Cut and Bend Services
Rebars are cut and bent to exact specifications, ensuring precision and consistency.
Cut and bend reinforcement bars do conform to BS 8666.
Material wastage is controlled and reduced.
Better utilisation of on-site space, logistics and reduction of inventory on-site.
In-house processes and procedures that ensure traceability down to the order level
The coupler system provides the opportunity to connect rebars quickly, easily and cost effectively, even when large rebar diameters are used. This makes the steel coupler rebar range a logical extension to our rebendable CNBM reinforcement continuity system for rebars over 12 mm.
3.Available sizes of Steel Coupler Rebar Steel Tube Made in Jiangsu China:
14mm,16mm,18mm,20mm,22mmm,25mm,28mm,32mm,36mm,40mm
4.Delivery:
Delivery Term: FOB / CFR / CIF available.
Delivery Time: 15 days or less after order confirmed.
5.Why choose us?
Technical Expertise
Experienced Management
Stringent Quality Control
Exemplary Service
Wide Product Range
Competitive Pricing
Huge branch network capable of catering worldwide
6.FAQ Steel Coupler Rebar Steel Tube Made in Shanghai China High Quality
Why Us?
We are one of the Top 500 in the world, largest construction materials supplier in China. Also we are a state-owned company and respond to every customer with large and also small orders.
We own professional manufacturers with powerful producing capacity.
Extensive and comprehensive quality control system
Excellent products with competitive prices.
Efficient services in pre and after sale.
Full energy with affluent experience team.
- Q: i have lived in york for ten years and have been told many times that the minster in york has had scaffolding up for decades and that it has to stay there for political or religious reason there is never any work done or indeed workers on the scaffolding. can anyone shed any light on the matter for me or is it just an urban myth and nothing more than on going restoration.
- Eee, by gum, Petey.....all ye hed te do wuz GOOGLE scaffolding on york minster, in'it? And y'eed a learned they's FIXING it reckon on it tekkin 'em ten year or moore!
- Q: What are the chances of cracking the tile? What can I do to avoid cracking the tile?This will be 3 levels of scaffolding on 6 inch wheels.
- Make sure you use the rubber wheels. Put a drop cloth under the scaffolding to prevent scratching or help cushion dropped objects. The tile shouldn't crack.
- Q: Latch type disc scaffolding accessories are national patent products?
- The utility model is mainly used for a light frame and a background frame of a large-scale concert Pankou, type multifunctional scaffold, the scaffold socket diameter of 133mm and thickness of 10mm disc, 8 hole disc, adopting 48*3.2mm, Q345A pipe master component, the vertical rod is in the pipe length of every 0.60m welding on a disc, rail connection using this novel and beautiful disk. The bottom with the connecting sleeve. The cross bar is made of a plug with a plug welded on both ends of the steel pipe.
- Q: Which kind of scaffolding is the most convenient and time-saving?
- 4, the new type of formwork is the most suitable for the early removal of the keel, through early demolition can save a lot of keel, formwork and support rod, saving about 30%.5, strong and durable, plug and socket is not afraid to fall, not easy to be dead by cement, easy to transport, easy to inventory. At the same time, there is no loss of spare parts, lower than the bowl buckle type multifunctional scaffold.
- Q: Fastener type steel pipe scaffold accessories
- Steel pipeScaffolding steel pipe should be used outside diameter 48mm, wall thickness of 3.5mm welded steel pipe, can also be used outside diameter 51mm, wall thickness of 3.1mm welded steel pipe. The maximum length of the steel pipe used for horizontal horizontal rod shall not be greater than 2m; the other rods shall not be more than 6.5m, and the maximum quality of each steel pipe shall not exceed 25kg, so as to be suitable for manual handling.
- Q: A 67.0- painter is on a uniform 21- scaffold supported from above by ropes. There is a 3.8- pail of paint to one side. The ropes are 1m inside the scaffold on each side. The pail is 1m away from the left rope and 3m from the right rope. The scaffold is a 6m. How close to the right end can he approach safely? How close to the left end can he approach safely?
- First of all...no units, no answer. Second of all...according to OSHA (Occupation Safety and Health Administration), NO ONE can walk on a scaffold beam outside the support ropes OR SET ANY OBJECT DOWN outside the support ropes. Hence the answers for both questions are 1 meter. It doesn't matter what a calculation will yield...NO ONE can walk on the beam outside the support ropes safely. Even if a torque balance yields that it will not put the ropes in compression and buckle them...it still isn't considered to be safe by OSHA if the painter is outside the ropes.
- Q: Are the terms quot;nuclear matrixquot; and quot;nuclear scaffoldquot; interchangeable? I know that when we talk about DNA compaction we say that MARs on the DNA attach to the nuclear scaffold. I am wondering if the scaffold is just a specific part of the matrix??
- For most purposes, they are interchangeable terms for the same things. Some people favor one term, some the other. The ones who favor matrix over scaffold or vice versa may have some argument as to why it is better or a difference but in general people use them interchangeably.
- Q: Because my friend wants it done but isn't sure :)
- In all honestly, I'd try to talk your friend out of getting that hip piercing. Surface piercings, especially one there, Will reject. I don't mean to sound negative, but have her put two dots where she would want the piercing, and move around as she does daily, she will see how much that area moves. The more movement = the less likely it will heal. They could reject after a month, they could reject after two years. It really depends. No matter how well the piercer, or how well she takes care of it, it will reject. I went to the best piercers in state to get my surface work (sternum, nape) done. I also took care of it by doing sea salt soaks once or twice a day. When that didn't work I used the LITHA (leave it the hell alone) method.The sternum rejected in six months, where the nape was doing great up until that two year mark. Then it started rejecting. If you want to see what a rejecting piercing looks like feel free to send me an Email, I have some pics of my sternum piercing early on - when it started rejecting, then a day or two before I took it out. It honestly looked horrible that few days before I took it out. The piercing place I go to won't do surface piercings on minors, so you have to be 18 for that one in Minnesota. For the scaffold/industrial, you have to be 16 with parental consent and 18 without in the United States.
- Q: scaffolding business?
- scaffold /, -f(@)ld/ · n. 1 a raised wooden platform used formerly for public executions. 2 a structure made using scaffolding. · v. attach scaffolding to. – DERIVATIVES scaffolder n. – ORIGIN ME: from Anglo-Norman Fr., from OFr. (e)schaffaut, from the base of catafalque.
- Q: Bowl buckle scaffold inspection and evaluation
- (2) the focus of quality inspection of structural parts:Steel tube wall thickness, welding quality, appearance quality, adjustable base and adjustable support rod diameter, and nut with gap and material.(3) scaffold erection shall be inspected at the stage:The first 1 paragraphs to a height of 6m for the first stage (left bottom stage) the inspection and acceptance;The 2 frame should be checked regularly with the progress of the construction, to achieve a comprehensive inspection and acceptance;3 cases of more than 6 winds, heavy rain, heavy snow after the special inspection;4 shutdown for more than a month before recovery.
Send your message to us
Steel Coupler Rebar Steel Tube Made in Shanghai China Made High Quality
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 5000 pc
- Supply Capability:
- 300000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords